Browse Arkansas Code titles and sections
16 U.S.C. § 837f — Purchaser priority on Pacific Northwest
Federal law — U.S. Code and appendices · legal_authorities
Page 1509
TITLE 16—CONSERVATION
§ 837h
Northwest in equal amounts during the same
Pacific Northwest refill period or the succeeding
storage drawdown period, (3) any hydroelectric
energy which will be returned to the Pacific
Northwest in equal amounts during the same
Pacific Northwest storage drawdown period, (4)
hydroelectric peaking capacity, or (5) surplus
peaking capacity for energy. All benefits from
such exchanges, including resulting increases of
firm power, shall be shared equitably by the
areas involved, having regard to the secondary
energy and other contributions made by each.
(Pub. L. 88–552, § 5, Aug. 31, 1964, 78 Stat. 758.)
§ 837e. Transmission lines for other electric en-
ergy; rates
Any capacity in Federal transmission lines
connecting, either by themselves or with non-
Federal lines, a generating plant in the Pacific
Northwest or Canada with the other area or
with any other area outside the Pacific North-
west, which is not required for the transmission
of Federal energy or the energy described in sec-
tion 837h of this title, shall be made available as
a carrier for transmission of other electric en-
ergy between such areas. The transmission of
other electric energy shall be at equitable rates
determined by the Secretary, but such rates
shall be subject to equitable adjustment at ap-
propriate intervals not less frequently than once
in every five years as agreed to by the parties.
No contract for the transmission of non-Federal
energy on a firm basis shall be affected by any
increase, subsequent to the execution of such
contract, in the requirements for transmission
of Federal energy, the energy described in sec-
tion 837h of this title, or other electric energy.
(Pub. L. 88–552, § 6, Aug. 31, 1964, 78 Stat. 758.)
§ 837f.
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 837f
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: dfbe7895b8220b52853f5d6d4403e00a8f0955592922997a7d02ea7e24ee4b7a. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-028c561d69a80e566b0bc11e
Source file: Laws/federal/codes/united-states-code-2024/title-16/section-837f-purchaser-priority-on-pacific-northwest--b2f4692dd1.md
Pages: Not recorded – Not recorded
Passage SHA-256: 37fe4e629f923d2f9b8410bf1410fb19cbd1504d4d79ba4996dbaab355535b74
Source location: USCODE-2024-title16-chap12F-sec837f.pdf
Stored source content
Page 1509
TITLE 16—CONSERVATION
§ 837h
Northwest in equal amounts during the same
Pacific Northwest refill period or the succeeding
storage drawdown period, (3) any hydroelectric
energy which will be returned to the Pacific
Northwest in equal amounts during the same
Pacific Northwest storage drawdown period, (4)
hydroelectric peaking capacity, or (5) surplus
peaking capacity for energy. All benefits from
such exchanges, including resulting increases of
firm power, shall be shared equitably by the
areas involved, having regard to the secondary
energy and other contributions made by each.
(Pub. L. 88–552, § 5, Aug. 31, 1964, 78 Stat. 758.)
§ 837e. Transmission lines for other electric en-
ergy; rates
Any capacity in Federal transmission lines
connecting, either by themselves or with non-
Federal lines, a generating plant in the Pacific
Northwest or Canada with the other area or
with any other area outside the Pacific North-
west, which is not required for the transmission
of Federal energy or the energy described in sec-
tion 837h of this title, shall be made available as
a carrier for transmission of other electric en-
ergy between such areas. The transmission of
other electric energy shall be at equitable rates
determined by the Secretary, but such rates
shall be subject to equitable adjustment at ap-
propriate intervals not less frequently than once
in every five years as agreed to by the parties.
No contract for the transmission of non-Federal
energy on a firm basis shall be affected by any
increase, subsequent to the execution of such
contract, in the requirements for transmission
of Federal energy, the energy described in sec-
tion 837h of this title, or other electric energy.
(Pub. L. 88–552, § 6, Aug. 31, 1964, 78 Stat. 758.)
§ 837f. Purchaser priority on Pacific Northwest
power; amendment of existing contracts and
new contracts to include priority provisions
The Secretary shall offer to amend, without
imposing any other requirements as a condition
to such amendment, all existing contracts for
the sale or exchange of electric power generated
at Federal hydroelectric plants in the Pacific
Northwest to include, and shall include in all
new contracts, provisions giving the purchaser
priority on electric power generated at such
plants in conformity with the provisions of this
chapter.
(Pub. L. 88–552, § 7, Aug. 31, 1964, 78 Stat. 758.)
§ 837g. Transmission lines between Pacific North-
west and Pacific Southwest; prohibition
against construction of lines or related facili-
ties; exceptions of lines and facilities rec-
ommended by Secretary or authorized by
Congress; authority of Secretary to construct
other transmission lines unaffected
No electric transmission lines or related fa-
cilities shall be constructed by any Federal
agency outside the Pacific Northwest for the
purpose of transmitting electric energy between
the Pacific Northwest and Pacific Southwest,
nor shall any arrangement for transmission ca-
pacity be executed by any Federal agency for
the purpose of financing such lines and related
facilities to be constructed by non-Federal enti-
ties, except those lines and facilities rec-
ommended for Federal construction in the Re-
port of the Secretary of the Interior submitted
to Congress on June 24, 1964, as supplemented on
July 27, 1964, or as hereafter specifically author-
ized by Congress: Provided, That, except with re-
spect to electric transmission lines and related
facilities for the purpose of transmitting elec-
tric energy between the two regions above men-
tioned, nothing herein shall be construed as ex-
panding or diminishing in any way the present
authority of the Secretary of Energy to con-
struct transmission lines to market power and
energy.
(Pub. L. 88–552, § 8, Aug. 31, 1964, 78 Stat. 758;
Pub. L. 95–91, title III, § 302(a), Aug. 4, 1977, 91
Stat. 578.)
Statutory Notes and Related Subsidiaries
TRANSFER OF FUNCTIONS
‘‘Secretary of Energy’’ substituted for ‘‘Secretary of
the Interior’’ in the proviso in text pursuant to Pub. L.
95–91, § 302(a), which is classified to section 7152(a) of
Title 42, The Public Health and Welfare.
§ 837g–1. Construction of additional facilities by
Secretary of Energy for mutually beneficial
power sales between Pacific Northwest and
California; contribution of funds by non-Fed-
eral entities
Notwithstanding the provisions of section 837g
of this title, the Secretary of Energy is author-
ized to construct or participate in the construc-
tion of such additional facilities as he deems
necessary to allow mutually beneficial power
sales between the Pacific Northwest and Cali-
fornia and to accept funds contributed by non-
Federal entities for that purpose.
(Pub. L. 98–360, title III, July 16, 1984, 98 Stat.
416.)
Editorial Notes
CODIFICATION
Section was not enacted as part of Pub. L. 88–552
which comprises this chapter.
§ 837h. Provisions not applicable to Canyon
Ferry project or benefits and exchanges
under Treaty between Canada and United
States; preference of power users in Montana
not modified
The provisions of this chapter shall not be ap-
plicable to (1) the Canyon Ferry project and (2),
except as provided in section 837e of this title,
downstream power benefits to which Canada is
entitled under the treaty between Canada and
the United States relating to the cooperative de-
velopment of the water resources of the Colum-
bia River Basin, signed at Washington, January
17, 1961, nor to energy or capacity disposed of to
Canada in any exchange pursuant to paragraph
1 or 2 of article VIII thereof. Nothing in this
chapter shall be construed to modify the geo-
graphical preference of power users in the State
of Montana which is established by the Hungry
Horse Dam Act (Act of June 4, 1944, 58 Stat. 270),
as amended.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
The Secretary shall offer to amend, without imposing any other requirements as a condition to such amendment, all existing contracts for the sale or exchange of electric power generated at Federal hydroelectric plants in the Pacific Northwest to include, and shall include in all new contracts, provisions giving the purchaser priority on electric power generated at such plants in conformity with the provisions of this chapter.
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 837f
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.