Browse Arkansas Code titles and sections
42 U.S.C. § 8351 — Temporary exemptions
Federal law — U.S. Code and appendices · legal_authorities
Page 7594
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 8351
1 So in original. Probably should be ‘‘subsection’’.
at the time the proposed order is issued, covered
by a final rule issued under section 1 (b).
(b) Prohibitions applicable to categories of facili-
ties
(1) The Secretary may prohibit, by rule, the
use of natural gas or petroleum under section
8341(b) of this title in existing electric power-
plants.
(2) Each powerplant to be covered by any final
rule issued under this subsection shall be spe-
cifically identified in the proposed rule pub-
lished under section 8411(b) of this title.
(3) In prescribing any final rule under this sub-
section, the Secretary shall take into account
any special circumstances or characteristics of
each category of powerplants (such as the inter-
mittent use, size, age, or geographic location of
such powerplants). Any such rules shall not
apply in the case of any existing electric power-
plant with respect to which a comparable prohi-
bition was issued by order.
(Pub. L. 95–620, title III, § 303, Nov. 9, 1978, 92
Stat. 3306; Pub. L. 100–42, § 1(c)(9), May 21, 1987,
101 Stat. 312.)
Editorial Notes
AMENDMENTS
1987—Subsec. (a)(1). Pub. L. 100–42, § 1(c)(9)(A), (B),
struck out ‘‘or installation’’ after ‘‘powerplant’’ in two
places and ‘‘or 8342’’ after ‘‘section 8341(b) or (c)’’.
Subsec. (a)(2). Pub. L. 100–42, § 1(c)(9)(A), struck out
‘‘or installation’’ after ‘‘powerplant’’.
Subsec. (a)(3). Pub. L. 100–42, § 1(c)(9)(C), struck out
par. (3) which read as follows:
‘‘(A) Subject to subparagraph (B), the Secretary shall
not issue a final order under this subsection to any
powerplant if it is demonstrated that such powerplant
would have been granted an exemption if such prohibi-
tion had been established by a final r
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 8351
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 456280bb5233898fcd2932d3c32883f19731d2c3023f47996f414485ad903758. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-03b790671376e790a5573c47
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-8351-temporary-exemptions--022793850e.md
Pages: Not recorded – Not recorded
Passage SHA-256: 569eef4afcd9db2581d82d93213088c0cade9fe215fa20ca238b8175ffb31fb5
Source location: USCODE-2024-title42-chap92-subchapIII-partB-sec8351.pdf
Stored source content
Page 7594
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 8351
1 So in original. Probably should be ‘‘subsection’’.
at the time the proposed order is issued, covered
by a final rule issued under section 1 (b).
(b) Prohibitions applicable to categories of facili-
ties
(1) The Secretary may prohibit, by rule, the
use of natural gas or petroleum under section
8341(b) of this title in existing electric power-
plants.
(2) Each powerplant to be covered by any final
rule issued under this subsection shall be spe-
cifically identified in the proposed rule pub-
lished under section 8411(b) of this title.
(3) In prescribing any final rule under this sub-
section, the Secretary shall take into account
any special circumstances or characteristics of
each category of powerplants (such as the inter-
mittent use, size, age, or geographic location of
such powerplants). Any such rules shall not
apply in the case of any existing electric power-
plant with respect to which a comparable prohi-
bition was issued by order.
(Pub. L. 95–620, title III, § 303, Nov. 9, 1978, 92
Stat. 3306; Pub. L. 100–42, § 1(c)(9), May 21, 1987,
101 Stat. 312.)
Editorial Notes
AMENDMENTS
1987—Subsec. (a)(1). Pub. L. 100–42, § 1(c)(9)(A), (B),
struck out ‘‘or installation’’ after ‘‘powerplant’’ in two
places and ‘‘or 8342’’ after ‘‘section 8341(b) or (c)’’.
Subsec. (a)(2). Pub. L. 100–42, § 1(c)(9)(A), struck out
‘‘or installation’’ after ‘‘powerplant’’.
Subsec. (a)(3). Pub. L. 100–42, § 1(c)(9)(C), struck out
par. (3) which read as follows:
‘‘(A) Subject to subparagraph (B), the Secretary shall
not issue a final order under this subsection to any
powerplant if it is demonstrated that such powerplant
would have been granted an exemption if such prohibi-
tion had been established by a final rule pursuant to
subsection (b) rather than by order pursuant to this
subsection, except that if a temporary exemption would
have been granted, such a final order may be issued but
may not take effect until such time as the temporary
exemption would have terminated.
‘‘(B) In any case in which an order is not issued by
reason of subparagraph (A) or in which the effective
date of such order is delayed under subparagraph (A),
the Secretary shall take such steps as may be nec-
essary to assure the installation involved complies
with the same requirements (including provisions of
section 8354(a) of this title) as would have been applica-
ble if an exemption had been granted based upon the
grounds for which the order is not issued or the effec-
tive date of which is delayed.’’
Subsec. (b)(1). Pub. L. 100–42, § 1(c)(9)(D), amended par.
(1) generally. Prior to amendment, par. (1) read as fol-
lows: ‘‘The Secretary may, by rule, prohibit the use of
natural gas or petroleum pursuant to section 8341(b) or
8342(a) of this title—
‘‘(A) in the case of any category of existing electric
powerplants identified in such rule; and
‘‘(B) in the case of any category of existing major
fuel-burning installations which have design capabili-
ties of consuming fuel (or any mixture thereof) at a
fuel heat input rate of 300 million Btu’s per hour or
greater which are identified in such rule.’’
Subsec. (b)(2). Pub. L. 100–42, § 1(c)(9)(A), struck out
‘‘or installation’’ after ‘‘powerplant’’.
Subsec. (b)(3). Pub. L. 100–42, § 1(c)(9)(A), (E), struck
out ‘‘or installations’’ after ‘‘powerplants’’ in two
places in introductory provisions, and amended last
sentence generally. Prior to amendment, last sentence
read as follows: ‘‘Any such rules shall not apply in the
case of any existing electric powerplant with respect to
which a comparable prohibition was issued by order.’’
PART B—EXEMPTIONS
§ 8351. Temporary exemptions
(a) Temporary exemption due to lack of alter-
nate fuel supply, site limitations, or environ-
mental requirements
After consideration of a petition (and com-
ments thereon) for an exemption from one or
more of the prohibitions of part A for a power-
plant, the Secretary shall, by order, grant such
an exemption for the use of natural gas or petro-
leum, if he finds that the petitioner has dem-
onstrated that for the period of the proposed ex-
emption, despite diligent good faith efforts—
(1) it is likely that an adequate and reliable
supply of coal or other alternate fuel of the
quality necessary to conform with design and
operational requirements for use as a primary
energy source, will not be available to such
powerplant at a cost (taking into account as-
sociated facilities for the transportation and
use of such fuel) which, based upon the best
practicable estimates, does not substantially
exceed the costs, as determined by rule by the
Secretary, of using imported petroleum as a
primary energy source;
(2) one or more site limitations exist which
would not permit the operation of such a pow-
erplant using coal or any other alternate fuel
as a primary energy source; or
(3) the prohibitions of section 8341 of this
title could not be satisfied without violating
applicable environmental requirements.
(b) Temporary exemption based upon future use
of synthetic fuels
After consideration of a petition (and com-
ments thereon) for an exemption from one or
more of the prohibitions of part A for a power-
plant, the Secretary, by order, shall grant an ex-
emption under this subsection for the use of nat-
ural gas or petroleum, if he finds that the peti-
tioner has demonstrated that—
(1) the petitioner will comply with the prohi-
bitions of part A by the end of the proposed ex-
emption by the use of a synthetic fuel derived
from coal or another alternate fuel; and
(2) the petitioner is not able to comply with
such prohibitions by the use of such synthetic
fuel until the end of the proposed exemption.
The effectiveness of an exemption under this
subsection is conditioned on the petitioner filing
and maintaining a compliance plan meeting the
requirements of section 8354(b) of this title.
(c) Temporary exemption based upon use of in-
novative technologies
After consideration of a petition (and com-
ments thereon) for an exemption from one or
more of the prohibitions of part A for a power-
plant, the Secretary, by order, shall grant an ex-
emption under this subsection for the use of nat-
ural gas or petroleum, if he finds that the peti-
tioner has demonstrated that such powerplant
will comply with such prohibitions at the expi-
ration of such exemption by the adoption of a
technology for the use of coal or another alter-
Page 7595
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 8352
nate fuel which at the time of the granting of
the exemption is determined by the Secretary to
be an innovative technology. The effectiveness
of an exemption under this subsection is condi-
tioned on the petitioner filing and maintaining
a compliance plan meeting the requirements of
section 8354(b) of this title.
(d) Temporary exemption for units to be retired
(1) After consideration of a petition (and com-
ments thereon) for an exemption from one or
more of the prohibitions of part A for a power-
plant, the Secretary shall, by order, grant an ex-
emption under this subsection for the use of nat-
ural gas or petroleum, if he finds that the peti-
tioner has demonstrated that such powerplant is
to permanently cease operation at or before the
expiration of the exemption period. An exemp-
tion under this subsection is conditioned on the
petitioner filing and maintaining a compliance
plan meeting the requirements of section 8354(b)
(other than paragraph (1)(B)) of this title.
(2) Notwithstanding any other provision of
this chapter, an exemption under this part may
not be granted for any powerplant once an ex-
emption under this subsection has been granted
for such powerplant.
(e) Temporary public interest exemption
After consideration of a petition (and com-
ments thereon) for an exemption for a power-
plant from one or more of the prohibitions of
part A for a powerplant, the Secretary may, by
order, grant an exemption under this subsection
for the use of natural gas or petroleum, if he
finds that the petitioner has demonstrated that
for the period of the proposed exemption the
issuance of such exemption is in the public in-
terest and is consistent with the purposes of this
chapter.
(f) Temporary exemption for peakload power-
plants
After consideration of a petition (and com-
ments thereon) for an exemption from one or
more of the prohibitions of part A for a power-
plant, the Secretary shall, by order, grant an ex-
emption under this subsection for the use of nat-
ural gas or petroleum, if the petitioner certifies
that such powerplant is to be operated solely as
a peakload powerplant.
(g) Temporary exemption for powerplants where
necessary to maintain reliability of service
(1) After consideration of a petition (and com-
ments thereon) for an exemption from one or
more of the prohibitions of part A for a power-
plant, the Secretary shall, by order, grant an ex-
emption under this subsection for the use of nat-
ural gas or petroleum, if he finds that the peti-
tioner has demonstrated that such exemption is
necessary to prevent impairment of reliability
of service.
(2) Notwithstanding any other provision of
this chapter, an exemption under this part
(other than a permanent exemption under sec-
tion 8352(f) of this title for the use of petroleum)
may not be granted for any powerplant for
which an exemption under this subsection has
been granted.
(h) Duration of temporary exemptions
(1) Except as provided in paragraphs (2) and
(3), exemptions under this section for any
powerplant may not exceed, taking into account
any extension or renewal, 5 years.
(2)(A) An exemption under subsection (a)(1)
may be granted for a period of more than 5
years, but may not exceed, taking into account
any extension or renewal, 10 years.
(B) Subject to paragraph (3), an exemption
under subsections (b), (c), and (g) may be ex-
tended beyond the 5-year limit under paragraph
(1), but such exemption, so extended, may not
exceed 10 years.
(3) An exemption under subsections (d), (f),
and (g) for the use of natural gas by a power-
plant may not extend beyond December 31, 1994.
(4) In computing the 5-year and 10-year limita-
tions of paragraphs (1) and (2) in the case of any
exemption under this section, the period before
the prohibition on the use of natural gas and pe-
troleum would first apply (if the exemption had
not been granted) shall be disregarded.
(Pub. L. 95–620, title III, § 311, Nov. 9, 1978, 92
Stat. 3307; Pub. L. 100–42, § 1(c)(10), (11), May 21,
1987, 101 Stat. 313.)
Editorial Notes
REFERENCES IN TEXT
This chapter, referred to in subsecs. (d)(2), (e), and
(g)(2), was in the original ‘‘this Act’’, meaning Pub. L.
95–620, Nov. 9, 1978, 92 Stat. 3289, known as the Power-
plant and Industrial Fuel Use Act of 1978, which is clas-
sified principally to this chapter. For complete classi-
fication of this Act to the Code, see Short Title note
set out under section 8301 of this title and Tables.
AMENDMENTS
1987—Subsec. (a). Pub. L. 100–42, § 1(c)(10), (11), struck
out ‘‘or installation’’ after ‘‘powerplant’’ in introduc-
tory provisions and in pars. (1) and (2) and struck out
‘‘or 8342’’ after ‘‘section 8341’’ in par. (3).
Subsecs. (b) to (e), (h)(1). Pub. L. 100–42, § 1(c)(10),
struck out ‘‘or installation’’ after ‘‘powerplant’’ wher-
ever appearing.
Statutory Notes and Related Subsidiaries
EXEMPTION
FOR
CERTAIN
ELECTRIC
POWERPLANTS
AS
EFFECTIVE PRIOR
TO 180 DAYS AFTER NOVEMBER 9,
1978
For effectiveness of exemption for certain electric
powerplants as prior to 180 days after Nov. 9, 1978, see
section 902(a) of Pub. L. 95–620, set out as a note under
section 8301 of this title.
§ 8352. Permanent exemptions
(a) Permanent exemption due to lack of alter-
nate fuel supply, site limitations, or environ-
mental requirements
(1) After consideration of a petition (and com-
ments thereon) for an exemption from one or
more of the prohibitions of part A for a power-
plant, the Secretary shall, by order, grant a per-
manent exemption under this subsection for the
use of natural gas or petroleum, if he finds that
the petitioner has demonstrated that despite
diligent good faith efforts—
(A) it is likely that an adequate and reliable
supply of coal or other alternate fuels of the
quality necessary to conform with design and
operational requirements for use as a primary
energy source will not be available to such
powerplant at a cost (taking into account as-
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Temporary exemption due to lack of alternate fuel supply, site limitations, or environmental requirements** After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a powerplant, the Secretary shall, by order, grant such an exemption for the use of natural gas or petroleum, if he finds that the petitioner has demonstrated that for the period of the proposed exemption, despite diligent good faith efforts—
(1) it is likely that an adequate and reliable supply of coal or other alternate fuel of the quality necessary to conform with design and operational requirements for use as a primary energy source, will not be available to such powerplant at a cost (taking into account associated facilities for the transportation and use of such fuel) which, based upon the best practicable estimates, does not substantially exceed the costs, as determined by rule by the Secretary, of using imported petroleum as a primary energy source;
(2) one or more site limitations exist which would not permit the operation of such a powerplant using coal or any other alternate fuel as a primary energy source; or
(3) the prohibitions of [section 8341 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8341&num=0&edition=prelim) could not be satisfied without violating applicable environmental requirements.
**(b) Temporary exemption based upon future use of synthetic fuels** After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a powerplant, the Secretary, by order, shall grant an exemption under this subsection for the use of natural gas or petroleum, if he finds that the petitioner has demonstrated that—
(1) the p
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 8351
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.