Browse Arkansas Code titles and sections
42 U.S.C. § 7420 — Noncompliance penalty
Federal law — U.S. Code and appendices · legal_authorities
Page 7244
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7420
1 See References in Text note below.
was classified to section 1857c–10 of this title and pro-
vided for the authority to deal with energy shortages,
prior to repeal by Pub. L. 95–95, title I, § 112(b)(1), Aug.
7, 1977, 91 Stat. 709, which provided that all references
to such section 119 in any subsequent enactment which
supersedes Pub. L. 93–319 shall be construed to refer to
section 113(d) of the Clean Air Act and to paragraph (5)
thereof in particular which is classified to section
7413(d)(5) of this title.
AMENDMENTS
1977—Subsec. (a)(3). Pub. L. 95–190, § 14(a)(25), added
par. (3).
Subsec. (d)(3). Pub. L. 95–190, § 14(a)(26), substituted
‘‘7621’’ for ‘‘7619’’.
Subsec. (e). Pub. L. 95–190, § 14(a)(27), substituted ‘‘an
order under this section’’ for ‘‘such order’’.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Section effective Aug. 7, 1977, except as otherwise ex-
pressly provided, see section 406(d) of Pub. L. 95–95, set
out as an Effective Date of 1977 Amendment note under
section 7401 of this title.
MODIFICATION OR RESCISSION OF RULES, REGULATIONS,
ORDERS,
DETERMINATIONS,
CONTRACTS,
CERTIFI-
CATIONS, AUTHORIZATIONS, DELEGATIONS, AND OTHER
ACTIONS
All rules, regulations, orders, determinations, con-
tracts, certifications, authorizations, delegations, or
other actions duly issued, made, or taken by or pursu-
ant to act July 14, 1955, the Clean Air Act, as in effect
immediately prior to the date of enactment of Pub. L.
95–95 [Aug. 7, 1977] to continue in full force and effect
until modified or rescinded in accordance with act July
14, 1955, as amended by Pub. L. 95–95 [this chapter], see
section 406(b) of Pub. L. 95–95, set out as an Effective
Date of 1977 Amendment n
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 7420
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 74ac49d238382815fc0be8586524463c96487c787c04347ca1174d50d469f43c. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-011d58071f2d7b9d1ef51390
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-7420-noncompliance-penalty--16da62fa5b.md
Pages: Not recorded – Not recorded
Passage SHA-256: 5665e7bf6686e54100cc6bc3660fd10924f9c580e6d79ff299fc07cfbb6184c6
Source location: USCODE-2024-title42-chap85-subchapI-partA-sec7420.pdf
Stored source content
Page 7244
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7420
1 See References in Text note below.
was classified to section 1857c–10 of this title and pro-
vided for the authority to deal with energy shortages,
prior to repeal by Pub. L. 95–95, title I, § 112(b)(1), Aug.
7, 1977, 91 Stat. 709, which provided that all references
to such section 119 in any subsequent enactment which
supersedes Pub. L. 93–319 shall be construed to refer to
section 113(d) of the Clean Air Act and to paragraph (5)
thereof in particular which is classified to section
7413(d)(5) of this title.
AMENDMENTS
1977—Subsec. (a)(3). Pub. L. 95–190, § 14(a)(25), added
par. (3).
Subsec. (d)(3). Pub. L. 95–190, § 14(a)(26), substituted
‘‘7621’’ for ‘‘7619’’.
Subsec. (e). Pub. L. 95–190, § 14(a)(27), substituted ‘‘an
order under this section’’ for ‘‘such order’’.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Section effective Aug. 7, 1977, except as otherwise ex-
pressly provided, see section 406(d) of Pub. L. 95–95, set
out as an Effective Date of 1977 Amendment note under
section 7401 of this title.
MODIFICATION OR RESCISSION OF RULES, REGULATIONS,
ORDERS,
DETERMINATIONS,
CONTRACTS,
CERTIFI-
CATIONS, AUTHORIZATIONS, DELEGATIONS, AND OTHER
ACTIONS
All rules, regulations, orders, determinations, con-
tracts, certifications, authorizations, delegations, or
other actions duly issued, made, or taken by or pursu-
ant to act July 14, 1955, the Clean Air Act, as in effect
immediately prior to the date of enactment of Pub. L.
95–95 [Aug. 7, 1977] to continue in full force and effect
until modified or rescinded in accordance with act July
14, 1955, as amended by Pub. L. 95–95 [this chapter], see
section 406(b) of Pub. L. 95–95, set out as an Effective
Date of 1977 Amendment note under section 7401 of this
title.
§ 7420. Noncompliance penalty
(a) Assessment and collection
(1)(A) Not later than 6 months after August 7,
1977, and after notice and opportunity for a pub-
lic hearing, the Administrator shall promulgate
regulations requiring the assessment and collec-
tion of a noncompliance penalty against persons
referred to in paragraph (2)(A).
(B)(i) Each State may develop and submit to
the Administrator a plan for carrying out this
section in such State. If the Administrator finds
that the State plan meets the requirements of
this section, he may delegate to such State any
authority he has to carry out this section.
(ii) Notwithstanding a delegation to a State
under clause (i), the Administrator may carry
out this section in such State under the cir-
cumstances described in subsection (b)(2)(B).
(2)(A) Except as provided in subparagraph (B)
or (C) of this paragraph, the State or the Admin-
istrator shall assess and collect a noncompli-
ance penalty against every person who owns or
operates—
(i) a major stationary source (other than a
primary nonferrous smelter which has re-
ceived a primary nonferrous smelter order
under section 7419 of this title), which is not in
compliance with any emission limitation,
emission standard or compliance schedule
under any applicable implementation plan
(whether or not such source is subject to a
Federal or State consent decree), or
(ii) a stationary source which is not in com-
pliance with an emission limitation, emission
standard, standard of performance, or other
requirement established under section 7411,
7477, 7603, or 7412 of this title, or
(iii) a stationary source which is not in com-
pliance with any requirement of subchapter
IV–A, V, or VI of this chapter, or
(iv) any source referred to in clause (i), (ii),
or (iii) (for which an extension, order, or sus-
pension referred to in subparagraph (B), or
Federal or State consent decree is in effect),
or a primary nonferrous smelter which has re-
ceived a primary nonferrous smelter order
under section 7419 of this title which is not in
compliance with any interim emission control
requirement or schedule of compliance under
such extension, order, suspension, or consent
decree.
For purposes of subsection (d)(2), in the case of
a penalty assessed with respect to a source re-
ferred to in clause (iii) of this subparagraph, the
costs referred to in such subsection (d)(2) shall
be the economic value of noncompliance with
the interim emission control requirement or the
remaining steps in the schedule of compliance
referred to in such clause.
(B) Notwithstanding the requirements of sub-
paragraph (A)(i) and (ii), the owner or operator
of any source shall be exempted from the duty
to pay a noncompliance penalty under such re-
quirements with respect to that source if, in ac-
cordance with the procedures in subsection
(b)(5), the owner or operator demonstrates that
the failure of such source to comply with any
such requirement is due solely to—
(i) a conversion by such source from the
burning of petroleum products or natural gas,
or both, as the permanent primary energy
source to the burning of coal pursuant to an
order under section 7413(d)(5) 1 of this title or
section 1857c–10 1 of this title (as in effect be-
fore August 7, 1977);
(ii) in the case of a coal-burning source
granted an extension under the second sen-
tence of section 1857c–10(c)(1) 1 of this title (as
in effect before August 7, 1977), a prohibition
from using petroleum products or natural gas
or both, by reason of an order under the provi-
sions of section 792(a) and (b) of title 15 or
under any legislation which amends or super-
sedes such provisions;
(iii) the use of innovative technology sanc-
tioned by an enforcement order under section
7413(d)(4) 1 of this title;
(iv) an inability to comply with any such re-
quirement, for which inability the source has
received an order under section 7413(d) 1 of this
title (or an order under section 7413 of this
title issued before August 7, 1977) which has
the effect of permitting a delay or violation of
any requirement of this chapter (including a
requirement of an applicable implementation
plan) which inability results from reasons en-
tirely beyond the control of the owner or oper-
ator of such source or of any entity control-
ling, controlled by, or under common control
with the owner or operator of such source; or
Page 7245
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7420
(v) the conditions by reason of which a tem-
porary emergency suspension is authorized
under section 7410(f) or (g) of this title.
An exemption under this subparagraph shall
cease to be effective if the source fails to comply
with the interim emission control requirements
or schedules of compliance (including incre-
ments of progress) under any such extension,
order, or suspension.
(C) The Administrator may, after notice and
opportunity for public hearing, exempt any
source from the requirements of this section
with respect to a particular instance of non-
compliance if he finds that such instance of non-
compliance is de minimis in nature and in dura-
tion.
(b) Regulations
Regulations under subsection (a) shall—
(1) permit the assessment and collection of
such penalty by the State if the State has a
delegation of authority in effect under sub-
section (a)(1)(B)(i) of this section;
(2) provide for the assessment and collection
of such penalty by the Administrator, if—
(A) the State does not have a delegation of
authority
in
effect
under
subsection
(a)(1)(B)(i), or
(B) the State has such a delegation in ef-
fect but fails with respect to any particular
person or source to assess or collect the pen-
alty in accordance with the requirements of
this section;
(3) require the States, or in the event the
States fail to do so, the Administrator, to give
a brief but reasonably specific notice of non-
compliance under this section to each person
referred to in subsection (a)(2)(A) with respect
to each source owned or operated by such per-
son which is not in compliance as provided in
such subsection, not later than July 1, 1979, or
thirty days after the discovery of such non-
compliance, whichever is later;
(4) require each person to whom notice is
given under paragraph (3) to—
(A) calculate the amount of the penalty
owed (determined in accordance with sub-
section (d)(2)) and the schedule of payments
(determined in accordance with subsection
(d)(3)) for each such source and, within
forty-five days after the issuance of such no-
tice or after the denial of a petition under
subparagraph (B), to submit that calculation
and proposed schedule, together with the in-
formation necessary for an independent
verification thereof, to the State and to the
Administrator, or
(B) submit a petition, within forty–five
days after the issuance of such notice, chal-
lenging such notice of noncompliance or al-
leging entitlement to an exemption under
subsection (a)(2)(B) with respect to a par-
ticular source;
(5) require the Administrator to provide a
hearing on the record (within the meaning of
subchapter II of chapter 5 of title 5) and to
make a decision on such petition (including
findings of fact and conclusions of law) not
later than ninety days after the receipt of any
petition under paragraph (4)(B), unless the
State agrees to provide a hearing which is sub-
stantially similar to such a hearing on the
record and to make a decision on such petition
(including such findings and conclusions)
within such ninety-day period;
(6)(A) authorize the Administrator on his
own initiative to review the decision of the
State under paragraph (5) and disapprove it if
it is not in accordance with the requirements
of this section, and (B) require the Adminis-
trator to do so not later than sixty days after
receipt of a petition under this subparagraph,
notice, and public hearing and a showing by
such petitioner that the State decision under
paragraph (5) is not in accordance with the re-
quirements of this section;
(7) require payment, in accordance with sub-
section (d), of the penalty by each person to
whom notice of noncompliance is given under
paragraph (3) with respect to each noncom-
plying source for which such notice is given
unless there has been a final determination
granting a petition under paragraph (4)(B)
with respect to such source;
(8) authorize the State or the Administrator
to adjust (and from time to time to readjust)
the amount of the penalty assessment cal-
culated or the payment schedule proposed by
such owner or operator under paragraph (4), if
the Administrator finds after notice and op-
portunity for a hearing on the record that the
penalty or schedule does not meet the require-
ments of this section; and
(9) require a final adjustment of the penalty
within 180 days after such source comes into
compliance in accordance with subsection
(d)(4).
In any case in which the State establishes a non-
compliance penalty under this section, the State
shall provide notice thereof to the Adminis-
trator. A noncompliance penalty established by
a State under this section shall apply unless the
Administrator, within ninety days after the date
of receipt of notice of the State penalty assess-
ment under this section, objects in writing to
the amount of the penalty as less than would be
required to comply with guidelines established
by the Administrator. If the Administrator ob-
jects, he shall immediately establish a sub-
stitute noncompliance penalty applicable to
such source.
(c) Contract to assist in determining amount of
penalty assessment or payment schedule
If the owner or operator of any stationary
source to whom a notice is issued under sub-
section (b)(3)—
(1) does not submit a timely petition under
subsection (b)(4)(B), or
(2) submits a petition under subsection
(b)(4)(B) which is denied, and
fails to submit a calculation of the penalty as-
sessment, a schedule for payment, and the infor-
mation necessary for independent verification
thereof, the State (or the Administrator, as the
case may be) may enter into a contract with any
person who has no financial interest in the
owner or operator of the source (or in any per-
son controlling, controlled by or under common
control with such source) to assist in deter-
Page 7246
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7420
mining the amount of the penalty assessment or
payment schedule with respect to such source.
The cost of carrying out such contract may be
added to the penalty to be assessed against the
owner or operator of such source.
(d) Payment
(1) All penalties assessed by the Administrator
under this section shall be paid to the United
States Treasury. All penalties assessed by the
State under this section shall be paid to such
State.
(2) The amount of the penalty which shall be
assessed and collected with respect to any
source under this section shall be equal to—
(A) the amount determined in accordance
with regulations promulgated by the Adminis-
trator under subsection (a), which is no less
than the economic value which a delay in
compliance beyond July 1, 1979, may have for
the owner of such source, including the quar-
terly equivalent of the capital costs of compli-
ance and debt service over a normal amortiza-
tion period, not to exceed ten years, operation
and maintenance costs foregone as a result of
noncompliance, and any additional economic
value which such a delay may have for the
owner or operator of such source, minus
(B) the amount of any expenditure made by
the owner or operator of that source during
any such quarter for the purpose of bringing
that source into, and maintaining compliance
with, such requirement, to the extent that
such expenditures have not been taken into
account in the calculation of the penalty
under subparagraph (A).
To the extent that any expenditure under sub-
paragraph (B) made during any quarter is not
subtracted for such quarter from the costs under
subparagraph (A), such expenditure may be sub-
tracted for any subsequent quarter from such
costs. In no event shall the amount paid be less
than the quarterly payment minus the amount
attributed to actual cost of construction.
(3)(A) The assessed penalty required under this
section shall be paid in quarterly installments
for the period of covered noncompliance. All
quarterly payments (determined without regard
to any adjustment or any subtraction under
paragraph (2)(B)) after the first payment shall
be equal.
(B) The first payment shall be due on the date
six months after the date of issuance of the no-
tice of noncompliance under subsection (b)(3)
with respect to any source or on January 1, 1980,
whichever is later. Such first payment shall be
in the amount of the quarterly installment for
the upcoming quarter, plus the amount owed for
any preceding period within the period of cov-
ered noncompliance for such source.
(C) For the purpose of this section, the term
‘‘period of covered noncompliance’’ means the
period which begins—
(i) two years after August 7, 1977, in the case
of a source for which notice of noncompliance
under subsection (b)(3) is issued on or before
the date two years after August 7, 1977, or
(ii) on the date of issuance of the notice of
noncompliance under subsection (b)(3), in the
case of a source for which such notice is issued
after July 1, 1979,
and ending on the date on which such source
comes into (or for the purpose of establishing
the schedule of payments, is estimated to come
into) compliance with such requirement.
(4) Upon making a determination that a
source with respect to which a penalty has been
paid under this section is in compliance and is
maintaining compliance with the applicable re-
quirement, the State (or the Administrator as
the case may be) shall review the actual expend-
itures made by the owner or operator of such
source for the purpose of attaining and main-
taining compliance, and shall within 180 days
after such source comes into compliance—
(A) provide reimbursement with interest (to
be paid by the State or Secretary of the Treas-
ury, as the case may be) at appropriate pre-
vailing rates (as determined by the Secretary
of the Treasury) for any overpayment by such
person, or
(B) assess and collect an additional payment
with interest at appropriate prevailing rates
(as determined by the Secretary of the Treas-
ury) for any underpayment by such person.
(5) Any person who fails to pay the amount of
any penalty with respect to any source under
this section on a timely basis shall be required
to pay in addition a quarterly nonpayment pen-
alty for each quarter during which such failure
to pay persists. Such nonpayment penalty shall
be in an amount equal to 20 percent of the aggre-
gate amount of such person’s penalties and non-
payment penalties with respect to such source
which are unpaid as of the beginning of such
quarter.
(e) Judicial review
Any action pursuant to this section, including
any objection of the Administrator under the
last sentence of subsection (b), shall be consid-
ered a final action for purposes of judicial re-
view of any penalty under section 7607 of this
title.
(f) Other orders, payments, sanctions, or require-
ments
Any orders, payments, sanctions, or other re-
quirements under this section shall be in addi-
tion to any other permits, orders, payments,
sanctions, or other requirements established
under this chapter, and shall in no way affect
any civil or criminal enforcement proceedings
brought under any provision of this chapter or
State or local law.
(g) More stringent emission limitations or other
requirements
In the case of any emission limitation or other
requirement approved or promulgated by the
Administrator under this chapter after August
7, 1977, which is more stringent than the emis-
sion limitation or requirement for the source in
effect prior to such approval or promulgation, if
any, or where there was no emission limitation
or requirement approved or promulgated before
August 7, 1977, the date for imposition of the
non-compliance penalty under this section, shall
be either July 1, 1979, or the date on which the
source is required to be in full compliance with
such emission limitation or requirement, which-
ever is later, but in no event later than three
years after the approval or promulgation of such
emission limitation or requirement.
Page 7247
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7421
1 See References in Text note below.
2 So in original.
(July 14, 1955, ch. 360, title I, § 120, as added Pub.
L. 95–95, title I, § 118, Aug. 7, 1977, 91 Stat. 714;
amended Pub. L. 95–190, § 14(a)(28)–(38), Nov. 16,
1977, 91 Stat. 1401; Pub. L. 101–549, title VII,
§ 710(a), Nov. 15, 1990, 104 Stat. 2684.)
Editorial Notes
REFERENCES IN TEXT
Section 7413(d) of this title, referred to in subsec.
(a)(2)(B), was amended generally by Pub. L. 101–549,
title VII, § 701, Nov. 15, 1990, 104 Stat. 2672, and, as so
amended, no longer relates to final compliance orders.
Section 1857c–10 of this title (as in effect before Au-
gust 7, 1977), referred to in subsec. (a)(2)(B)(i), was in
the original ‘‘section 119 (as in effect before the date of
the enactment of the Clean Air Act Amendments of
1977)’’, meaning section 119 of act July 14, 1955, ch. 360,
title I, as added June 22, 1974, Pub. L. 93–319, § 3, 88 Stat.
248, (which was classified to section 1857c–10 of this
title) as in effect prior to the enactment of Pub. L.
95–95, Aug. 7, 1977, 91 Stat. 691, effective Aug. 7, 1977.
Section 112(b)(1) of Pub. L. 95–95 repealed section 119 of
act July 14, 1955, ch. 360, title I, as added by Pub. L.
93–319, and provided that all references to such section
119 in any subsequent enactment which supersedes Pub.
L. 93–319 shall be construed to refer to section 113(d) of
the Clean Air Act and to paragraph (5) thereof in par-
ticular which is classified to subsec. (d)(5) of section
7413 of this title. Section 7413(d) of this title was subse-
quently amended generally by Pub. L. 101–549, title VII,
§ 701, Nov. 15, 1990, 104 Stat. 2672, and, as so amended, no
longer relates to final compliance orders. Section 117(b)
of Pub. L. 95–95 added a new section 119 of act July 14,
1955, which is classified to section 7419 of this title.
Section 1857c–10(c)(1) of this title (as in effect before
August 7, 1977), referred to in subsec. (a)(2)(B)(ii), was
in the original ‘‘section 119(c)(1) (as in effect before the
date of the enactment of the Clean Air Act Amend-
ments of 1977).’’ See paragraph set out above for expla-
nation of codification.
AMENDMENTS
1990—Subsec. (a)(2)(A). Pub. L. 101–549 inserted ref-
erence to sections 7477 and 7603 of this title in cl. (ii),
added cl. (iii), and redesignated former cl. (iii) as (iv)
and inserted reference to cl. (iii).
1977—Subsec. (a)(2)(A). Pub. L. 95–190, § 14(a)(28), (29),
in cls. (i) and (iii) inserted provisions relating to con-
sent decrees wherever appearing.
Subsec. (a)(2)(B). Pub. L. 95–190, § 14(a)(30), (31), in cl.
(i) inserted reference to section 7413(d)(5) of this title,
and in cls. (i) and (ii) inserted provision relating to or-
ders in effect under section 1857c–10 of this title before
Aug. 7, 1977, wherever appearing.
Subsec. (b). Pub. L. 95–190, § 14(a)(34)–(36), in closing
provisions inserted provisions relating to notice to the
Administrator when a noncompliance penalty is estab-
lished by a State, and substituted references to non-
compliance for references to delayed compliance in two
places, ‘‘source’’ for ‘‘facility’’, and ‘‘receipt of notice
of the State penalty assessment’’ for ‘‘publication of
the proposed penalty’’.
Subsec. (b)(2)(A). Pub. L. 95–190, § 14(a)(33), sub-
stituted ‘‘(a)(1)(B)(i)’’ for ‘‘(e)’’.
Subsec. (b)(8). Pub. L. 95–190, § 14(a)(32), substituted
‘‘(4)’’ for ‘‘(6)’’.
Subsec. (d)(2)(A). Pub. L. 95–190, § 14(a)(37), inserted
provisions relating to inclusion of the economic value
of a delay in compliance, and substituted ‘‘such a
delay’’ for ‘‘a delay in compliance beyond July 1, 1979,’’.
Subsec. (e). Pub. L. 95–190, § 14(a)(38), substituted
‘‘subsection, shall’’ for ‘‘subsection shall’’.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Section effective Aug. 7, 1977, except as otherwise ex-
pressly provided, see section 406(d) of Pub. L. 95–95, set
out as an Effective Date of 1977 Amendment note under
section 7401 of this title.
§ 7421. Consultation
In carrying out the requirements of this chap-
ter requiring applicable implementation plans
to contain—
(1) any transportation controls, air quality
maintenance
plan
requirements
or
preconstruction review of direct sources of air
pollution, or
(2) any measure referred to—
(A) in part D (pertaining to nonattainment
requirements), or
(B) in part C (pertaining to prevention of
significant deterioration),
and in carrying out the requirements of section
7413(d) 1 of this title (relating to certain enforce-
ment orders), the State shall provide a satisfac-
tory process of consultation with general pur-
pose local governments, designated organiza-
tions of elected officials of local governments
and any Federal land manager having authority
over Federal land to which the State plan ap-
plies, effective with respect to any such require-
ment which is adopted more than one year after
August 7, 1977, as part of such plan. Such process
shall be in accordance with regulations promul-
gated by the Administrator to assure adequate
consultation. The Administrator shall update as
necessary the original regulations required and
promulgated under this section (as in effect im-
mediately before November 15, 1990) to ensure
adequate consultation. Only a general purpose
unit of local government, regional agency, or
council of governments adversely affected by ac-
tion of the Administrator approving any portion
of a plan referred to in this subsection 2 may pe-
tition for judicial review of such action on the
basis of a violation of the requirements of this
section.
(July 14, 1955, ch. 360, title I, § 121, as added Pub.
L. 95–95, title I, § 119, Aug. 7, 1977, 91 Stat. 719;
amended Pub. L. 101–549, title I, § 108(h), Nov. 15,
1990, 104 Stat. 2467.)
Editorial Notes
REFERENCES IN TEXT
Section 7413(d) of this title, referred to in text, was
amended generally by Pub. L. 101–549, title VII, § 701,
Nov. 15, 1990, 104 Stat. 2672, and, as so amended, no
longer relates to final compliance orders.
AMENDMENTS
1990—Pub. L. 101–549 amended penultimate sentence
generally. Prior to amendment, penultimate sentence
read as follows: ‘‘Such regulations shall be promulgated
after notice and opportunity for public hearing and not
later than 6 months after August 7, 1977.’’
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Section effective Aug. 7, 1977, except as otherwise ex-
pressly provided, see section 406(d) of Pub. L. 95–95, set
out as an Effective Date of 1977 Amendment note under
section 7401 of this title.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Assessment and collection**
(1)
(A) Not later than 6 months after August 7, 1977, and after notice and opportunity for a public hearing, the Administrator shall promulgate regulations requiring the assessment and collection of a noncompliance penalty against persons referred to in paragraph (2)(A).
(B)
(i) Each State may develop and submit to the Administrator a plan for carrying out this section in such State. If the Administrator finds that the State plan meets the requirements of this section, he may delegate to such State any authority he has to carry out this section.
(ii) Notwithstanding a delegation to a State under clause (i), the Administrator may carry out this section in such State under the circumstances described in subsection (b)(2)(B).
(2)
(A) Except as provided in subparagraph (B) or (C) of this paragraph, the State or the Administrator shall assess and collect a noncompliance penalty against every person who owns or operates—
(i) a major stationary source (other than a primary nonferrous smelter which has received a primary nonferrous smelter order under [section 7419 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7419&num=0&edition=prelim)), which is not in compliance with any emission limitation, emission standard or compliance schedule under any applicable implementation plan (whether or not such source is subject to a Federal or State consent decree), or
(ii) a stationary source which is not in compliance with an emission limitation, emission standard, standard of performance, or other requirement established under section 7411, 7477, 7603, or 7412 of this title, or
(iii) a stationary source which is not in compliance with any requirement of subchapter IV–A, V, or
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7420
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.