16 U.S.C. § 839a — Definitions

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 839a — Definitions

As used in this chapter, the term— (1) “Acquire” and “acquisition” shall not be construed as authorizing the Administrator to construct, or have ownership of, under this chapter or any other law, any electric generating facility. (2) “Administrator” means the Administrator of the Bonneville Power Administration. (3) “Conservation” means any reduction in electric power consumption as a result of increases in the efficiency of energy use, production, or distribution. (4) (A) “Cost-effective”, when applied to any measure or resource referred to in this chapter, means that such measure or resource must be forecast— (i) to be reliable and available within the time it is needed, and (ii) to meet or reduce the electric power demand, as determined by the Council or the Administrator, as appropriate, of the consumers of the customers at an estimated incremental system cost no greater than that of the least-cost similarly reliable and available alternative measure or resource, or any combination thereof. (B) For purposes of this paragraph, the term “system cost” means an estimate of all direct costs of a measure or resource over its effective life, including, if applicable, the cost of distribution and transmission to the consumer and, among other factors, waste disposal costs, end-of-cycle costs, and fuel costs (including projected increases), and such quantifiable environmental costs and benefits as the Administrator determines, on the basis of a methodology developed by the Council as part of the plan, or in the absence of the plan by the Administrator, are directly attributable to such measure or resource. (C) In determining the amount of power that a conservation measure or other resource may be expected to save or to produce, the Council or the Admini

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 839a

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 6a036732f8bbe53cbe53c9c8c0e78fdc23bcc235e3448f408feec806332e6a5c. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_b2ddd108a6d1819e88e1e8f9
Source file: Laws/federal/codes/united-states-code/title-16/section-839a-definitions--b683c44218.md
Pages: Not recorded – Not recorded
Passage SHA-256: 710d40a1e5ded17c01e93dcab58490535cd4d97e892b9e6c24e67c7f4173b8ef

Source location: Title 16, Chapter 12H, § 839a; chapter-12h-pacific-northwest-electric-power-planning-and-conservation.md

Stored source content

As used in this chapter, the term— (1) “Acquire” and “acquisition” shall not be construed as authorizing the Administrator to construct, or have ownership of, under this chapter or any other law, any electric generating facility. (2) “Administrator” means the Administrator of the Bonneville Power Administration. (3) “Conservation” means any reduction in electric power consumption as a result of increases in the efficiency of energy use, production, or distribution. (4) (A) “Cost-effective”, when applied to any measure or resource referred to in this chapter, means that such measure or resource must be forecast— (i) to be reliable and available within the time it is needed, and (ii) to meet or reduce the electric power demand, as determined by the Council or the Administrator, as appropriate, of the consumers of the customers at an estimated incremental system cost no greater than that of the least-cost similarly reliable and available alternative measure or resource, or any combination thereof. (B) For purposes of this paragraph, the term “system cost” means an estimate of all direct costs of a measure or resource over its effective life, including, if applicable, the cost of distribution and transmission to the consumer and, among other factors, waste disposal costs, end-of-cycle costs, and fuel costs (including projected increases), and such quantifiable environmental costs and benefits as the Administrator determines, on the basis of a methodology developed by the Council as part of the plan, or in the absence of the plan by the Administrator, are directly attributable to such measure or resource. (C) In determining the amount of power that a conservation measure or other resource may be expected to save or to produce, the Council or the Administrator, as the case may be, shall take into account projected realization factors and plant factors, including appropriate historical experience with similar measures or resources. (D) For purposes of this paragraph, the “estimated incremental system cost” of any conservation measure or resource shall not be treated as greater than that of any nonconservation measure or resource unless the incremental system cost of such conservation measure or resource is in excess of 110 per centum of the incremental system cost of the nonconservation measure or resource. (5) “Consumer” means any end user of electric power. (6) “Council” means, unless otherwise specifically provided, the members appointed to the Pacific Northwest Electric Power and Conservation Planning Council established pursuant to [section 839b of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section839b&num=0&edition=prelim). (7) “Customer” means anyone who contracts for the purchase of power from the Administrator pursuant to this chapter. (8) “Direct service industrial customer” means an industrial customer that contracts for the purchase of power from the Administrator for direct consumption. (9) “Electric power” means electric peaking capacity, or electric energy, or both. (10) “Federal base system resources” means— (A) the Federal Columbia River Power System hydroelectric projects; (B) resources acquired by the Administrator under long-term contracts in force on December 5, 1980; and (C) resources acquired by the Administrator in an amount necessary to replace reductions in capability of the resources referred to in subparagraphs (A) and (B) of this paragraph. (11) “Indian tribe” means any Indian tribe or band which is located in whole or in part in the region and which has a governing body which is recognized by the Secretary of the Interior. (12) “Major resource” means any resource that— (A) has a planned capability greater than fifty average megawatts, and (B) if acquired by the Administrator, is acquired for a period of more than five years. Such term does not include any resource acquired pursuant to [section 838i(b)(6) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section838i/b/6&num=0&edition=prelim). (13) “New large single load” means any load associated with a new facility, an existing facility, or an expansion of an existing facility— (A) which is not contracted for, or committed to, as determined by the Administrator, by a public body, cooperative, investor-owned utility, or Federal agency customer prior to September 1, 1979, and (B) which will result in an increase in power requirements of such customer of ten average megawatts or more in any consecutive twelve-month period. (14) “Pacific Northwest”, “region”, or “regional” means— (A) the area consisting of the States of Oregon, Washington, and Idaho, the portion of the State of Montana west of the Continental Divide, and such portions of the States of Nevada, Utah, and Wyoming as are within the Columbia River drainage basin; and (B) any contiguous areas, not in excess of seventy-five air miles from the area referred to in subparagraph (A), which are a part of the service area of a rural electric cooperative customer served by the Administrator on December 5, 1980, which has a distribution system from which it serves both within and without such region. (15) “Plan” means the Regional Electric Power and Conservation plan (including any amendments thereto) adopted pursuant to this chapter and such plan shall apply to actions of the Administrator as specified in this chapter. (16) “Renewable resource” means a resource which utilizes solar, wind, hydro, geothermal, biomass, or similar sources of energy and which either is used for electric power generation or will reduce the electric power requirements of a consumer, including by direct application. (17) “Reserves” means the electric power needed to avert particular planning or operating shortages for the benefit of firm power customers of the Administrator and available to the Administrator (A) from resources or (B) from rights to interrupt, curtail, or otherwise withdraw, as provided by specific contract provisions, portions of the electric power supplied to customers. (18) “Residential use” or “residential load” means all usual residential, apartment, seasonal dwelling and farm electrical loads or uses, but only the first four hundred horsepower during any monthly billing period of farm irrigation and pumping for any farm. (19) “Resource” means— (A) electric power, including the actual or planned electric power capability of generating facilities, or (B) actual or planned load reduction resulting from direct application of a renewable energy resource by a consumer, or from a conservation measure. (20) “Secretary” means the Secretary of Energy.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 839b — Regional planning and participation

**(a) Pacific Northwest Electric Power and Conservation Planning Council; establishment and operation as regional agency** (1) The purposes of this section are to provide for the prompt establishment and effective operation of the Pacific Northwest Electric Power and Conservation Planning Council, to further the purposes of this chapter by the Council promptly preparing and adopting (A) a regional conservation and electric power plan and (B) a program to protect, mitigate, and enhance fish and wildlife, and to otherwise expeditiously and effectively carry out the Council’s responsibilities and functions under this chapter. (2) To achieve such purposes and facilitate cooperation among the States of Idaho, Montana, Oregon, and Washington, and with the Bonneville Power Administration, the consent of Congress is given for an agreement described in this paragraph and not in conflict with this chapter, pursuant to which— (A) there shall be established a regional agency known as the “Pacific Northwest Electric Power and Conservation Planning Council” which (i) shall have its offices in the Pacific Northwest, (ii) shall carry out its functions and responsibilities in accordance with the provisions of this chapter, (iii) shall continue in force and effect in accordance with the provisions of this chapter, and (iv) except as otherwise provided in this chapter, shall not be considered an agency or instrumentality of the United States for the purpose of any Federal law; and (B) two persons from each State may be appointed, subject to the applicable laws of each such State, to undertake the functions and duties of members of the Council. The State may fill any vacancy occurring prior to the expiration of the term of any member. The appointment of six initial members, subje

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 839b

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 824r — Protection of transmission contracts in the Pacific Northwest

**(a) Definition of electric utility or person** In this section, the term “electric utility or person” means an electric utility or person that— (1) as of August 8, 2005, holds firm transmission rights pursuant to contract or by reason of ownership of transmission facilities; and (2) is located— (A) in the Pacific Northwest, as that region is defined in [section 839a of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section839a&num=0&edition=prelim); or (B) in that portion of a State included in the geographic area proposed for a regional transmission organization in Commission Docket Number RT01–35 on the date on which that docket was opened. **(b) Protection of transmission contracts** Nothing in this chapter confers on the Commission the authority to require an electric utility or person to convert to tradable or financial rights— (1) firm transmission rights described in subsection (a); or (2) firm transmission rights obtained by exercising contract or tariff rights associated with the firm transmission rights described in subsection (a).

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824r

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 839a — Definitions

Page 1520 TITLE 16—CONSERVATION § 839a Editorial Notes REFERENCES IN TEXT This chapter, referred to in provision preceding par. (1) and in par. (5), was in the original ‘‘this Act’’, mean- ing Pub. L. 96–501, Dec. 5, 1980, 94 Stat. 2697, known as the Pacific Northwest Electric Power Planning and Conservation Act, which enacted this chapter, amended sections 837, 838i, and 838k of this title, and enacted provisions set out as notes under this section. For com- plete classification of this Act to the Code, see Short Title note set out below and Tables. Statutory Notes and Related Subsidiaries EFFECTIVE DATE Pub. L. 96–501, § 11, Dec. 5, 1980, 94 Stat. 2735, provided that: ‘‘This Act [enacting this chapter, amending sec- tions 837, 838i, and 838k of this title, and enacting provi- sions set out as notes under this section] shall be effec- tive on the date of enactment [Dec. 5, 1980], or October 1, 1980, whichever is later. For purposes of this Act, the term ‘date of the enactment of this Act’ means such date of enactment [Dec. 5, 1980] or October 1, 1980, whichever is later.’’ SHORT TITLE Pub. L. 96–501, § 1, Dec. 5, 1980, 94 Stat. 2697, provided in part that: ‘‘This Act [enacting this chapter, amend- ing sections 837, 838i, and 838k of this title, and enact- ing provisions set out as notes under this section] may be cited as the ‘Pacific Northwest Electric Power Plan- ning and Conservation Act’.’’ § 839a. Definitions As used in this chapter, the term— (1) ‘‘Acquire’’ and ‘‘acquisition’’ shall not be construed as authorizing the Administrator to construct, or have ownership of, under this chapter or any other law, any electric gener- ating facility. (2) ‘‘Administrator’’ means the Adminis- trator of the Bonneville Power Administra- tion. (3) ‘‘Cons

Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 839a

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.