Arkansas Legal Resource Navigator

15 U.S.C. § 7303 — Authorities

Federal law — U.S. Code and appendices · legal_authorities

15 U.S.C. § 7303 — Authorities

**(a) Entry and inspection** In investigating a building failure under this chapter, members of a Team, and any other person authorized by the Director to support a Team, on display of appropriate credentials provided by the Director and written notice of inspection authority, may— (1) enter property where a building failure being investigated has occurred, or where building components, materials, and artifacts with respect to the building failure are located, and take action necessary, appropriate, and reasonable in light of the nature of the property to be inspected to carry out the duties of the Team under section 7301(b)(2)(A) and (B) of this title; (2) during reasonable hours, inspect any record (including any design, construction, or maintenance record), process, or facility related to the investigation; (3) inspect and test any building components, materials, and artifacts related to the building failure; and (4) move such records, components, materials, and artifacts as provided by the procedures developed under [section 7301(c)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section7301/c/1&num=0&edition=prelim). **(b) Avoiding unnecessary interference and preserving evidence** An inspection, test, or other action taken by a Team under this section shall be conducted in a way that— (1) does not interfere unnecessarily with services provided by the owner or operator of the building components, materials, or artifacts, property, records, process, or facility; and (2) to the maximum extent feasible, preserves evidence related to the building failure, consistent with the ongoing needs of the investigation. **(c) Coordination** (1) **With search and rescue efforts** — A Team shall not impede, and shall coordinate its i

Source: Supplied U.S. Code snapshot — release unconfirmed · 15 U.S.C. § 7303

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 53843ece42fe5ad7a1eeac34dd07b4bfac68793c12fb941d145891f753bb461d. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_9c2768cdb1e1d56d6a1cf457
Source file: Laws/federal/codes/united-states-code/title-15/section-7303-authorities--6a3d912ea3.md
Pages: Not recorded – Not recorded
Passage SHA-256: a7491d8274f4631e1a2588b6b9cf886bbf7bc0545830e79534e0c1911635ad73

Source location: Title 15, Chapter 99, § 7303; chapter-099-national-construction-safety-team.md

Stored source content

**(a) Entry and inspection** In investigating a building failure under this chapter, members of a Team, and any other person authorized by the Director to support a Team, on display of appropriate credentials provided by the Director and written notice of inspection authority, may— (1) enter property where a building failure being investigated has occurred, or where building components, materials, and artifacts with respect to the building failure are located, and take action necessary, appropriate, and reasonable in light of the nature of the property to be inspected to carry out the duties of the Team under section 7301(b)(2)(A) and (B) of this title; (2) during reasonable hours, inspect any record (including any design, construction, or maintenance record), process, or facility related to the investigation; (3) inspect and test any building components, materials, and artifacts related to the building failure; and (4) move such records, components, materials, and artifacts as provided by the procedures developed under [section 7301(c)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section7301/c/1&num=0&edition=prelim). **(b) Avoiding unnecessary interference and preserving evidence** An inspection, test, or other action taken by a Team under this section shall be conducted in a way that— (1) does not interfere unnecessarily with services provided by the owner or operator of the building components, materials, or artifacts, property, records, process, or facility; and (2) to the maximum extent feasible, preserves evidence related to the building failure, consistent with the ongoing needs of the investigation. **(c) Coordination** (1) **With search and rescue efforts** — A Team shall not impede, and shall coordinate its investigation with, any search and rescue efforts being undertaken at the site of the building failure. (2) **With other research** — A Team shall coordinate its investigation, to the extent practicable, with qualified researchers who are conducting engineering or scientific (including social science) research relating to the building failure. (3) **Memoranda of understanding** — The National Institute of Standards and Technology shall enter into a memorandum of understanding with each Federal agency that may conduct or sponsor a related investigation, providing for coordination of investigations. (4) **With State and local authorities** — A Team shall cooperate with State and local authorities carrying out any activities related to a Team’s investigation. (5) **Civil suits** — Where practicable, a Team shall cooperate with civil litigants without compromising a Team’s investigation or the evidence preservation activities as described in this section. **(d) Investigation priorities** (1) **In general** — Except as provided in paragraph (2) or (3), a Team investigation shall have priority over any other investigation of any other Federal agency or any civil suit or civil action. (2) **National Transportation Safety Board** — If the National Transportation Safety Board is conducting an investigation related to an investigation of a Team, the National Transportation Safety Board investigation shall have priority over the Team investigation. Such priority shall not otherwise affect the authority of the Team to continue its investigation under this chapter. (3) **Criminal acts** — If the Attorney General, in consultation with the Director, determines, and notifies the Director, that circumstances reasonably indicate that the building failure being investigated by a Team may have been caused by a criminal act, the Team shall relinquish investigative priority to the appropriate law enforcement agency. The relinquishment of investigative priority by the Team shall not otherwise affect the authority of the Team to continue its investigation under this chapter. (4) **Preservation of evidence** — If a Federal law enforcement agency suspects and notifies the Director that a building failure being investigated by a Team under this chapter may have been caused by a criminal act, the Team, in consultation with the Federal law enforcement agency, shall take necessary actions to ensure that evidence of the criminal act is preserved.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

15 U.S.C. § 7301 — National Construction Safety Teams

**(a) Establishment** The Director of the National Institute of Standards and Technology (in this chapter referred to as the “Director”) is authorized to establish National Construction Safety Teams (in this chapter referred to as a “Team”) for deployment after events causing the failure of a building or buildings that has resulted in substantial loss of life or that posed significant potential for substantial loss of life. To the maximum extent practicable, the Director shall establish and deploy a Team within 48 hours after such an event. The Director shall promptly publish in the Federal Register notice of the establishment of each Team. **(b) Purpose of investigation; duties** (1) **Purpose** — The purpose of investigations by Teams is to improve the safety and structural integrity of buildings in the United States. (2) **Duties** — A Team shall— (A) establish the likely technical cause or causes of the building failure; (B) evaluate the technical aspects of evacuation and emergency response procedures; (C) recommend, as necessary, specific improvements to building standards, codes, and practices based on the findings made pursuant to subparagraphs (A) and (B); and (D) recommend any research and other appropriate actions needed to improve the structural safety of buildings, and improve evacuation and emergency response procedures, based on the findings of the investigation. **(c) Procedures** (1) **Development** — Not later than 3 months after October 1, 2002, the Director, in consultation with the United States Fire Administration and other appropriate Federal agencies, shall develop procedures for the establishment and deployment of Teams. The Director shall update such procedures as appropriate. Such procedures shall include provisions— (A) re

Source: Supplied U.S. Code snapshot — release unconfirmed · 15 U.S.C. § 7301

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

15 U.S.C. § 7303 — Authorities

Page 2344 TITLE 15—COMMERCE AND TRADE § 7302 tion 7307 of this title;’’ in subsec. (c)(1)(d), was executed to subsec. (c)(1)(D), to reflect the probable intent of Congress. Statutory Notes and Related Subsidiaries SHORT TITLE Pub. L. 107–231, § 1, Oct. 1, 2002, 116 Stat. 1471, provided that: ‘‘This Act [enacting this chapter and amending section 281a of this title] may be cited as the ‘National Construction Safety Team Act’.’’ § 7302. Composition of Teams Each Team shall be composed of individuals selected by the Director and led by an individual designated by the Director. Team members shall include at least 1 employee of the National In- stitute of Standards and Technology and shall include other experts who are not employees of the National Institute of Standards and Tech- nology, who may include private sector experts, university experts, representatives of profes- sional organizations with appropriate expertise, and appropriate Federal, State, or local offi- cials. Team members who are not Federal em- ployees shall be considered Federal Government contractors. (Pub. L. 107–231, § 3, Oct. 1, 2002, 116 Stat. 1472.) § 7303. Authorities (a) Entry and inspection In investigating a building failure under this chapter, members of a Team, and any other per- son authorized by the Director to support a Team, on display of appropriate credentials pro- vided by the Director and written notice of in- spection authority, may— (1) enter property where a building failure being investigated has occurred, or where building components, materials, and artifacts with respect to the building failure are lo- cated, and take action necessary, appropriate, and reasonable in light of the nature of the property to be inspected to carry out the du- ties of the Team

Source: Supplied 2024 U.S. Code historical extraction · 15 U.S.C. § 7303

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.