Browse Arkansas Code titles and sections
43 U.S.C. § 390g–9 — Aquifer recharge flexibility
Federal law — U.S. Code and appendices · legal_authorities
**(a) Short title** This section may be cited as the “Aquifer Recharge Flexibility Act”.
**(b) Definitions** In this section:
(1) **Bureau** — The term “Bureau” means the Bureau of Reclamation.
(2) **Commissioner** — The term “Commissioner” means the Commissioner of Reclamation.
(3) **Eligible land** — The term “eligible land”, with respect to a Reclamation project, means land that—
(A) is authorized to receive water under State law; and
(B) shares an aquifer with land located in the service area of the Reclamation project.
(4) **Net water storage benefit** — The term “net water storage benefit” means an increase in the volume of water that is—
(A) stored in 1 or more aquifers; and
(B)
(i) available for use within the authorized service area of a Reclamation project; or
(ii) stored on a long-term basis to avoid or reduce groundwater overdraft.
(5) **Reclamation facility** — The term “Reclamation facility” means each of the infrastructure assets that are owned by the Bureau at a Reclamation project.
(6) **Reclamation project** — The term “Reclamation project” means any reclamation or irrigation project, including incidental features thereof, authorized by Federal reclamation law or the Act of August 11, 1939 (commonly known as the “Water Conservation and Utilization Act”) (53 Stat. 1418, chapter 717; [16 U.S.C. 590y](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section590y&num=0&edition=prelim) et seq.), or constructed by the United States pursuant to such law, or in connection with which there is a repayment or water service contract executed by the United States pursuant to such law, or any project constructed by the Secretary through the Bureau for the reclamation of land.
**(c) Flexibility to allow greater aquifer
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 390g–9
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 9855ebaaaff5b7a3c6ead7aacca0d763875125986cf762f54c540d8ae541a8ae. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Record provenance
Stable record: federal_law:legal_authorities:record_usc_d0f4a3c5eee19950674f02f0
Source file: Laws/federal/codes/united-states-code/title-43/section-390g9-aquifer-recharge-flexibility--a57420b512.md
Pages: Not recorded – Not recorded
Passage SHA-256: 3d07b962d55f8d359852c8fe118b88536db4d9d5baf396ff5a0eebb8288a7e52
Source location: Title 43, Chapter 12, § 390g–9; chapter-012-reclamation-and-irrigation-of-lands-by-federal-government.md
Stored source content
**(a) Short title** This section may be cited as the “Aquifer Recharge Flexibility Act”.
**(b) Definitions** In this section:
(1) **Bureau** — The term “Bureau” means the Bureau of Reclamation.
(2) **Commissioner** — The term “Commissioner” means the Commissioner of Reclamation.
(3) **Eligible land** — The term “eligible land”, with respect to a Reclamation project, means land that—
(A) is authorized to receive water under State law; and
(B) shares an aquifer with land located in the service area of the Reclamation project.
(4) **Net water storage benefit** — The term “net water storage benefit” means an increase in the volume of water that is—
(A) stored in 1 or more aquifers; and
(B)
(i) available for use within the authorized service area of a Reclamation project; or
(ii) stored on a long-term basis to avoid or reduce groundwater overdraft.
(5) **Reclamation facility** — The term “Reclamation facility” means each of the infrastructure assets that are owned by the Bureau at a Reclamation project.
(6) **Reclamation project** — The term “Reclamation project” means any reclamation or irrigation project, including incidental features thereof, authorized by Federal reclamation law or the Act of August 11, 1939 (commonly known as the “Water Conservation and Utilization Act”) (53 Stat. 1418, chapter 717; [16 U.S.C. 590y](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section590y&num=0&edition=prelim) et seq.), or constructed by the United States pursuant to such law, or in connection with which there is a repayment or water service contract executed by the United States pursuant to such law, or any project constructed by the Secretary through the Bureau for the reclamation of land.
**(c) Flexibility to allow greater aquifer recharge in Western States**
(1) **Use of Reclamation facilities**
(A) *In general* — The Commissioner may allow the use of excess capacity in Reclamation facilities for aquifer recharge of non-Reclamation project water, subject to applicable rates, charges, and public participation requirements, on the condition that—
(i) the use—
(I) shall not be implemented in a manner that is detrimental to—
(aa) any power service or water contract for the Reclamation project; or
(bb) any obligations for fish, wildlife, or water quality protection applicable to the Reclamation project;
(II) shall be consistent with water quality guidelines for the Reclamation project;
(III) shall comply with all applicable—
(aa) Federal laws; and
(bb) policies of the Bureau; and
(IV) shall comply with all applicable State laws and policies; and
(ii) the non-Federal party to an existing contract for water or water capacity in a Reclamation facility consents to the use of the Reclamation facility under this subsection.
(B) *Effect on existing contracts* — Nothing in this subsection affects a contract—
(i) in effect on December 27, 2020; and
(ii) under which the use of excess capacity in a Bureau conveyance facility for carriage of non-Reclamation project water for aquifer recharge is allowed.
(2) **Aquifer recharge on eligible land**
(A) *In general* — Subject to subparagraphs (C) and (D), the Secretary may contract with a holder of a water service or repayment contract for a Reclamation project to allow the contractor, in accordance with applicable State laws and policies—
(i) to directly use water available under the contract for aquifer recharge on eligible land; or
(ii) to enter into an agreement with an individual or entity to transfer water available under the contract for aquifer recharge on eligible land.
(B) *Authorized project use* — The use of a Reclamation facility for aquifer recharge under subparagraph (A) shall be considered an authorized use for the Reclamation project if requested by a holder of a water service or repayment contract for the Reclamation facility.
(C) *Modifications to contracts* — The Secretary may contract with a holder of a water service or repayment contract for a Reclamation project under subparagraph (A) if the Secretary determines that a new contract or contract amendment described in that subparagraph is—
(i) necessary to allow for the use of water available under the contract for aquifer recharge under this subsection;
(ii) in the best interest of the Reclamation project and the United States; and
(iii) approved by the contractor that is responsible for repaying the cost of construction, operations, and maintenance of the facility that delivers the water under the contract.
(D) *Requirements* — The use of Reclamation facilities for the use or transfer of water for aquifer recharge under this subsection shall be subject to the requirements that—
(i) the use or transfer shall not be implemented in a manner that materially impacts any power service or water contract for the Reclamation project; and
(ii) before the use or transfer, the Secretary shall determine that the use or transfer—
(I) results in a net water storage benefit for the Reclamation project; or
(II) contributes to the recharge of an aquifer on eligible land; and
(iii) the use or transfer complies with all applicable—
(I) Federal laws and policies; and
(II) interstate water compacts.
(3) **Conveyance for aquifer recharge purposes** — The holder of a right-of-way, easement, permit, or other authorization to transport water across public land administered by the Bureau of Land Management may transport water for aquifer recharge purposes without requiring additional authorization from the Secretary where the use does not expand or modify the operation of the right-of-way, easement, permit, or other authorization across public land.
(4) **Effect** — Nothing in this section creates, impairs, alters, or supersedes a Federal or State water right.
(5) **Exemption** — This section shall not apply to the State of California.
(6) **Advisory group** — The Secretary may participate in any State-led collaborative, multi-stakeholder advisory group created in any watershed the purpose of which is to monitor, review, and assess aquifer recharge activities.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
For the purpose of stabilizing water supply and thereby rehabilitating farmers on the land and providing opportunities for permanent settlement of farm families, the Secretary of the Interior (hereinafter referred to as “the Secretary”) is authorized to investigate and, upon compliance with the provisions of this subchapter, to construct water conservation and utilization projects in the Great Plains and arid and semiarid areas of the United States, and to operate and maintain each such project in accordance with the provisions of this subchapter; Provided, That the United States shall retain title to the dams, reservoirs, irrigation, and other project works until Congress otherwise provides: And provided further, That expenditures from appropriations made directly pursuant to the authority contained in [section 590z–10(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section590z–10/1&num=0&edition=prelim) to meet reimbursable construction costs allocated to irrigation as defined in [section 590z–2(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section590z–2/b&num=0&edition=prelim) shall not exceed $2,000,000 for dams and reservoirs in any one project, and that expenditures from appropriations made directly pursuant to the authority contained in [section 590z–10(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section590z–10/1&num=0&edition=prelim) to meet costs allocated to flood control by the Secretary after consultation with the Chief of Engineers, Department of the Army, shall not exceed $500,000 on any one project.
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 590y
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) General authority**
(1) **In general** — The Secretary may carry out a project to restore and protect an aquatic ecosystem or estuary if the Secretary determines that the project—
(A)
(i) will improve the quality of the environment and is in the public interest; or
(ii) will improve the elements and features of an estuary (as defined in [section 2902 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2902&num=0&edition=prelim)); and
(B) is cost-effective.
(2) **Dam removal** — A project under this section may include removal of a dam.
(3) **Anadromous fish habitat and passage**
(A) *Measures* — A project under this section may include measures to improve habitat or passage for anadromous fish, including—
(i) installing fish bypass structures on small water diversions;
(ii) modifying tide gates; and
(iii) restoring or reconnecting floodplains and wetlands that are important for anadromous fish habitat or passage.
(B) *Benefits* — A project that includes measures under this paragraph shall be formulated to maximize benefits for the anadromous fish species benefitted by the project.
(4) **Drought resilience** — A project under this section may include measures that enhance drought resilience through the restoration of wetlands or the removal of invasive species.
**(b) Cost sharing**
(1) **In general** — Non-Federal interests shall provide 35 percent of the cost of construction of any project carried out under this section, including provision of all lands, easements, rights-of-way, and necessary relocations.
(2) **Form** — Before October 1, 2003, the Federal share of the cost of a project under this section may be provided in the form of reimbursements of project costs.
(3) **Anadrom
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2330c
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 1122
TITLE 16—CONSERVATION
§§ 590r to 590x–4
Sec.
590z–9.
Powers and duties of Secretaries of the Inte-
rior and Agriculture; rules and regulations.
590z–10.
Authorization of appropriations.
590z–11.
Delegation of powers and duties by Secretary
of the Interior.
SUBCHAPTER I—FACILITIES FOR WATER
STORAGE AND UTILIZATION
§§ 590r to 590x–4. Repealed. Pub. L. 87–128, title
III, § 341(a), Aug. 8, 1961, 75 Stat. 318
Section 590r, acts Aug. 28, 1937, ch. 870, § 1, 50 Stat.
869; Aug. 17, 1954, ch. 751, § 1(1), (2), 68 Stat. 734; July 12,
1960, Pub. L. 86–624, § 9, 74 Stat. 412, related to Congres-
sional declaration of policy.
Section 590s, acts Aug. 28, 1937, ch. 870, § 2, 50 Stat.
869; Aug. 17, 1954, ch. 751, § 1(3), 68 Stat. 735, related to
powers and duties of Secretary of Agriculture.
Section 590t, act Aug. 28, 1937, ch. 870, § 3, 50 Stat. 869,
related to location of projects.
Section 590u, act Aug. 28, 1937, ch. 870, § 4, 50 Stat. 870,
related to State aid and certain requirements.
Section 590v, act Aug. 28, 1937, ch. 870, § 5, 50 Stat. 870,
related to use of employees and agencies within De-
partment of Agriculture.
Section 590w, act Aug. 28, 1937, ch. 870, § 6, 50 Stat. 870,
related to cooperation of governmental agencies, ex-
penditures and rules and regulations.
Section 590x, act Aug. 28, 1937, ch. 870, § 7, 50 Stat. 870,
authorized appropriations.
Section 590x–1, act Aug. 28, 1937, ch. 870, § 8, as added
Aug. 17, 1954, ch. 751, § 1(4), 68 Stat. 735, prescribed limi-
tations on aid.
Section 590x–2, act Aug. 28, 1937, ch. 870, § 9, as added
Aug. 17, 1954, ch. 751, § 1(4), 68 Stat. 735, authorized loans
for farm land improvement.
Section 590x–3, act Aug. 28, 1937, ch. 870, § 10(a)–(e), as
added Aug. 17, 1954, ch. 751, § 1(4), 68 Stat.
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 590y
Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 590y. This identifies an authority to review, not proof of applicability.