Browse Arkansas Code titles and sections
42 U.S.C. § 9114 — Procedure
Federal law — U.S. Code and appendices · legal_authorities
**(a) Rules and regulations** The Administrator shall, after consultation with the Secretary of Energy and the heads of other Federal agencies, issue regulations to carry out the purposes and provisions of this chapter, in accordance with the provisions of [section 553 of title 5](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section553&num=0&edition=prelim), without regard to subsection (a) thereof. Such regulations shall pertain to, but need not be limited to, application for issuance, transfer, renewal, suspension, and termination of licenses. Such regulations shall provide for full consultation and cooperation with all other interested Federal agencies and departments and with any potentially affected coastal State, and for consideration of the views of any interested members of the general public. The Administrator is further authorized, consistent with the purposes and provisions of this chapter, to amend or rescind any such regulation. The Administrator shall complete issuance of final regulations to implement this chapter within 1 year of August 3, 1980.
**(b) Site evaluation and preconstruction testing** The Administrator, in consultation with the Secretary of the Interior and the Secretary of the department in which the Coast Guard is operating may, if he determines it to be necessary, prescribe regulations consistent with the purposes of this chapter, relating to those activities in site evaluation and preconstruction testing at potential ocean thermal energy conversion facility or plantship locations that may (1) adversely affect the environment; (2) interfere with other reasonable uses of the high seas or with authorized uses of the Outer Continental Shelf; or (3) pose a threat to human health and safety. If the Administrator prescrib
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 9114
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 62a71928f664ce9ed50b714f3315d8c65cd1660356b90b0c75e7ae39ea8c302e. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_a22713f5598c266877e772e3
Source file: Laws/federal/codes/united-states-code/title-42/section-9114-procedure--7e211fc822.md
Pages: Not recorded – Not recorded
Passage SHA-256: 5b162e57fc5e01fe7f2821736ee106061c8b237d7c4daccaa918647bbc477999
Source location: Title 42, Chapter 99, § 9114; chapter-099-ocean-thermal-energy-conversion.md
Stored source content
**(a) Rules and regulations** The Administrator shall, after consultation with the Secretary of Energy and the heads of other Federal agencies, issue regulations to carry out the purposes and provisions of this chapter, in accordance with the provisions of [section 553 of title 5](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section553&num=0&edition=prelim), without regard to subsection (a) thereof. Such regulations shall pertain to, but need not be limited to, application for issuance, transfer, renewal, suspension, and termination of licenses. Such regulations shall provide for full consultation and cooperation with all other interested Federal agencies and departments and with any potentially affected coastal State, and for consideration of the views of any interested members of the general public. The Administrator is further authorized, consistent with the purposes and provisions of this chapter, to amend or rescind any such regulation. The Administrator shall complete issuance of final regulations to implement this chapter within 1 year of August 3, 1980.
**(b) Site evaluation and preconstruction testing** The Administrator, in consultation with the Secretary of the Interior and the Secretary of the department in which the Coast Guard is operating may, if he determines it to be necessary, prescribe regulations consistent with the purposes of this chapter, relating to those activities in site evaluation and preconstruction testing at potential ocean thermal energy conversion facility or plantship locations that may (1) adversely affect the environment; (2) interfere with other reasonable uses of the high seas or with authorized uses of the Outer Continental Shelf; or (3) pose a threat to human health and safety. If the Administrator prescribes regulations relating to such activities, such activities may not be undertaken after the effective date of such regulations except in accordance therewith.
**(c) Expertise or statutory responsibility descriptions** Not later than 60 days after August 3, 1980, the Secretary of Energy, the Administrator of the Environmental Protection Agency, the Secretary of the department in which the Coast Guard is operating, the Secretary of the Interior, the Chief of Engineers of the United States Army Corps of Engineers, and the heads of any other Federal departments or agencies having expertise concerning, or jurisdiction over, any aspect of the construction or operation of ocean thermal energy conversion facilities or plantships, shall transmit to the Administrator written description of their expertise or statutory responsibilities pursuant to this chapter or any other Federal law.
**(d) Application**
(1) Within 21 days after the receipt of an application, the Administrator shall determine whether the application appears to contain all of the information required by paragraph (2) of this subsection. If the Administrator determines that such information appears to be contained in the application, the Administrator shall, no later than 5 days after making such a determination, publish notice of the application and a summary of the plans in the Federal Register. If the Administrator determines that all of the required information does not appear to be contained in the application, the Administrator shall notify the applicant and take no further action with respect to the application until such deficiencies have been remedied.
(2) Each application shall include such financial, technical, and other information as the Administrator determines by regulation to be necessary or appropriate to process the license pursuant to [section 9111 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section9111&num=0&edition=prelim).
**(e) Area description; additional license applications**
(1) At the time notice of an application for an ocean thermal energy conversion facility is published pursuant to subsection (d) of this section, the Administrator shall publish a description in the Federal Register of an application area encompassing the site proposed in the application for such facility and within which the thermal plume of one ocean thermal energy conversion facility might be expected to impinge on so as to degrade the thermal gradient used by another ocean thermal energy conversion facility, unless the application is for a license for an ocean thermal energy conversion facility to be located within an application area which has already been designated.
(2) The Administrator shall accompany such publication with a call for submission of any other applications for licenses for the ownership, construction, and operation of an ocean thermal energy conversion facility within the designated application area. Any person intending to file such an application shall submit a notice of intent to file an application to the Administrator not later than 60 days after the publication of notice pursuant to subsection (d) of this section, and shall submit the completed application no later than 90 days after publication of such notice. The Administrator shall publish notice of any such application received in accordance with subsection (d) of this section. No application for a license for the ownership, construction, and operation of an ocean thermal energy conversion facility within the designated application area for which a notice of intent to file was received after such 60-day period, or which is received after such 90-day period has elapsed, shall be considered until action has been completed on all timely filed applications pending with respect to such application area.
**(f) Copies of application to other agencies** An application filed with the Administrator shall constitute an application for all Federal authorizations required for ownership, construction, and operation of an ocean thermal energy conversion facility or plantship, except for authorizations required by documentation, inspection, certification, construction, and manning laws and regulations administered by the Secretary of the department in which the Coast Guard is operating. At the time notice of any application is published pursuant to subsection (d) of this section, the Administrator shall forward a copy of such application to those Federal agencies and departments with jurisdiction over any aspect of such ownership, construction, or operation for comment, review, or recommendation as to conditions and for such other action as may be required by law. Each agency or department involved shall review the application and, based upon legal considerations within its area of responsibility, recommend to the Administrator the approval or disapproval of the application not later than 45 days after public hearings are concluded pursuant to subsection (g) of this section. In any case in which an agency or department recommends disapproval, it shall set forth in detail the manner in which the application does not comply with any law or regulation within its area of responsibility and shall notify the Administrator of the manner in which the application may be amended or the license conditioned so as to bring it into compliance with the law or regulation involved.
**(g) Notice, comments, and hearing** A license may be issued, transferred, or renewed only after public notice, opportunity for comment, and public hearings in accordance with this subsection. At least one such public hearing shall be held in the District of Columbia and in any adjacent coastal State to which a facility is proposed to be directly connected by pipeline or electric transmission cable. Any interested person may present relevant material at any such hearing. After the hearings required by this subsection are concluded, if the Administrator determines that there exist one or more specific and material factual issues which may be resolved by a formal evidentiary hearing, at least one adjudicatory hearing shall be held in the District of Columbia in accordance with the provisions of [section 554 of title 5](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section554&num=0&edition=prelim). The record developed in any such adjudicatory hearing shall be part of the basis for the Administrator’s decision to approve or deny a license. Hearings held pursuant to this subsection shall be consolidated insofar as practicable with hearings held by other agencies. All public hearings on all applications with respect to facilities for any designated application area shall be consolidated and shall be concluded not later than 240 days after notice of the initial application has been published pursuant to subsection (d) of this section. All public hearings on applications with respect to ocean thermal energy conversion plantships shall be concluded not later than 240 days after notice of the application has been published pursuant to subsection (d) of this section.
**(h) Administrative fee** The Administrator shall not take final action on any application unless the applicant has paid to the Administrator a reasonable administrative fee, which shall be deposited into miscellaneous receipts of the Treasury. The amount of the fee imposed by the Administrator on any applicant shall reflect the reasonable administrative costs incurred by the National Oceanic and Atmospheric Administration in reviewing and processing the application.
**(i) Approval or denial of application; applications for same area; factors determinative of facility selection**
(1) The Administrator shall approve or deny any timely filed application with respect to a facility for a designated application area submitted in accordance with the provision of this chapter not later than 90 days after public hearings on proposed licenses for that area are concluded pursuant to subsection (g) of this section. The Administrator shall approve or deny an application for a license for ownership, construction, and operation of an ocean thermal energy conversion plantship submitted pursuant to this chapter no later than 90 days after the public hearings on that application are concluded pursuant to subsection (g) of this section.
(2) In the event more than one application for a license for ownership, construction, and operation of an ocean thermal energy conversion facility is submitted pursuant to this chapter for the same designated application area, the Administrator, unless one or a specific combination of the proposed facilities clearly best serves the national interest, shall make decisions on license applications in the order in which they were submitted to him.
(3) In determining whether any one or a specific combination of the proposed ocean thermal energy conversion facilities clearly best serves the national interest, the Administrator, in consultation with the Secretary of Energy, shall consider the following factors:
(A) the goal of making the greatest possible use of ocean thermal energy conversion by installing the largest capacity practicable in each application area;
(B) the amount of net energy impact of each of the proposed ocean thermal energy conversion facilities;
(C) the degree to which the proposed ocean thermal energy conversion facilities will affect the environment;
(D) any significant differences between anticipated dates and commencement of operation of the proposed ocean thermal energy conversion facilities; and
(E) any differences in costs of construction and operation of the proposed ocean thermal energy conversion facilities, to the extent that such differentials may significantly affect the ultimate cost of energy or products to the consumer.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a)** This section applies, according to the provisions thereof, in every case of adjudication required by statute to be determined on the record after opportunity for an agency hearing, except to the extent that there is involved—
(1) a matter subject to a subsequent trial of the law and the facts de novo in a court;
(2) the selection or tenure of an employee, except a 11 So in original. administrative law judge appointed under [section 3105 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section3105&num=0&edition=prelim);
(3) proceedings in which decisions rest solely on inspections, tests, or elections;
(4) the conduct of military or foreign affairs functions;
(5) cases in which an agency is acting as an agent for a court; or
(6) the certification of worker representatives.
**(b)** Persons entitled to notice of an agency hearing shall be timely informed of—
(1) the time, place, and nature of the hearing;
(2) the legal authority and jurisdiction under which the hearing is to be held; and
(3) the matters of fact and law asserted.
When private persons are the moving parties, other parties to the proceeding shall give prompt notice of issues controverted in fact or law; and in other instances agencies may by rule require responsive pleading. In fixing the time and place for hearings, due regard shall be had for the convenience and necessity of the parties or their representatives.
**(c)** The agency shall give all interested parties opportunity for—
(1) the submission and consideration of facts, arguments, offers of settlement, or proposals of adjustment when time, the nature of the proceeding, and the public interest permit; and
(2) to the extent that the parties are unable so to determine a controversy by consent, heari
Source: Supplied U.S. Code snapshot — release unconfirmed · 5 U.S.C. § 554
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a)** It is declared to be the purposes of the Congress in this chapter to—
(1) authorize and regulate the construction, location, ownership, and operation of ocean thermal energy conversion facilities connected to the United States by pipeline or cable, or located in whole or in part between the highwater mark and the seaward boundary of the territorial sea of the United States consistent with the Convention on the High Seas, and general principles of international law;
(2) authorize and regulate the construction, location, ownership, and operation of ocean thermal energy conversion plantships documented under the laws of the United States, consistent with the Convention on the High Seas and general principles of international law;
(3) authorize and regulate the construction, location, ownership, and operation of ocean thermal energy conversion plantships by United States citizens, consistent with the Convention on the High Seas and general principles of international law;
(4) establish a legal regime which will permit and encourage the development of ocean thermal energy conversion as a commercial energy technology;
(5) provide for the protection of the marine and coastal environment, and consideration of the interests of ocean users, to prevent or minimize any adverse impact which might occur as a consequence of the development of such ocean thermal energy conversion facilities or plantships;
(6) make applicable certain provisions of the Merchant Marine Act, 1936 ([46 U.S.C. 1177](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title46-section1177&num=0&edition=prelim) et seq.) 11 See References in Text note below. to assist in financing of ocean thermal energy conversion facilities and plantships;
(7) protect the interests of the United States
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 9111
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
(1) **Sense of Congress** — It is the sense of Congress that the Federal air marshal program is critical to aviation security.
(2) **Limitation on statutory construction** — Nothing in this chapter, including any amendment made by this chapter, shall be construed as preventing the Under Secretary of Transportation for Security from implementing and training Federal air marshals.
Source: Supplied U.S. Code snapshot — release unconfirmed · 6 U.S.C. § 542
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
If any provision of this chapter or any application thereof is held invalid, the validity of the remainder of the chapter, or any other application, shall not be affected thereby.
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 9101
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a)** This section applies, according to the provisions thereof, except to the extent that there is involved—
(1) a military or foreign affairs function of the United States; or
(2) a matter relating to agency management or personnel or to public property, loans, grants, benefits, or contracts.
**(b)** General notice of proposed rule making shall be published in the Federal Register, unless persons subject thereto are named and either personally served or otherwise have actual notice thereof in accordance with law. The notice shall include—
(1) a statement of the time, place, and nature of public rule making proceedings;
(2) reference to the legal authority under which the rule is proposed;
(3) either the terms or substance of the proposed rule or a description of the subjects and issues involved; and
(4) the Internet address of a summary of not more than 100 words in length of the proposed rule, in plain language, that shall be posted on the Internet website under section 206(d) of the E-Government Act of 2002 ([44 U.S.C. 3501](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title44-section3501&num=0&edition=prelim) note) (commonly known as regulations.gov).
Except when notice or hearing is required by statute, this subsection does not apply—
(A) to interpretative rules, general statements of policy, or rules of agency organization, procedure, or practice; or
(B) when the agency for good cause finds (and incorporates the finding and a brief statement of reasons therefor in the rules issued) that notice and public procedure thereon are impracticable, unnecessary, or contrary to the public interest.
**(c)** After notice required by this section, the agency shall give interested persons an opportunity to participate in the rule making through subm
Source: Supplied U.S. Code snapshot — release unconfirmed · 5 U.S.C. § 553
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) License requirement** No person may engage in the ownership, construction, or operation of an ocean thermal energy conversion facility which is documented under the laws of the United States, which is located in whole or in part between the highwater mark and the seaward boundary of the territorial sea of the United States, or which is connected to the United States by pipeline or cable, except in accordance with a license issued pursuant to this chapter. No citizen of the United States may engage in the ownership, construction or operation of an ocean thermal energy conversion plantship except in accordance with a license issued pursuant to this chapter, or in accordance with a license issued by a foreign nation whose licenses are found by the Administrator, after consultation with the Secretary of State, to be compatible with licenses issued pursuant to this chapter.
**(b) Documented plantships; documented facilities; facilities located in territorial sea; facilities connected to United States by pipeline or cable** The Administrator shall, upon application and in accordance with the provisions of this chapter, issue, transfer, amend, or renew licenses for the ownership, construction, and operation of—
(1) ocean thermal energy conversion plantships documented under the laws of the United States, and
(2) ocean thermal energy conversion facilities documented under the laws of the United States, located in whole or in part between the highwater mark and the seaward boundary of the territorial sea of the United States, or connected to the United States by pipeline or cable.
**(c) License issuance prerequisites** The Administrator may issue a license to a citizen of the United States in accordance with the provisions of this chapter unless—
(1) he determines tha
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 9113
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 7680
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 9113
rity, and the Department of Homeland Security Reor-
ganization Plan of November 25, 2002, as modified, set
out as a note under section 542 of Title 6.
§ 9113. Protection of submarine electric trans-
mission cables and equipment
(a) Prohibited acts; misdemeanor; penalty and
fine
Any person who shall willfully and wrongfully
break or injure, or attempt to break or injure,
or who shall in any manner procure, counsel,
aid, abet, or be accessory to such breaking or in-
jury, or attempt to break or injure, any sub-
marine electric transmission cable or equipment
being constructed or operated under a license
issued pursuant to this chapter shall be guilty of
a misdemeanor and, on conviction thereof, shall
be liable to imprisonment for a term not exceed-
ing 2 years, or to a fine not exceeding $5,000, or
to both fine and imprisonment, at the discretion
of the court.
(b) Culpable negligence; misdemeanor; penalty
and fine
Any person who by culpable negligence shall
break or injure any submarine electric trans-
mission cable or equipment being constructed or
operated under a license issued pursuant to this
chapter shall be guilty of a misdemeanor and, on
conviction thereof, shall be liable to imprison-
ment for a term not exceeding 3 months, or to a
fine not exceeding $500, or to both fine and im-
prisonment, at the discretion of the court.
(c) Exceptions
The provisions of subsections (a) and (b) of
this section shall not apply to any person who,
after having taken all necessary precautions to
avoid such breaking or injury, breaks or injures
any submarine electric transmission cable or
equipment in an effort to save the life or limb of
himself or of any other person, or to save his
own or any ot
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 9114
Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.