Browse Arkansas Code titles and sections
43 U.S.C. § 2213 — Availability of water on temporary basis
Federal law — U.S. Code and appendices · legal_authorities
**(a) General authority** In order to mitigate losses and damages resulting from drought conditions, the Secretary may make available, by temporary contract, project and nonproject water, and may permit the use of facilities at Federal Reclamation projects for the storage or conveyance of project or nonproject water, for use both within and outside an authorized project service area.
**(b) Special provisions applicable to temporary water supplies provided under this section**
(1) **Temporary supplies** — Each temporary contract for the supply of water entered into pursuant to this section shall terminate no later than two years from the date of execution or upon a determination by the Secretary that water supply conditions no longer warrant that such contracts remain in effect, whichever occurs first. The costs associated with any such contract shall be repaid within the term of the contract.
(2) **Ownership and acreage limitations** — Lands not subject to Reclamation law that receive temporary irrigation water supplies under temporary contracts under this section shall not become subject to the ownership and acreage limitations or pricing provisions of Federal Reclamation law because of the delivery of such temporary water supplies. Lands that are subject to the ownership and acreage limitations of Federal Reclamation law shall not be exempted from those limitations because of the delivery of such temporary water supplies.
(3) **Treatment under Reclamation Reform Act of 1982** — No temporary contract entered into by the Secretary under this section shall be treated as a “contract” as that term is used in sections 203(a) and 220 of the Reclamation Reform Act of 1982 (Public Law 97–293) [[43 U.S.C. 390cc(a)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-preli
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 2213
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: c8e99363054866cfe8956b740213f1e5a47d875df24773a80092fa579b01d9cc. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_eeaa2a46eea625a91669d157
Source file: Laws/federal/codes/united-states-code/title-43/section-2213-availability-of-water-on-temporary-basis--c5b3ae4e15.md
Pages: Not recorded – Not recorded
Passage SHA-256: 2c8be184b65d180a644cd982aa53575469f243d362ac217ed920223d0ae1eaa1
Source location: Title 43, Chapter 40, § 2213; chapter-040-reclamation-states-emergency-drought-relief.md
Stored source content
**(a) General authority** In order to mitigate losses and damages resulting from drought conditions, the Secretary may make available, by temporary contract, project and nonproject water, and may permit the use of facilities at Federal Reclamation projects for the storage or conveyance of project or nonproject water, for use both within and outside an authorized project service area.
**(b) Special provisions applicable to temporary water supplies provided under this section**
(1) **Temporary supplies** — Each temporary contract for the supply of water entered into pursuant to this section shall terminate no later than two years from the date of execution or upon a determination by the Secretary that water supply conditions no longer warrant that such contracts remain in effect, whichever occurs first. The costs associated with any such contract shall be repaid within the term of the contract.
(2) **Ownership and acreage limitations** — Lands not subject to Reclamation law that receive temporary irrigation water supplies under temporary contracts under this section shall not become subject to the ownership and acreage limitations or pricing provisions of Federal Reclamation law because of the delivery of such temporary water supplies. Lands that are subject to the ownership and acreage limitations of Federal Reclamation law shall not be exempted from those limitations because of the delivery of such temporary water supplies.
(3) **Treatment under Reclamation Reform Act of 1982** — No temporary contract entered into by the Secretary under this section shall be treated as a “contract” as that term is used in sections 203(a) and 220 of the Reclamation Reform Act of 1982 (Public Law 97–293) [[43 U.S.C. 390cc(a)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section390cc/a&num=0&edition=prelim), 390tt].
(4) **Amendments of existing contracts** — Any amendment to an existing contract to allow a contractor to carry out the provisions of this subchapter shall not be considered a new and supplemental benefit for purposes of the Reclamation Reform Act of 1982 (Public Law 97–293) [[43 U.S.C. 390aa](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section390aa&num=0&edition=prelim) et seq.].
**(c) Contract price** The price for project water, other than water purchased pursuant to [section 2211(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section2211/c&num=0&edition=prelim), delivered under a temporary contract entered into by the Secretary under this section shall be at least sufficient to recover all Federal operation and maintenance costs and administrative costs, and an appropriate share of capital costs, including interest on such capital costs allocated to municipal and industrial water, except that, for project water delivered to nonproject landholdings, the price shall include full cost (as defined in section 202(3) of the Reclamation Reform Act of 1982 (Public Law 97–293; 96 Stat. 1263; [43 U.S.C. 390bb](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section390bb&num=0&edition=prelim)) [[43 U.S.C. 390bb(3)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section390bb/3&num=0&edition=prelim)]). For all contracts entered into by the Secretary under the authority of this subchapter—
(1) the interest rate used for computing interest during construction and interest on the unpaid balance of the capital costs expended pursuant to this chapter shall be at a rate to be determined by the Secretary of the Treasury based on average market yields on outstanding marketable obligations of the United States with remaining periods to maturity of one year occurring during the last month of the fiscal year preceding the date of execution of the temporary contract; or
(2) in the case of existing facilities the rate as authorized for that Federal Reclamation project; or
(3) in the absence of such authorized rate, the interest rate as determined by the Secretary of the Treasury as of the beginning of the fiscal year in which construction was initiated on the basis of the computed average interest rate payable by the Treasury upon its outstanding marketable public obligations which were neither due nor callable for redemption for fifteen years from date of issue: Provided, That for all deliveries of water for municipal and industrial purposes from existing facilities to nonproject contractors, the rate shall be as set forth in paragraph (1) of this subsection.
**(d) Fish and wildlife** The Secretary may make water from Federal Reclamation projects and nonproject water available on a nonreimbursable basis for the purposes of protecting or restoring fish and wildlife resources, including mitigation losses, that occur as a result of drought conditions or the operation of a Federal Reclamation project during drought conditions. The Secretary may store and convey project and nonproject water for fish and wildlife purposes, and may provide conveyance of any such water for both State and Federal wildlife habitat and for habitat held in private ownership. The Secretary may make available water for these purposes outside the authorized project service area. Use of the Federal storage and conveyance facilities for these purposes shall be on a nonreimbursable basis. Water made available by the Secretary in 1991 from the Central Valley Project, California, to the Grasslands Water District for the purpose of fish and wildlife shall be nonreimbursable.
**(e) Nonproject water** The Secretary is authorized to store and convey nonproject water utilizing Federal Reclamation project facilities for use outside and inside the authorized project service area for municipal and industrial uses, fish and wildlife, and agricultural uses. Except in the case of water supplied for fish and wildlife, which shall be nonreimbursable, the Secretary shall charge the recipients of such water for such use of Federal Reclamation project facilities at a rate established pursuant to subsection (c).
**(f) Reclamation Fund** The payment of capital costs attributable to the sale of project or nonproject water or the use of Federal Reclamation project facilities shall be covered into the Reclamation Fund and be placed to the credit of the project from which such water or use of such facilities is supplied.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
This subchapter shall amend and supplement the Act of June 17, 1902, and Acts supplementary thereto and amendatory thereof ([43 U.S.C. 371](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section371&num=0&edition=prelim)), hereinafter referred to as “Federal reclamation law”. This subchapter may be referred to as the “Reclamation Reform Act of 1982”.
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 390aa
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
As used in this subchapter:
(1) The term “contract” means any repayment or water service contract between the United States and a district providing for the payment of construction charges to the United States including normal operation, maintenance, and replacement costs pursuant to Federal reclamation law.
(2) The term “district” means any individual or any legal entity established under State law which has entered into a contract or is eligible to contract with the Secretary for irrigation water.
(3)
(A) The term “full cost” means an annual rate as determined by the Secretary that shall amortize the expenditures for construction properly allocable to irrigation facilities in service, including all operation and maintenance deficits funded, less payments, over such periods as may be required under Federal reclamation law or applicable contract provisions, with interest on both accruing from October 12, 1982, on costs outstanding at that date, or from the date incurred in the case of costs arising subsequent to October 12, 1982: Provided, That operation, maintenance, and replacement charges required under Federal reclamation law, including this subchapter, shall be collected in addition to the full cost charge.
(B) The interest rate used for expenditures made on or before October 12, 1982, shall be determined by the Secretary of the Treasury on the basis of the weighted average yield of all interest bearing, marketable issues sold by the Treasury during the fiscal year in which the expenditures by the United States were made, but shall not be less than 7½ per centum per annum.
(C) The interest rate used for expenditures made after October 12, 1982, shall be determined by the Secretary of the Treasury on the basis of the arithmetic average of—
(i) the r
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 390bb
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
### Statutory Notes
Section, act Aug. 4, 1910, ch. 140, § 1, 36 Stat. 270, provided that no new irrigation project on any Indian reservation, allotments, or lands, could be undertaken until it had been estimated for and a maximum limit of cost ascertained from surveys, plans, and reports submitted by chief irrigation engineer in Indian Service and approved by Commissioner of Indian Affairs and Secretary of the Interior, that such limit of cost could in no case be exceeded without express authorization of Congress, and that no project to cost in the aggregate to exceed $35,000 could be undertaken on any Indian reservation or allotment, without specific authority of Congress.
Source: Supplied U.S. Code snapshot — release unconfirmed · 25 U.S.C. § 383
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 623
TITLE 43—PUBLIC LANDS
§ 2214
(d) Fish and wildlife
The Secretary may make water from Federal
Reclamation projects and nonproject water
available on a nonreimbursable basis for the
purposes of protecting or restoring fish and
wildlife resources, including mitigation losses,
that occur as a result of drought conditions or
the operation of a Federal Reclamation project
during drought conditions. The Secretary may
store and convey project and nonproject water
for fish and wildlife purposes, and may provide
conveyance of any such water for both State and
Federal wildlife habitat and for habitat held in
private ownership. The Secretary may make
available water for these purposes outside the
authorized project service area. Use of the Fed-
eral storage and conveyance facilities for these
purposes shall be on a nonreimbursable basis.
Water made available by the Secretary in 1991
from the Central Valley Project, California, to
the Grasslands Water District for the purpose of
fish and wildlife shall be nonreimbursable.
(e) Nonproject water
The Secretary is authorized to store and con-
vey nonproject water utilizing Federal Reclama-
tion project facilities for use outside and inside
the authorized project service area for munic-
ipal and industrial uses, fish and wildlife, and
agricultural uses. Except in the case of water
supplied for fish and wildlife, which shall be
nonreimbursable, the Secretary shall charge the
recipients of such water for such use of Federal
Reclamation project facilities at a rate estab-
lished pursuant to subsection (c).
(f) Reclamation Fund
The payment of capital costs attributable to
the sale of project or nonproject water or the
use of Federal Reclamation project facilities
shall be covered into the Reclamation
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 2213
Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 119
TITLE 43—PUBLIC LANDS
§ 390bb
123 Stat. 1317, which related to the Lower Chino Dairy
Area desalination demonstration and reclamation
project, was omitted pursuant to subsec. (e) of section,
which provided that the section would have no effect
after the date that was 10 years after Mar. 30, 2009.
Section 390h–37, Pub. L. 102–575, title XVI, § 1654, as
added Pub. L. 111–11, title IX, § 9113(a), Mar. 30, 2009, 123
Stat. 1319, which related to the Oxnard, California,
water reclamation, reuse, and treatment project, was
omitted pursuant to subsec. (d) of section, which pro-
vided that the authority of the Secretary of the Inte-
rior to carry out any provisions of section terminated
10 years after Mar. 30, 2009.
§ 390h–38. Yucaipa Valley regional water supply
renewal project
(a) Authorization
The
Secretary,
in
cooperation
with
the
Yucaipa Valley Water District, may participate
in the design, planning, and construction of
projects to treat impaired surface water, re-
claim and reuse impaired groundwater, and pro-
vide brine disposal within the Santa Ana Water-
shed as described in the report submitted under
section 390h–4 of this title.
(b) Cost sharing
The Federal share of the cost of the project de-
scribed in subsection (a) shall not exceed 25 per-
cent of the total cost of the project.
(c) Limitation
Funds provided by the Secretary shall not be
used for operation or maintenance of the project
described in subsection (a).
(d) Authorization of appropriations
There is authorized to be appropriated to
carry out this section $20,000,000.
(Pub. L. 102–575, title XVI, § 1655, as added Pub.
L. 111–11, title IX, § 9114(a), Mar. 30, 2009, 123
Stat. 1320.)
§ 390h–39. City of Corona Water Utility, Cali-
fornia, water recycling and reuse pr
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 390aa
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 390aa. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 119
TITLE 43—PUBLIC LANDS
§ 390bb
123 Stat. 1317, which related to the Lower Chino Dairy
Area desalination demonstration and reclamation
project, was omitted pursuant to subsec. (e) of section,
which provided that the section would have no effect
after the date that was 10 years after Mar. 30, 2009.
Section 390h–37, Pub. L. 102–575, title XVI, § 1654, as
added Pub. L. 111–11, title IX, § 9113(a), Mar. 30, 2009, 123
Stat. 1319, which related to the Oxnard, California,
water reclamation, reuse, and treatment project, was
omitted pursuant to subsec. (d) of section, which pro-
vided that the authority of the Secretary of the Inte-
rior to carry out any provisions of section terminated
10 years after Mar. 30, 2009.
§ 390h–38. Yucaipa Valley regional water supply
renewal project
(a) Authorization
The
Secretary,
in
cooperation
with
the
Yucaipa Valley Water District, may participate
in the design, planning, and construction of
projects to treat impaired surface water, re-
claim and reuse impaired groundwater, and pro-
vide brine disposal within the Santa Ana Water-
shed as described in the report submitted under
section 390h–4 of this title.
(b) Cost sharing
The Federal share of the cost of the project de-
scribed in subsection (a) shall not exceed 25 per-
cent of the total cost of the project.
(c) Limitation
Funds provided by the Secretary shall not be
used for operation or maintenance of the project
described in subsection (a).
(d) Authorization of appropriations
There is authorized to be appropriated to
carry out this section $20,000,000.
(Pub. L. 102–575, title XVI, § 1655, as added Pub.
L. 111–11, title IX, § 9114(a), Mar. 30, 2009, 123
Stat. 1320.)
§ 390h–39. City of Corona Water Utility, Cali-
fornia, water recycling and reuse pr
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 390bb
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 390bb. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Generally** The provisions of this subchapter shall be applicable to any district which—
(1) enters into a contract with the Secretary subsequent to October 12, 1982;
(2) enters into any amendment of its contract with the Secretary subsequent to October 12, 1982, which enables the district to receive supplemental or additional benefits; or
(3) which amends its contract for the purpose of conforming to the provisions of this subchapter.
**(b) Amendment of existing contracts** Any district which has an existing contract with the Secretary as of October 12, 1982, which does not enter into an amendment of such contract as specified in subsection (a) shall be subject to Federal reclamation law in effect immediately prior to October 12, 1982, as that law is amended or supplemented by sections 209 through 230 of this title [[43 U.S.C. 390ii](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section390ii&num=0&edition=prelim)—390zz–1, 373a, 422e, 425b, 485h]. Within a district that does not enter into an amendment of its contract with the Secretary within four and one-half years of October 12, 1982, irrigation water may be delivered to lands leased in excess of a landholding of one hundred and sixty acres only if full cost, as defined in [section 390bb(3)(A) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section390bb/3/A&num=0&edition=prelim), is paid for such water as is assignable to those lands leased in excess of such landholding of one hundred and sixty acres: Provided, That the interest rate used in computing full cost under this subsection shall be the same as provided in [section 390ee(a)(3) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section390ee/a/3&num=0&edition=
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 390cc
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 390cc. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 120
TITLE 43—PUBLIC LANDS
§ 390cc
standing
marketable
public
obligations
which are neither due nor callable for re-
demption for fifteen years from the date of
issuance; and
(ii) the weighted average yield on all inter-
est-bearing, marketable issues sold by the
Treasury during the fiscal year preceding
the fiscal year in which the expenditures are
made.
(4) The term ‘‘individual’’ means any natural
person, including his or her spouse, and includ-
ing other dependents thereof within the mean-
ing of the Internal Revenue Code of 1986 (26
U.S.C. 152).
(5) The term ‘‘irrigation water’’ means water
made available for agricultural purposes from
the operation of reclamation project facilities
pursuant to a contract with the Secretary.
(6) The term ‘‘landholding’’ means total irri-
gable acreage of one or more tracts of land sit-
uated in one or more districts owned or oper-
ated under a lease which is served with irriga-
tion water pursuant to a contract with the
Secretary. In determining the extent of a
landholding the Secretary shall add to any
landholding held directly by a qualified or
limited recipient that portion of any land-
holding held indirectly by such qualified or
limited recipient which benefits that qualified
or limited recipient in proportion to that land-
holding.
(7) The term ‘‘limited recipient’’ means any
legal entity established under State or Federal
law benefiting more than twenty-five natural
persons.
(8) The term ‘‘project’’ means any reclama-
tion or irrigation project, including incidental
features thereof, authorized by Federal rec-
lamation law, or constructed by the United
States pursuant to such law, or in connection
with which there is a repayment or water serv-
ice contract executed by the United States
pur
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 390cc
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 390cc. This identifies an authority to review, not proof of applicability.