Arkansas Legal Resource Navigator

10 U.S.C. § 2864 — Master plans for major military installations

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2864 — Master plans for major military installations

**(a) Plans Required.—** (1) At a time interval prescribed by the Secretary concerned (but not less frequently than once every 10 years), the commander of each major military installation under the jurisdiction of the Secretary shall ensure that an installation master plan is developed to address environmental planning, sustainable design and development, sustainable range planning, real property master planning, military installation resilience, and transportation planning. (2) To address the requirements under paragraph (1), each installation master plan shall include consideration of— (A) planning for compact and infill development; (B) horizontal and vertical mixed-use development; (C) the full lifecycle costs of real property planning decisions; (D) capacity planning through the establishment of growth boundaries around cantonment areas to focus development towards the core and preserve range and training space; and (E) energy and climate resiliency efforts and military installation resilience. (3) (A) The commander of a major military installation shall develop and update the master plan for that major military installation in consultation with representatives of the government of the State in which the installation is located and representatives of local governments in the vicinity of the installation to improve cooperation and consistency between the Department of Defense and such governments in addressing each component of the master plan described in paragraph (1). (B) The consultation required by subparagraph (A) is in addition to the consultation specifically required by subsection (b)(1) in connection with the transportation component of the master plan for a major military installation. **(b) Transportation Component.—** (1) The t

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2864

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 054f8524e7471cc2a5e1a7bc1a43cd71dbae7f0ddf1abc4c33b4541b378b8afe. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_fe35b1295f35d96b253c66b7
Source file: Laws/federal/codes/united-states-code/title-10/section-2864-master-plans-for-major-military-installations--6b371561ae.md
Pages: Not recorded – Not recorded
Passage SHA-256: 5cf275bab201f092ca72907688f1e181ac5373b948f0fd4b21ad6e56122d17eb

Source location: Title 10, Chapter 169, § 2864; chapter-169-military-construction-and-military-family-housing.md

Stored source content

**(a) Plans Required.—** (1) At a time interval prescribed by the Secretary concerned (but not less frequently than once every 10 years), the commander of each major military installation under the jurisdiction of the Secretary shall ensure that an installation master plan is developed to address environmental planning, sustainable design and development, sustainable range planning, real property master planning, military installation resilience, and transportation planning. (2) To address the requirements under paragraph (1), each installation master plan shall include consideration of— (A) planning for compact and infill development; (B) horizontal and vertical mixed-use development; (C) the full lifecycle costs of real property planning decisions; (D) capacity planning through the establishment of growth boundaries around cantonment areas to focus development towards the core and preserve range and training space; and (E) energy and climate resiliency efforts and military installation resilience. (3) (A) The commander of a major military installation shall develop and update the master plan for that major military installation in consultation with representatives of the government of the State in which the installation is located and representatives of local governments in the vicinity of the installation to improve cooperation and consistency between the Department of Defense and such governments in addressing each component of the master plan described in paragraph (1). (B) The consultation required by subparagraph (A) is in addition to the consultation specifically required by subsection (b)(1) in connection with the transportation component of the master plan for a major military installation. **(b) Transportation Component.—** (1) The transportation component of the master plan for a major military installation shall be developed and updated in consultation with the metropolitan planning organization designated for the metropolitan planning area in which the military installation is located. (2) To address the requirements under subsection (a) and paragraph (1), each installation master plan shall include consideration of ways to diversify and connect transit systems. **(c) Military Installation Resilience Component.—** To address military installation resilience under subsection (a)(1), each installation master plan shall discuss the following: (1) Risks and threats to military installation resilience that exist at the time of the development of the plan and that are projected for the future, including from extreme weather events, mean sea level fluctuation, wildfires, flooding, and other changes in environmental conditions. (2) Assets or infrastructure located on the military installation vulnerable to the risks and threats described in paragraph (1), with a special emphasis on assets or infrastructure critical to the mission of the installation and the mission of members of the armed forces. (3) Lessons learned from the impacts of extreme weather events, including changes made to the military installation to address such impacts, since the prior master plan developed under this section. (4) Ongoing or planned infrastructure projects or other measures, as of the time of the development of the plan, to mitigate the impacts of the risks and threats described in paragraph (1). (5) Community infrastructure and resources located outside the installation (such as medical facilities, transportation systems, and energy infrastructure) that are— (A) necessary to maintain mission capability or that impact the resilience of the military installation; and (B) vulnerable to the risks and threats described in paragraph (1). (6) Agreements in effect or planned, as of the time of the development of the plan, with public or private entities for the purpose of maintaining or enhancing military installation resilience or resilience of the community infrastructure and resources described in paragraph (5). (7) Extent of current coordination efforts and plans for additional coordination, as of the time of the development of the plan, with public or private entities for the purpose of maintaining or enhancing military installation resilience or resilience of the community infrastructure and resources described in paragraph (5). (8) Projections from recognized governmental and scientific entities such as the Census Bureau, the National Academies of Sciences, the United States Geological Survey, and the United States Global Change Research Office (or any similar successor entities) with respect to future risks and threats (including the risks and threats described in paragraph (1)) to the resilience of any project considered in the installation master plan during the 50-year lifespan of the installation. **(d) Report.—** Not later than March 1 of each year, the Secretary of Defense shall submit to the congressional defense committees a report listing all master plans completed pursuant to this section in the prior calendar year. **(e) Definitions.—** In this section: (1) The term “major military installation” has the meaning given to the term “large site” in the most recent version of the Department of Defense Base Structure Report issued before the time interval prescribed for development of installation master plans arises under subsection (a). (2) The terms “metropolitan planning area” and “metropolitan planning organization” have the meanings given those terms in [section 134(b) of title 23](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title23-section134/b&num=0&edition=prelim) and [section 5303(b) of title 49](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title49-section5303/b&num=0&edition=prelim). (3) The term “energy and climate resiliency” means anticipation, preparation for, and adaptation to utility disruptions and changing environmental conditions and the ability to withstand, respond to, and recover rapidly from utility disruptions while ensuring the sustainment of mission-critical operations. (4) The term “military installation resilience” has the meaning given that term in section 101(e) 11 See References in Text note below. of this title.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2925 — Annual report on energy performance, resilience, and readiness of Department of Defense

**(a) Report Required.—** Not later than 240 days after the end of each fiscal year, the Secretary of Defense shall submit to the congressional defense committees a report detailing the fulfillment during that fiscal year of the authorities and requirements under sections 2688, 2911, 2912, 2920, and 2926 of this title, including progress on energy resilience at military installations and the use of operational energy in combat platforms and at contingency locations. **(b) Elements.—** Each report under subsection (a) shall include the following: (1) For the year covered by the report, the following: (A) A description of the progress made to achieve the goals of the Energy Policy Act of 2005 (Public Law 109–58), [section 2911(g) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section2911/g&num=0&edition=prelim), and the Energy Independence and Security Act of 2007 (Public Law 110–140). (B) A description of the energy savings, return on investment, and enhancements to installation mission assurance realized by the fulfillment of the goals described in subparagraph (A). (C) A description of and progress toward the energy security, resilience, and performance goals and master planning for the Department of Defense, including associated metrics pursuant to subsections (c) and (d) of [section 2911 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section2911&num=0&edition=prelim) and requirements under [section 2688(g) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section2688/g&num=0&edition=prelim). (D) An evaluation of progress made by the Department in implementing the operational energy strategy of the Department, including the progress of key initiati

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2925

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 118b — National Defense Sustainment and Logistics Review

**(a) Review Required.—** Upon submission of each national defense strategy under [section 113(g) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section113/g&num=0&edition=prelim), the Secretary of Defense shall conduct a comprehensive review of the sustainment and logistics requirements necessary to support the force structure, force modernization, infrastructure, force deployment capabilities, response to risks to military installation resilience, and other elements of the defense program and policies of the United States during the subsequent 5-, 10-, and 25-year periods. Each such review shall be known as the ‘National Defense Sustainment and Logistics Review’. Each such review shall be conducted in consultation with the Secretaries of the military departments, the Chiefs of Staff of the Armed Forces, all functional and geographic combatant commanders, and the Director of the Defense Logistics Agency. **(b) Report to Congress.—** (1) Not later than the first Monday in February of the year following the fiscal year during which the National Defense Strategy was submitted under [section 113(g) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section113/g&num=0&edition=prelim), the Secretary shall submit to the congressional defense committees a report on the review required by subsection (a). Each such report shall include each of the following: (A) An assessment of the strategic, operational, and tactical maritime logistics force (including non-military assets provided by Military Sealift Command, the Maritime Administration, and through the Voluntary Intermodal Sealift Agreement and Voluntary Tanker Agreement) required to support sealift, at sea logistics, and over-the-shore logistics of fo

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 118b

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 118a — Quadrennial quality of life review

**(a) Review Required.—** (1) The Secretary of Defense shall every four years conduct a comprehensive examination of the quality of life of the members of the armed forces (to be known as the “quadrennial quality of life review”). The review shall include examination of the programs, projects, and activities of the Department of Defense, including the morale, welfare, and recreation activities. (2) The quadrennial quality of life review shall be designed to result in determinations, and to foster policies and actions, that reflect the priority given the quality of life of members of the armed forces as a primary concern of the Department of Defense leadership. **(b) Conduct of Review.—** Each quadrennial quality of life review shall be conducted so as— (1) to assess quality of life priorities and issues consistent with the most recent National Security Strategy prescribed by the President pursuant to section 108 of the National Security Act of 1947 ([50 U.S.C. 3043](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title50-section3043&num=0&edition=prelim)); (2) to identify actions that are needed in order to provide members of the armed forces with the quality of life reasonably necessary to encourage the successful execution of the full range of missions that the members are called on to perform under the national security strategy; and (3) to identify other actions that have the potential for improving the quality of life of the members of the armed forces. **(c) Considerations.—** The Secretary shall consider addressing the following matters as part of the quadrennial quality of life review: (1) Infrastructure. (2) Military construction. (3) Physical conditions at military installations and other Department of Defense facilities. (4) Budget pla

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 118a

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2285 — Department of Defense Climate Resilience Infrastructure Initiative

**(a) Designation.—** The programs, practices, and activities carried out pursuant to this section shall be known collectively as the “Climate Resilience Infrastructure Initiative of the Department of Defense”. **(b) Hardening and Quick Recovery.—** In carrying out military installation resilience plans pursuant to [section 2864 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section2864&num=0&edition=prelim), the Secretary of Defense shall ensure that the development by the Department of Defense of requirements for backup utilities, communications, and transportation to ensure that the critical infrastructure of Department facilities is hardened, developed, and constructed for quick recovery from natural disasters and the impacts of extreme weather. **(c) Sustainment and Modernization.—** The Secretary shall develop sustainment and modernization requirements for facilities of the Department in connection with climate resilience. **(d) Collaboration in Planning With Local Communities.—** The Secretary shall develop, within existing frameworks for collaborative activities between military installations and State and local communities, and in addition to the requirements of [section 2864(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section2864/c&num=0&edition=prelim), a framework that authorizes and directs installation commanders to engage with State, regional, and local agencies, and with local communities, on planning for climate resilience, to enhance efficient response to impacts of extreme weather and secure collaborative investment in infrastructure that is resilient to the current and projected impacts of extreme weather. **(e) Testing and Training Range Lands.—** (1) **Practices fo

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2285

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2802 — Military construction projects

**(a)** The Secretary of Defense and the Secretaries of the military departments may carry out such military construction projects, land acquisitions, and defense access road projects (as described under [section 210 of title 23](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title23-section210&num=0&edition=prelim)) as are authorized by law. **(b)** Authority provided by law to carry out a military construction project includes authority for— (1) surveys and site preparation; (2) acquisition, conversion, rehabilitation, and installation of facilities; (3) acquisition and installation of equipment and appurtenances integral to the project; (4) acquisition and installation of supporting facilities (including utilities) and appurtenances incident to the project; (5) planning, supervision, administration, and overhead incident to the project; and (6) personnel and personal services contracts required to carry out paragraphs (1) through (5). **(c)** In determining the scope of a proposed military construction project, the Secretary concerned shall submit to the President such recommendations as the Secretary considers to be appropriate regarding the incorporation and inclusion of life-cycle cost-effective practices as an element in the project documents submitted to Congress in connection with the budget submitted pursuant to [section 1105 of title 31](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section1105&num=0&edition=prelim) for the fiscal year in which a contract is proposed to be awarded for the project. **(d)** Repealed. Pub. L. 114–328, div. B, title XXVIII, § 2811(b), Dec. 23, 2016, 130 Stat. 2716.] **(e)** (1) If a construction project, land acquisition, or defense access road project described in paragraph (2) wil

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2802

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2911 — Energy policy of the Department of Defense

**(a) General Energy Policy.—** The Secretary of Defense shall ensure the readiness of the armed forces for their military missions by pursuing energy security and energy resilience. **(b) Authorities.—** In order to achieve the policy set forth in subsection (a), the Secretary of Defense may— (1) establish metrics and standards for the assessment of energy resilience; (2) require the Secretary of a military department to perform mission assurance and readiness assessments of energy power systems for mission critical assets and supporting infrastructure, applying uniform mission standards established by the Secretary of Defense; (3) require the Secretary of a military department to establish and maintain an energy resilience master plan for an installation; (4) authorize the use of energy security and energy resilience, including the benefits of on-site generation resources that reduce or avoid the cost of backup power, as factors in the cost-benefit analysis for procurement of energy; and (5) in selecting facility energy projects that will use renewable energy sources, pursue energy security and energy resilience by giving favorable consideration to projects that provide power directly to a military facility or into the installation electrical distribution network. **(c) Energy Performance Goals.—** (1) The Secretary of Defense shall submit to the congressional defense committees the energy performance goals for the Department of Defense regarding transportation systems, support systems, utilities, and infrastructure and facilities. (2) The energy performance goals shall be submitted annually not later than the date on which the President submits to Congress the budget for the next fiscal year under [section 1105 of title 31](https://uscode.house.gov/view.xhtm

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2911

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2864 — Master plans for major military installa-

Page 2285 TITLE 10—ARMED FORCES § 2864 1 See Temporary Expansion of Authority for Use of One-Step Turn-Key Procedures for Repair Projects note below. (2) A repair project (as defined in section 2811(e) of this title) with an approved cost equal to or less than $4,000,000.1 (3) The construction of a facility as part of an authorized security assistance activity. (b) DEFINITIONS.—In this section: (1) The term ‘‘one-step turn-key selection procedures’’ means procedures used for the se- lection of a contractor on the basis of price and other evaluation criteria to perform, in accordance with the provisions of a firm fixed- price contract, both the design and construc- tion of a facility using performance specifica- tions supplied by the Secretary concerned. (2) The term ‘‘security assistance activity’’ means— (A) humanitarian and civic assistance au- thorized by sections 401 and 2561 of this title; (B) foreign disaster assistance authorized by section 404 of this title; (C) foreign military construction sales au- thorized by section 29 of the Arms Export Control Act (22 U.S.C. 2769); (D) foreign assistance authorized under sections 607 and 632 of the Foreign Assist- ance Act of 1961 (22 U.S.C. 2357, 2392); and (E) other international security assistance specifically authorized by law. (Added Pub. L. 99–167, title VIII, § 807(a), Dec. 3, 1985, 99 Stat. 988; amended Pub. L. 100–26, § 7(k)(3), Apr. 21, 1987, 101 Stat. 284; Pub. L. 100–180, div. B, subdiv. 3, title I, § 2301, Dec. 4, 1987, 101 Stat. 1214; Pub. L. 101–189, div. B, title XXVIII, § 2806, Nov. 29, 1989, 103 Stat. 1647; Pub. L. 102–190, div. B, title XXVIII, § 2802, Dec. 5, 1991, 105 Stat. 1537; Pub. L. 113–291, div. B, title XXVIII, § 2804, Dec. 19, 2014, 128 Stat. 3697.) Editorial Note

Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 2864

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.