Browse Arkansas Code titles and sections
42 U.S.C. § 1962d–5 — Authorization of appropriations to the Water Resources Council
Federal law — U.S. Code and appendices · legal_authorities
There are authorized to be appropriated to the Water Resources Council:
**(a) Limitation for single river basin commission** The sum of $2,886,000 for fiscal year 1979 for the Federal share of the expenses of administration and operation of river basin commissions, including salaries and expenses of the chairmen, but not including funds authorized by subsection (c) below: Provided, That not more than $750,000 annually shall be available under this subsection for any single river basin commission;
**(b) Limitation on the expenses of the Water Resources Council** the 11 So in original. Probably should be capitalized. sum of $2,668,000 for fiscal year 1979 for the expenses of the Water Resources Council in administering this chapter, not including funds authorized by subsection (c) below;
**(c) Limitation on availability of funds for preparation of certain studies and for assessments and plans** The sum of $3,179,900 for fiscal year 1979 for preparation of assessments, and for directing and coordinating the preparation of such river basin plans as the Council determines are necessary and desirable in carrying out the policy of this chapter: Provided, That $828,900 shall be available under this subsection for preparation of the Columbia River Estuary Special Study: Provided further, That $308,000 shall be available under this subsection for preparation of the New England Port and Harbor Study and $135,000 shall be available for completion of the Hudson River Basin Level B Study: Provided further, That $150,000 shall be available under this subsection for completion of Case Studies of the Application of Cost Sharing Policy Options for Flood Plain Management in the Connecticut River Basin: Provided further, That not more than $2,500,000 shall be available under this subsec
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 1962d–5
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: bbff591c6c1548f63a6c5be5110ddb1625182d43425a42ead758d6a856fa7f72. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Record provenance
Stable record: federal_law:legal_authorities:record_usc_a946ee3473bc847f1ad0751e
Source file: Laws/federal/codes/united-states-code/title-42/section-1962d5-authorization-of-appropriations-to-the-water-resources-council--c7f195b1c7.md
Pages: Not recorded – Not recorded
Passage SHA-256: 82600f741f798e8e509d6d1533cfdddb26c1d4de24665bda26e1508d39c3426b
Source location: Title 42, Chapter 19B, § 1962d–5; chapter-19b-water-resources-planning.md
Stored source content
There are authorized to be appropriated to the Water Resources Council:
**(a) Limitation for single river basin commission** The sum of $2,886,000 for fiscal year 1979 for the Federal share of the expenses of administration and operation of river basin commissions, including salaries and expenses of the chairmen, but not including funds authorized by subsection (c) below: Provided, That not more than $750,000 annually shall be available under this subsection for any single river basin commission;
**(b) Limitation on the expenses of the Water Resources Council** the 11 So in original. Probably should be capitalized. sum of $2,668,000 for fiscal year 1979 for the expenses of the Water Resources Council in administering this chapter, not including funds authorized by subsection (c) below;
**(c) Limitation on availability of funds for preparation of certain studies and for assessments and plans** The sum of $3,179,900 for fiscal year 1979 for preparation of assessments, and for directing and coordinating the preparation of such river basin plans as the Council determines are necessary and desirable in carrying out the policy of this chapter: Provided, That $828,900 shall be available under this subsection for preparation of the Columbia River Estuary Special Study: Provided further, That $308,000 shall be available under this subsection for preparation of the New England Port and Harbor Study and $135,000 shall be available for completion of the Hudson River Basin Level B Study: Provided further, That $150,000 shall be available under this subsection for completion of Case Studies of the Application of Cost Sharing Policy Options for Flood Plain Management in the Connecticut River Basin: Provided further, That not more than $2,500,000 shall be available under this subsection for the preparation of assessments: Provided further, That the Council may transfer funds authorized by this subsection to river basin commissions and to Federal and State agencies upon such terms and conditions as it determines are necessary and desirable to carry out the above functions in an economical, efficient, and timely manner, and that such commissions and agencies are hereby authorized to receive and expend such funds pursuant to this subsection.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Construction of small shore and beach restoration and protection projects**
(1) **In general** — The Secretary may carry out a program for the construction of small shore and beach restoration and protection projects not specifically authorized by Congress that otherwise comply with [section 426e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section426e&num=0&edition=prelim) if the Secretary determines that such construction is advisable.
(2) **Local cooperation** — The local cooperation requirement of [section 426e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section426e&num=0&edition=prelim) shall apply to a project under this section.
(3) **Completeness** — A project under this subsection—
(A) shall be complete; and
(B) shall not commit the United States to any additional improvement to ensure the successful operation of the project; except for participation in periodic beach nourishment in accordance with—
(i) [section 426e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section426e&num=0&edition=prelim); and
(ii) the procedure for projects authorized after submission of a survey report.
**(b) National shoreline erosion control development and demonstration program**
(1) **In general** — The Secretary shall conduct under the program authorized by subsection (a) a national shoreline erosion control development and demonstration program (referred to in this section as the “demonstration program”).
(2) **Requirements**
(A) *In general* — The demonstration program shall include provisions for—
(i) projects consisting of planning, design, construction, and monitoring of prototype engineered and native and naturalized vegetat
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 426g
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
The cost of operation and maintenance of the general navigation features of small boat harbor projects shall be borne by the United States. This section shall apply to any such project authorized (A) under section 201 of the Flood Control Act of 1965 [[42 U.S.C. 1962d–5](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section1962d–5&num=0&edition=prelim)], (B) under section 107 of the River and Harbor Act of 1960 [[33 U.S.C. 577](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section577&num=0&edition=prelim)], (C) between January 1, 1970, and December 31, 1970, under authority of this Act, and to projects heretofore authorized in accordance with the policy set forth in the preceding sentence and to such projects authorized in this Act or which are hereafter authorized.
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 577b
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.