Arkansas Legal Resource Navigator

43 U.S.C. § 617t — Short title

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 617t — Short title

The short title of this subchapter shall be “Boulder Canyon Project Act.”

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 617t

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 555064b4f7964932d663e5dedd59611e9656f08ba17dafadfc2ed5641ab940a4. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_fff4421cc31e0a9a8d328757
Source file: Laws/federal/codes/united-states-code/title-43/section-617t-short-title--fe77b7386a.md
Pages: Not recorded – Not recorded
Passage SHA-256: 063322c43818017eb1adfeec5af07df79571277eb18692b4db54165e72ccc76f

Source location: Title 43, Chapter 12A, § 617t; chapter-12a-boulder-canyon-project.md

Stored source content

The short title of this subchapter shall be “Boulder Canyon Project Act.”

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

12 U.S.C. § 1730f to 1730i — Miscellaneous mortgage insurance

**(a) Projects covered** Notwithstanding any of the provisions of this chapter and without regard to limitations upon eligibility contained in any section or subchapter of this chapter, other than the limitation in [section 1709(g) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title12-section1709/g&num=0&edition=prelim), the Secretary is authorized, upon application by the mortgagee, to insure or make commitments to insure under any section or subchapter of this chapter any mortgage— (1) executed in connection with the sale by the Government, or any agency or official thereof, of any housing acquired or constructed under Public Law 849, Seventy-sixth Congress, as amended; Public Law 781, Seventy-sixth Congress, as amended; or Public Laws 9, 73, or 353, Seventy-seventh Congress, as amended (including any property acquired, held, or constructed in connection with such housing or to serve the inhabitants thereof); or (2) executed in connection with the sale by the Secretary of Housing and Urban Development, or by any public housing agency with the approval of the Secretary, of any housing (including any property acquired, held, or constructed in connection with such housing or to serve the inhabitants thereof) owned or financially assisted pursuant to the provisions of Public Law 671, Seventy-sixth Congress; or (3) executed in connection with the sale by the Government, or any agency or official thereof, of any of the so-called Greenbelt towns, or parts thereof, including projects, or parts thereof, known as Greenhills, Ohio; Greenbelt, Maryland; and Greendale, Wisconsin, developed under the Emergency Relief Appropriation Act of 1935, or of any of the village properties or employee’s housing under the jurisdiction of Tennessee Valley Author

Source: Supplied U.S. Code snapshot — release unconfirmed · 12 U.S.C. § 1730f to 1730i

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 410aaa–26 — Utility rights-of-way

Nothing in this part shall have the effect of terminating any validly issued right-of-way or customary operation, maintenance, repair, and replacement activities in such right-of-way, issued, granted, or permitted to the Metropolitan Water District pursuant to the Boulder Canyon Project Act ([43 U.S.C. 617–619b](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617–619b&num=0&edition=prelim)), which is located on lands included in the Joshua Tree National Park, but outside lands designated as wilderness under section 601(a)(2). Such activities shall be conducted in a manner which will minimize the impact on park resources. Nothing in this part shall have the effect of terminating the fee title to lands or customary operation, maintenance, repair, and replacement activities on or under such lands granted to the Metropolitan Water District pursuant to the Act of June 18, 1932 (47 Stat. 324), which are located on lands included in the Joshua Tree National Park, but outside lands designated as wilderness under section 601(a)(2). Such activities shall be conducted in a manner which will minimize the impact on park resources. The Secretary shall prepare within one hundred and eighty days after October 31, 1994, in consultation with the Metropolitan Water District, plans for emergency access by the Metropolitan Water District to its lands and rights-of-way.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 410aaa–26

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 410aaa–73 — Land disposal

Except as provided in [section 410aaa–26 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section410aaa-26&num=0&edition=prelim), none of the lands within the boundaries of the wilderness or park areas designated under this Act shall be granted to or otherwise made available for use by the Metropolitan Water District or any other agencies or persons pursuant to the Boulder Canyon Project Act ([43 U.S.C. 617–619b](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617–619b&num=0&edition=prelim)) or any similar Acts.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 410aaa–73

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1524 — Water furnished from Central Arizona Project

**(a) Restriction on use of water for irrigation** Unless and until otherwise provided by Congress, water from the Central Arizona Project shall not be made available directly or indirectly for the irrigation of lands not having a recent irrigation history as determined by the Secretary, except in the case of Indian lands, national wildlife refuges, and, with the approval of the Secretary, State-administered wildlife management areas. **(b) Contracts with municipal and industrial users** (1) Irrigation and municipal and industrial water supply under the Central Arizona Project within the State of Arizona may, in the event the Secretary determines that it is necessary to effect repayment, be pursuant to master contracts with organizations which have power to levy assessments against all taxable real property within their boundaries. The terms and conditions of contracts or other arrangements whereby each such organization makes water from the Central Arizona Project available to users within its boundaries shall be subject to the Secretary’s approval, and the United States shall, if the Secretary determines such action is desirable to facilitate carrying out the provisions of this chapter, have the right to require that it be a party to such contracts or that contracts subsidiary to the master contracts be entered into between the United States and any user. The provisions of this clause (1) shall not apply to the supplying of water to an Indian tribe for use within the boundaries of an Indian reservation. (2) Any obligation assumed pursuant to [section 485h(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section485h/d&num=0&edition=prelim) with respect to any project contract unit or irrigation block shall be repaid over a basic

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1524

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1551 — Construction of Colorado River Basin Act

**(a) Effect on other laws** Nothing in this chapter shall be construed to alter, amend, repeal, modify, or be in conflict with the provisions of the Colorado River Compact (45 Stat. 1057), the Upper Colorado River Basin Compact (63 Stat. 31), the Water Treaty of 1944 with the United Mexican States (Treaty Series 994; 59 Stat. 1219), the decree entered by the Supreme Court of the United States in Arizona against California and others (376 U.S. 340), or, except as otherwise provided herein, the Boulder Canyon Project Act (45 Stat. 1057) [[43 U.S.C. 617](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617&num=0&edition=prelim) et seq.], the Boulder Canyon Project Adjustment Act (54 Stat. 774), [[43 U.S.C. 618](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618&num=0&edition=prelim) et seq.], or the Colorado River Storage Project Act (70 Stat. 105) [[43 U.S.C. 620](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620&num=0&edition=prelim) et seq.]. **(b) Reports to Congress** The Secretary is directed to— (1) make reports as to the annual consumptive uses and losses of water from the Colorado River system after each successive five-year period, beginning with the five-year period starting on October 1, 1970. Such reports shall include a detailed breakdown of the beneficial consumptive use of water on a State-by-State basis. Specific figures on quantities consumptively used from the major tributary streams flowing into the Colorado River shall also be included on a State-by-State basis. Such reports shall be prepared in consultation with the States of the lower basin individually and with the Upper Colorado River Commission, and shall be transmitted to the President, the Congress, and to t

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1551

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1552 — Criteria for long-range operation of reservoirs

**(a) Promulgation by Secretary; order of priorities** In order to comply with and carry out the provisions of the Colorado River Compact, the Upper Colorado River Basin Compact, and the Mexican Water Treaty, the Secretary shall propose criteria for the coordinated long-range operation of the reservoirs constructed and operated under the authority of the Colorado River Storage Project Act [[43 U.S.C. 620](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620&num=0&edition=prelim) et seq.], the Boulder Canyon Project Act [[43 U.S.C. 617](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617&num=0&edition=prelim) et seq.], and the Boulder Canyon Project Adjustment Act [[43 U.S.C. 618](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618&num=0&edition=prelim) et seq.]. To effect in part the purposes expressed in this paragraph, the criteria shall make provision for the storage of water in storage units of the Colorado River storage project and releases of water form Lake Powell in the following listed order of priority: (1) releases to supply one-half the deficiency described in article III(c) of the Colorado River Compact, if any such deficiency exists and is chargeable to the States of the Upper Division, but in any event such releases, if any, shall not be required in any year that the Secretary makes the determination and issues the proclamation specified in [section 1512 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1512&num=0&edition=prelim); (2) releases to comply with article III(d) of the Colorado River Compact, less such quantities of water delivered into the Colorado River below Lee Ferry to the credit of the States of the Upper Division

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1552

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1597 — Construction of provisions of subchapter

Except as provided in sections 620d(d)(5), 1543(g)(2), and 1595(b) of this title, with respect to the Colorado River Basin Project Act [[43 U.S.C. 1501](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1501&num=0&edition=prelim) et seq.] and the Colorado River Storage Project Act [[43 U.S.C. 620](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620&num=0&edition=prelim) et seq.], respectively, nothing in this subchapter shall be construed to alter, amend, repeal, modify, interpret, or be in conflict with the provisions of the Colorado River Compact (45 Stat. 1057), the Upper Colorado River Basin Compact (63 Stat. 31), the Water Treaty of 1944 with the United Mexican States (Treaty Series 994; 59 Stat. 1219), the decree entered by the Supreme Court of the United States in Arizona against California and others (376 U.S. 340), the Boulder Canyon Project Act (45 Stat. 1057) [[43 U.S.C. 617](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617&num=0&edition=prelim) et seq.], Boulder Canyon Project Adjustment Act (54 Stat. 774; [43 U.S.C. 618a](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618a&num=0&edition=prelim)) [[43 U.S.C. 618](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618&num=0&edition=prelim) et seq.], section 15 of the Colorado River Storage Project Act (70 Stat. 111; [43 U.S.C. 620n](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620n&num=0&edition=prelim)), the Colorado River Basin Project Act (82 Stat. 885), section 6 of the Fryingpan-Arkansas Project Act (76 Stat. 393) [[43 U.S.C. 616e](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section616e&num=0&edition=prelim)], se

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1597

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1600g — Priority of laws

Nothing contained in this chapter shall be construed to alter, amend, repeal, modify, interpret, or be in conflict with the provisions of the Colorado River Compact (45 Stat. 1057), the Upper Colorado River Basin Compact (63 Stat. 31), the Water Treaty of 1944 with the United Mexican States (Treaty Series 944, 59 Stat. 1219), the Flood Control Act of 1944 (58 Stat. 887), the decree entered by the Supreme Court of the United States in Arizona v. California, and others (376 U.S. 340), the Boulder Canyon Project Act (45 Stat. 1057) [[43 U.S.C. 617](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617&num=0&edition=prelim) et seq.], the Boulder Canyon Project Adjustment Act (54 Stat. 774; [43 U.S.C. 618a](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618a&num=0&edition=prelim)) [[43 U.S.C. 618](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618&num=0&edition=prelim) et seq.], the Colorado River Storage Project Act (70 Stat. 105; [43 U.S.C. 620](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620&num=0&edition=prelim)) [[43 U.S.C. 620](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620&num=0&edition=prelim) et seq.], the Colorado River Basin Project Act (82 Stat. 885; [43 U.S.C. 1501](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1501&num=0&edition=prelim)) [[43 U.S.C. 1501](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1501&num=0&edition=prelim) et seq.]. Furthermore, nothing contained in this chapter shall be construed as indicating an intent on the part of the Congress to change the existing relationship of other Federal laws to the law of a State, or a political subdivisi

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1600g

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 392a — Payment into reclamation fund of receipts from irrigation projects; transfer of power revenues to General Treasury after repayment of construction costs

All moneys received by the United States in connection with any irrigation projects, including the incidental power features thereof, constructed by the Secretary of the Interior through the Bureau of Reclamation, and financed in whole or in part with moneys heretofore or hereafter appropriated or allocated therefor by the Federal Government, shall be covered into the reclamation fund, except in cases where provision has been made by law or contract for the use of such revenues for the benefit of users of water from such project: Provided, That after the net revenues derived from the sale of power developed in connection with any of said projects shall have repaid those construction costs of such project allocated to power to be repaid by power revenues therefrom and shall no longer be required to meet the contractual obligations of the United States, then said net revenues derived from the sale of power developed in connection with such project shall, after the close of each fiscal year, be transferred to and covered into the General Treasury as “miscellaneous receipts”: Provided further, That nothing in this section shall be construed to amend the Boulder Canyon Project Act (45 Stat. 1057), as amended [[43 U.S.C. 617](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617&num=0&edition=prelim) et seq.], or to apply to irrigation projects of the Office of Indian Affairs.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 392a

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 618k — Definitions

The following terms wherever used in this subchapter shall have the following respective meanings:

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 618k

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.