Browse Arkansas Code titles and sections
30 U.S.C. § 1244 — Remining incentives
Federal law — U.S. Code and appendices · legal_authorities
**(a) In general** Notwithstanding any other provision of this chapter, the Secretary may, after opportunity for public comment, promulgate regulations that describe conditions under which amounts in the fund may be used to provide incentives to promote remining of eligible land under [section 1234 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1234&num=0&edition=prelim) in a manner that leverages the use of amounts from the fund to achieve more reclamation with respect to the eligible land than would be achieved without the incentives.
**(b) Requirements** Any regulations promulgated under subsection (a) shall specify that the incentives shall apply only if the Secretary determines, with the concurrence of the State regulatory authority referred to in subchapter V, that, without the incentives, the eligible land would not be likely to be remined and reclaimed.
**(c) Incentives**
(1) **In general** — Incentives that may be considered for inclusion in the regulations promulgated under subsection (a) include, but are not limited to—
(A) a rebate or waiver of the reclamation fees required under [section 1232(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1232/a&num=0&edition=prelim); and
(B) the use of amounts in the fund to provide financial assurance for remining operations in lieu of all or a portion of the performance bonds required under [section 1259 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1259&num=0&edition=prelim).
(2) **Limitations**
(A) *Use* — A rebate or waiver under paragraph (1)(A) shall be used only for operations that—
(i) remove or reprocess abandoned coal mine waste; or
(ii) conduct remining a
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1244
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: ff3155c8c1276583cbb57eb10a5d7b893d85501c5677f6576523ee4ccc74b0a5. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_d12280c6335a20ea5b11ddf0
Source file: Laws/federal/codes/united-states-code/title-30/section-1244-remining-incentives--e030aba650.md
Pages: Not recorded – Not recorded
Passage SHA-256: 4fad2759f977d494f4c4a1b81e5db5cca8e10bf9800ed831d401a4cff6740eac
Source location: Title 30, Chapter 25, § 1244; chapter-025-surface-mining-control-and-reclamation.md
Stored source content
**(a) In general** Notwithstanding any other provision of this chapter, the Secretary may, after opportunity for public comment, promulgate regulations that describe conditions under which amounts in the fund may be used to provide incentives to promote remining of eligible land under [section 1234 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1234&num=0&edition=prelim) in a manner that leverages the use of amounts from the fund to achieve more reclamation with respect to the eligible land than would be achieved without the incentives.
**(b) Requirements** Any regulations promulgated under subsection (a) shall specify that the incentives shall apply only if the Secretary determines, with the concurrence of the State regulatory authority referred to in subchapter V, that, without the incentives, the eligible land would not be likely to be remined and reclaimed.
**(c) Incentives**
(1) **In general** — Incentives that may be considered for inclusion in the regulations promulgated under subsection (a) include, but are not limited to—
(A) a rebate or waiver of the reclamation fees required under [section 1232(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1232/a&num=0&edition=prelim); and
(B) the use of amounts in the fund to provide financial assurance for remining operations in lieu of all or a portion of the performance bonds required under [section 1259 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1259&num=0&edition=prelim).
(2) **Limitations**
(A) *Use* — A rebate or waiver under paragraph (1)(A) shall be used only for operations that—
(i) remove or reprocess abandoned coal mine waste; or
(ii) conduct remining activities that meet the priorities specified in paragraph (1) or (2) of [section 1233(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1233/a&num=0&edition=prelim).
(B) *Amount* — The amount of a rebate or waiver provided as an incentive under paragraph (1)(A) to remine or reclaim eligible land shall not exceed the estimated cost of reclaiming the eligible land under this section.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Filing with regulatory authority; scope; number and amount** After a surface coal mining and reclamation permit application has been approved but before such a permit is issued, the applicant shall file with the regulatory authority, on a form prescribed and furnished by the regulatory authority, a bond for performance payable, as appropriate, to the United States or to the State, and conditional upon faithful performance of all the requirements of this chapter and the permit. The bond shall cover that area of land within the permit area upon which the operator will initiate and conduct surface coal mining and reclamation operations within the initial term of the permit. As succeeding increments of surface coal mining and reclamation operations are to be initiated and conducted within the permit area, the permittee shall file with the regulatory authority an additional bond or bonds to cover such increments in accordance with this section. The amount of the bond required for each bonded area shall depend upon the reclamation requirements of the approved permit; shall reflect the probable difficulty of reclamation giving consideration to such factors as topography, geology of the site, hydrology, and revegetation potential, and shall be determined by the regulatory authority. The amount of the bond shall be sufficient to assure the completion of the reclamation plan if the work had to be performed by the regulatory authority in the event of forfeiture and in no case shall the bond for the entire area under one permit be less than $10,000.
**(b) Liability period; execution** Liability under the bond shall be for the duration of the surface coal mining and reclamation operation and for a period coincident with operator’s responsibility for revegetation requirements
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1259
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Lands and water eligible for reclamation or drainage abatement expenditures under this subchapter are those which were mined for coal or which were affected by such mining, wastebanks, coal processing, or other coal mining processes, except as provided for under [section 1240a of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1240a&num=0&edition=prelim), and abandoned or left in an inadequate reclamation status prior to August 3, 1977, and for which there is no continuing reclamation responsibility under State or other Federal laws. For other provisions relating to lands and waters eligible for such expenditures, see [section 1232(g)(4) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1232/g/4&num=0&edition=prelim), [section 1233(b)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1233/b/1&num=0&edition=prelim), and [section 1239 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1239&num=0&edition=prelim). Surface coal mining operations on lands eligible for remining shall not affect the eligibility of such lands for reclamation and restoration under this subchapter after the release of the bond or deposit for any such operation as provided under [section 1269 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1269&num=0&edition=prelim). In the event the bond or deposit for a surface coal mining operation on lands eligible for remining is forfeited, funds available under this subchapter may be used if the amount of such bond or deposit is not sufficient to provide for adequate reclamation or abatement, except that if conditions warrant the Secretary shall immediate
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1234
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
The Congress finds and declares that—
**(a)** extraction of coal and other minerals from the earth can be accomplished by various methods of mining, including surface mining;
**(b)** coal mining operations presently contribute significantly to the Nation’s energy requirements; surface coal mining constitutes one method of extraction of the resource; the overwhelming percentage of the Nation’s coal reserves can only be extracted by underground mining methods, and it is, therefore, essential to the national interest to insure the existence of an expanding and economically healthy underground coal mining industry;
**(c)** many surface mining operations result in disturbances of surface areas that burden and adversely affect commerce and the public welfare by destroying or diminishing the utility of land for commercial, industrial, residential, recreational, agricultural, and forestry purposes, by causing erosion and landslides, by contributing to floods, by polluting the water, by destroying fish and wildlife habitats, by impairing natural beauty, by damaging the property of citizens, by creating hazards dangerous to life and property by degrading the quality of life in local communities, and by counteracting governmental programs and efforts to conserve soil, water, and other natural resources;
**(d)** the expansion of coal mining to meet the Nation’s energy needs makes even more urgent the establishment of appropriate standards to minimize damage to the environment and to productivity of the soil and to protect the health and safety of the public.11 So in original. The period probably should be a semicolon.
**(e)** surface mining and reclamation technology are now developed so that effective and reasonable regulation of surface coal mining operations by the States a
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1201
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 262
TITLE 30—MINERAL LANDS AND MINING
§ 1243
(c) Request for action to restrain interference
with regard to this subchapter
The Secretary or the State pursuant to an ap-
proved State program, may request the Attor-
ney General, who is hereby authorized to ini-
tiate, in addition to any other remedies provided
for in this subchapter, in any court of competent
jurisdiction, an action in equity for an injunc-
tion to restrain any interference with the exer-
cise of the right to enter or to conduct any work
provided in this subchapter.
(d) Construct and operate plants for control and
treatment of water pollution resulting from
mine drainage
The Secretary or the State pursuant to an ap-
proved State program, shall have the power and
authority to construct and operate a plant or
plants for the control and treatment of water
pollution resulting from mine drainage. The ex-
tent of this control and treatment may be de-
pendent upon the ultimate use of the water: Pro-
vided, That the above provisions of this para-
graph shall not be deemed in any way to repeal
or supersede any portion of the Federal Water
Pollution Control Act (33 U.S.C.A. 1151, et seq.
as amended) [33 U.S.C. 1251 et seq.] and no con-
trol or treatment under this subsection shall in
any way be less than that required under the
Federal Water Pollution Control Act. The con-
struction of a plant or plants may include major
interceptors and other facilities appurtenant to
the plant.
(e) Transfer funds
The Secretary may transfer funds to other ap-
propriate Federal agencies, in order to carry out
the reclamation activities authorized by this
subchapter.
(Pub. L. 95–87, title IV, § 413, formerly § 412, Aug.
3, 1977, 91 Stat. 466, renumbered § 413, Pub. L.
101–508, title VI, § 6010(1), Nov
Source: Supplied 2024 U.S. Code historical extraction · 30 U.S.C. § 1244
Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.