16 U.S.C. § 837f — Purchaser priority on Pacific Northwest

Page 1509 TITLE 16—CONSERVATION § 837h Northwest in equal amounts during the same Pacific Northwest refill period or the succeeding storage drawdown period, (3) any hydroelectric energy which will be returned to the Pacific Northwest in equal amounts during the same Pacific Northwest storage drawdown period, (4) hydroelectric peaking capacity, or (5) surplus peaking capacity for energy. All benefits from such exchanges, including resulting increases of firm power, shall be shared equitably by the areas involved, having regard to the secondary energy and other contributions made by each. (Pub. L. 88–552, § 5, Aug. 31, 1964, 78 Stat. 758.) § 837e. Transmission lines for other electric en- ergy; rates Any capacity in Federal transmission lines connecting, either by themselves or with non- Federal lines, a generating plant in the Pacific Northwest or Canada with the other area or with any other area outside the Pacific North- west, which is not required for the transmission of Federal energy or the energy described in sec- tion 837h of this title, shall be made available as a carrier for transmission of other electric en- ergy between such areas. The transmission of other electric energy shall be at equitable rates determined by the Secretary, but such rates shall be subject to equitable adjustment at ap- propriate intervals not less frequently than once in every five years as agreed to by the parties. No contract for the transmission of non-Federal energy on a firm basis shall be affected by any increase, subsequent to the execution of such contract, in the requirements for transmission of Federal energy, the energy described in sec- tion 837h of this title, or other electric energy. (Pub. L. 88–552, § 6, Aug. 31, 1964, 78 Stat. 758.) § 837f.

Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 837f

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: dfbe7895b8220b52853f5d6d4403e00a8f0955592922997a7d02ea7e24ee4b7a. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-028c561d69a80e566b0bc11e
Source file: Laws/federal/codes/united-states-code-2024/title-16/section-837f-purchaser-priority-on-pacific-northwest--b2f4692dd1.md
Pages: Not recorded – Not recorded
Passage SHA-256: 37fe4e629f923d2f9b8410bf1410fb19cbd1504d4d79ba4996dbaab355535b74

Source location: USCODE-2024-title16-chap12F-sec837f.pdf

Stored source content

Page 1509 TITLE 16—CONSERVATION § 837h Northwest in equal amounts during the same Pacific Northwest refill period or the succeeding storage drawdown period, (3) any hydroelectric energy which will be returned to the Pacific Northwest in equal amounts during the same Pacific Northwest storage drawdown period, (4) hydroelectric peaking capacity, or (5) surplus peaking capacity for energy. All benefits from such exchanges, including resulting increases of firm power, shall be shared equitably by the areas involved, having regard to the secondary energy and other contributions made by each. (Pub. L. 88–552, § 5, Aug. 31, 1964, 78 Stat. 758.) § 837e. Transmission lines for other electric en- ergy; rates Any capacity in Federal transmission lines connecting, either by themselves or with non- Federal lines, a generating plant in the Pacific Northwest or Canada with the other area or with any other area outside the Pacific North- west, which is not required for the transmission of Federal energy or the energy described in sec- tion 837h of this title, shall be made available as a carrier for transmission of other electric en- ergy between such areas. The transmission of other electric energy shall be at equitable rates determined by the Secretary, but such rates shall be subject to equitable adjustment at ap- propriate intervals not less frequently than once in every five years as agreed to by the parties. No contract for the transmission of non-Federal energy on a firm basis shall be affected by any increase, subsequent to the execution of such contract, in the requirements for transmission of Federal energy, the energy described in sec- tion 837h of this title, or other electric energy. (Pub. L. 88–552, § 6, Aug. 31, 1964, 78 Stat. 758.) § 837f. Purchaser priority on Pacific Northwest power; amendment of existing contracts and new contracts to include priority provisions The Secretary shall offer to amend, without imposing any other requirements as a condition to such amendment, all existing contracts for the sale or exchange of electric power generated at Federal hydroelectric plants in the Pacific Northwest to include, and shall include in all new contracts, provisions giving the purchaser priority on electric power generated at such plants in conformity with the provisions of this chapter. (Pub. L. 88–552, § 7, Aug. 31, 1964, 78 Stat. 758.) § 837g. Transmission lines between Pacific North- west and Pacific Southwest; prohibition against construction of lines or related facili- ties; exceptions of lines and facilities rec- ommended by Secretary or authorized by Congress; authority of Secretary to construct other transmission lines unaffected No electric transmission lines or related fa- cilities shall be constructed by any Federal agency outside the Pacific Northwest for the purpose of transmitting electric energy between the Pacific Northwest and Pacific Southwest, nor shall any arrangement for transmission ca- pacity be executed by any Federal agency for the purpose of financing such lines and related facilities to be constructed by non-Federal enti- ties, except those lines and facilities rec- ommended for Federal construction in the Re- port of the Secretary of the Interior submitted to Congress on June 24, 1964, as supplemented on July 27, 1964, or as hereafter specifically author- ized by Congress: Provided, That, except with re- spect to electric transmission lines and related facilities for the purpose of transmitting elec- tric energy between the two regions above men- tioned, nothing herein shall be construed as ex- panding or diminishing in any way the present authority of the Secretary of Energy to con- struct transmission lines to market power and energy. (Pub. L. 88–552, § 8, Aug. 31, 1964, 78 Stat. 758; Pub. L. 95–91, title III, § 302(a), Aug. 4, 1977, 91 Stat. 578.) Statutory Notes and Related Subsidiaries TRANSFER OF FUNCTIONS ‘‘Secretary of Energy’’ substituted for ‘‘Secretary of the Interior’’ in the proviso in text pursuant to Pub. L. 95–91, § 302(a), which is classified to section 7152(a) of Title 42, The Public Health and Welfare. § 837g–1. Construction of additional facilities by Secretary of Energy for mutually beneficial power sales between Pacific Northwest and California; contribution of funds by non-Fed- eral entities Notwithstanding the provisions of section 837g of this title, the Secretary of Energy is author- ized to construct or participate in the construc- tion of such additional facilities as he deems necessary to allow mutually beneficial power sales between the Pacific Northwest and Cali- fornia and to accept funds contributed by non- Federal entities for that purpose. (Pub. L. 98–360, title III, July 16, 1984, 98 Stat. 416.) Editorial Notes CODIFICATION Section was not enacted as part of Pub. L. 88–552 which comprises this chapter. § 837h. Provisions not applicable to Canyon Ferry project or benefits and exchanges under Treaty between Canada and United States; preference of power users in Montana not modified The provisions of this chapter shall not be ap- plicable to (1) the Canyon Ferry project and (2), except as provided in section 837e of this title, downstream power benefits to which Canada is entitled under the treaty between Canada and the United States relating to the cooperative de- velopment of the water resources of the Colum- bia River Basin, signed at Washington, January 17, 1961, nor to energy or capacity disposed of to Canada in any exchange pursuant to paragraph 1 or 2 of article VIII thereof. Nothing in this chapter shall be construed to modify the geo- graphical preference of power users in the State of Montana which is established by the Hungry Horse Dam Act (Act of June 4, 1944, 58 Stat. 270), as amended.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 837f — Purchaser priority on Pacific Northwest power; amendment of existing contracts and new contracts to include priority provisions

The Secretary shall offer to amend, without imposing any other requirements as a condition to such amendment, all existing contracts for the sale or exchange of electric power generated at Federal hydroelectric plants in the Pacific Northwest to include, and shall include in all new contracts, provisions giving the purchaser priority on electric power generated at such plants in conformity with the provisions of this chapter.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 837f

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.