48 U.S.C. § 2232 — Critical Projects
Federal law — U.S. Code and appendices · legal_authorities
**(a) Identification of projects**
(1) **Project submission** — Any Project Sponsor may submit, so long as the Oversight Board is in operation, any existing, ongoing, or proposed project to the Revitalization Coordinator. The Revitalization Coordinator shall require such submission to include—
(A) the impact the project will have on an emergency;
(B) the availability of immediate private capital or other funds, including loan guarantees, loans, or grants to implement, operate, or maintain the project;
(C) the cost of the project and amount of Puerto Rico government funds, if any, necessary to complete and maintain the project;
(D) the environmental and economic benefits provided by the project, including the number of jobs to be created that will be held by residents of Puerto Rico and the expected economic impact, including the impact on ratepayers, if applicable;
(E) the status of the project if it is existing or ongoing; and
(F) in addition to the requirements found in subparagraphs (A) through (E), the Revitalization Coordinator may require such submission to include any or all of the following criteria that assess how the project will—
(i) reduce reliance on oil for electric generation in Puerto Rico;
(ii) improve performance of energy infrastructure and overall energy efficiency;
(iii) expedite the diversification and conversion of fuel sources for electric generation from oil to natural gas and renewables in Puerto Rico as defined under applicable Puerto Rico laws;
(iv) promote the development and utilization of energy sources found on Puerto Rico;
(v) contribute to transitioning to privatized generation capacities in Puerto Rico;
(vi) support the Energy Commission of Puerto Rico in achievement of its goal of reduc
Source: Supplied U.S. Code snapshot — release unconfirmed · 48 U.S.C. § 2232
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 81b469ea992d801ab32fcda53a23f76b22ab1ab09e2bc91cc1c82d1b282c7303. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_c0df7baf7a8c99b2b0437ca9
Source file: Laws/federal/codes/united-states-code/title-48/section-2232-critical-projects--b9f9bd5442.md
Pages: Not recorded – Not recorded
Passage SHA-256: 261200ec8d532ae4e3ad8886ff351072a0a3f10d2f58290a494c6b5911c146d9
Source location: Title 48, Chapter 20, § 2232; chapter-020-puerto-rico-oversight-management-and-economic-stability.md
Stored source content
**(a) Identification of projects**
(1) **Project submission** — Any Project Sponsor may submit, so long as the Oversight Board is in operation, any existing, ongoing, or proposed project to the Revitalization Coordinator. The Revitalization Coordinator shall require such submission to include—
(A) the impact the project will have on an emergency;
(B) the availability of immediate private capital or other funds, including loan guarantees, loans, or grants to implement, operate, or maintain the project;
(C) the cost of the project and amount of Puerto Rico government funds, if any, necessary to complete and maintain the project;
(D) the environmental and economic benefits provided by the project, including the number of jobs to be created that will be held by residents of Puerto Rico and the expected economic impact, including the impact on ratepayers, if applicable;
(E) the status of the project if it is existing or ongoing; and
(F) in addition to the requirements found in subparagraphs (A) through (E), the Revitalization Coordinator may require such submission to include any or all of the following criteria that assess how the project will—
(i) reduce reliance on oil for electric generation in Puerto Rico;
(ii) improve performance of energy infrastructure and overall energy efficiency;
(iii) expedite the diversification and conversion of fuel sources for electric generation from oil to natural gas and renewables in Puerto Rico as defined under applicable Puerto Rico laws;
(iv) promote the development and utilization of energy sources found on Puerto Rico;
(v) contribute to transitioning to privatized generation capacities in Puerto Rico;
(vi) support the Energy Commission of Puerto Rico in achievement of its goal of reducing energy costs and ensuring affordable energy rates for consumers and business; or
(vii) achieve in whole or in part the recommendations, if feasible, of the study in [section 505(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title48-section505/d&num=0&edition=prelim) 11 See References in Text note below. to the extent such study is completed and not inconsistent with studies or plans otherwise required under Puerto Rico laws.
(2) **Identification of relevant Puerto Rico Agencies** — Within 20 days of receiving a project submission under paragraph (1), the Revitalization Coordinator shall, in consultation with the Governor, identify all Puerto Rico Agencies that will have a role in the permitting, approval, authorizing, or other activity related to the development of such project submission.
(3) **Expedited Permitting Process**
(A) *Submission of Expedited Permitting Process* — Not later than 20 days after receiving a project submission, each Puerto Rico Agency identified in paragraph (1) shall submit to the Revitalization Coordinator the Agency’s Expedited Permitting Process.
(B) *Failure to provide Expedited Permitting Process* — If a Puerto Rico Agency fails to provide an Expedited Permitting Process within 20 days of receiving a project submission, the Revitalization Coordinator shall consult with the Governor to develop within 20 days an Expedited Permitting Process for the Agency.
(C) *Implementation and prioritization* — The Revitalization Coordinator shall require Puerto Rico Agencies to implement the Expedited Permitting Process for Critical Projects. Critical Projects shall be prioritized to the maximum extent possible in each Puerto Rico Agency regardless of any agreements transferring or delegating permitting authority to any other Territorial Instrumentality or municipality.
**(b) Critical Project Report**
(1) **In general** — For each submitted project, the Revitalization Coordinator in consultation with the Governor and relevant Puerto Rico Agencies identified in subsection (a)(2) shall develop a Critical Project Report within 60 days of the project submission, which shall include:
(A) An assessment of how well the project meets the criteria in subsection (a)(1).
(B) A recommendation by the Governor whether the project should be considered a Critical Project. If the Governor fails to provide a recommendation during the development of the Critical Project Report, the failure shall constitute a concurrence with the Revitalization Coordinator’s recommendation in subparagraph (E).
(C) In the case of a project that may affect the implementation of Land-Use Plans, as defined by Puerto Rico Act 550–2004, a determination by the Planning Board will be required within the 60-day timeframe. If the Planning Board determines such project will be inconsistent with relevant Land-Use Plans, then the project will be deemed ineligible for Critical Project designation.
(D) In the case of an Energy Project that will connect with the Puerto Rico Electric Power Authority’s transmission or distribution facilities, a recommendation by the Energy Commission of Puerto Rico, if the Energy Commission determines such Energy Project will affect an approved Integrated Resource Plan, as defined under Puerto Rico Act 54–2014. If the Energy Commission determines the Energy Project will adversely affect an approved Integrated Resource Plan, then the Energy Commission shall provide the reasons for such determination and the Energy Project shall be ineligible for Critical Project designation, provided that such determination must be made during the 60-day timeframe for the development of the Critical Project Report.
(E) A recommendation by the Revitalization Coordinator whether the project should be considered a Critical Project.
(2) **Public involvement** — Immediately following the completion of the Critical Project Report, the Revitalization Coordinator shall make such Critical Project Report public and allow a period of 30 days for the submission of comments by residents of Puerto Rico specifically on matters relating to the designation of a project as a Critical Project. The Revitalization Coordinator shall respond to the comments within 30 days of closing the coming 22 So in original. period and make the responses publicly available.
(3) **Submission to Oversight Board** — Not later than 5 days after the Revitalization Coordinator has responded to the comments under paragraph (2), the Revitalization Coordinator shall submit the Critical Project Report to the Oversight Board.
**(c) Action by the Oversight Board** Not later than 30 days after receiving the Critical Project Report, the Oversight Board, by majority vote, shall approve or disapprove the project as a Critical Project, if the Oversight Board—
(1) approves the project, the project shall be deemed a Critical Project; and
(2) disapproves the project, the Oversight Board shall submit to the Revitalization Coordinator in writing the reasons for disapproval.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Definitions** In this section:
(1) **Comprehensive energy plan** — The term “comprehensive energy plan” means a comprehensive energy plan prepared and updated under subsections (c) and (e) of [section 1492 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title48-section1492&num=0&edition=prelim).
(2) **Energy action plan** — The term “energy action plan” means the plan required by subsection (d).
(3) **Freely Associated States** — The term “Freely Associated States” means the Federated States of Micronesia, the Republic of the Marshall Islands, and the Republic of Palau.
(4) **Insular areas** — The term “insular areas” means American Samoa, the Commonwealth of the Northern Mariana Islands, Puerto Rico, Guam, and the Virgin Islands.
(5) **Secretary** — The term “Secretary” means the Secretary of the Interior, except that, with respect to Puerto Rico, the term means, the Secretary of Energy.
(6) **Team** — The term “team” means the team established by the Secretary under subsection (b).
**(b) Establishment** Not later than 180 days after December 16, 2014 (except in the case of Puerto Rico, in which case not later than 270 days after June 30, 2016), the Secretary shall, within the Empowering Insular Communities activity (except in the case of Puerto Rico), establish a team of technical, policy, and financial experts—
(1) to develop an energy action plan addressing the energy needs of each of the insular areas and Freely Associated States; and
(2) to assist each of the insular areas and Freely Associated States in implementing such plan.
**(c) Participation of regional utility organizations** In establishing the team, the Secretary shall consider including regional utility organizations.
**(d) Energy action plan** In accordance w
Source: Supplied U.S. Code snapshot — release unconfirmed · 48 U.S.C. § 1492a
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 388
TITLE 48—TERRITORIES AND INSULAR POSSESSIONS
§ 2232
ernment Issuer, other territorial instrumental-
ities of the territorial government Issuer, and
any creditors of such entities, and should not be
subject to any collateral attack or other chal-
lenge by any such entities in any court or other
forum. Other than as provided herein, the fore-
going shall not prejudice the rights and claims
of any party that insured the Bonds, including
the right to assert claims under the Bonds as
modified following any payment under the in-
surance policy, and no claim or right that may
be asserted by any party in a capacity other
than holder of a Bond affected by the Qualifying
Modification shall be satisfied, released, dis-
charged, or enjoined by this provision.
(n) Judicial review
(1) The district court for the territory or, for
any territory that does not have a district
court, the United States District Court for the
District of Hawaii shall have original and exclu-
sive jurisdiction over civil actions arising under
this section.
(2) Notwithstanding section 2126(e) of this
title, there shall be a cause of action to chal-
lenge unlawful application of this section.
(3) The district court shall nullify a Modifica-
tion and any effects on the rights of the holders
of Bonds resulting from such Modification if and
only if the district court determines that such
Modification is manifestly inconsistent with
this section.
(Pub. L. 114–187, title VI, § 601, June 30, 2016, 130
Stat. 603.)
§ 2232. Applicable law
In any judicial proceeding regarding this sub-
chapter, Federal, State, or territorial laws of
the United States, as applicable, shall govern
and be applied without regard or reference to
any law of any international or foreign jurisdic-
tion.
(P
Source: Supplied 2024 U.S. Code historical extraction · 48 U.S.C. § 2232