Arkansas Legal Resource Navigator

33 U.S.C. § 2218 — Feasibility studies; planning, engineering, and design

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2218 — Feasibility studies; planning, engineering, and design

**(a) Feasibility studies** (1) **Cost sharing** (A) *In general* — The Secretary shall not initiate any feasibility study for a water resources project after November 17, 1986, until appropriate non-Federal interests agree, by contract, to contribute 50 percent of the cost of the study. (B) *Payment of cost share during period of study* — During the period of the study, the non-Federal share of the cost of the study payable under subparagraph (A) shall be 50 percent of the sum of— (i) the cost estimate for the study as contained in the feasibility cost-sharing agreement; and (ii) any excess of the cost of the study over the cost estimate if the excess results from— (I) a change in Federal law; or (II) a change in the scope of the study requested by the non-Federal interests. (C) *Payment of cost share on authorization of project or termination of study* (i) *Project timely authorized* — Except as otherwise agreed to by the Secretary and the non-Federal interests and subject to clause (ii), the non-Federal share of any excess of the cost of the study over the cost estimate (excluding any excess cost described in subparagraph (B)(ii)) shall be payable on the date on which the Secretary and the non-Federal interests enter into an agreement pursuant to section 2211(e) or 2213(j) of this title with respect to the project. (ii) *Project not timely authorized* — If the project that is the subject of the study is not authorized by the date that is 5 years after the completion of the final report of the Chief of Engineers concerning the study or the date that is 2 years after the termination of the study, the non-Federal share of any excess of the cost of the study over the cost estimate (excluding any excess cost described in subpara

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2218

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 7dd9c2d4958e61006054b6df175fa90fe7047689b84664201bbbd1857c737978. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_933f9f9abda3b305d2d85b26
Source file: Laws/federal/codes/united-states-code/title-33/section-2218-feasibility-studies-planning-engineering-and-design--75de519c13.md
Pages: Not recorded – Not recorded
Passage SHA-256: f387dea6eef3836f641b55a0a1e88179505fcb2d3f3e44645366c6c67c1f4c17

Source location: Title 33, Chapter 36, § 2218; chapter-036-water-resources-development.md

Stored source content

**(a) Feasibility studies** (1) **Cost sharing** (A) *In general* — The Secretary shall not initiate any feasibility study for a water resources project after November 17, 1986, until appropriate non-Federal interests agree, by contract, to contribute 50 percent of the cost of the study. (B) *Payment of cost share during period of study* — During the period of the study, the non-Federal share of the cost of the study payable under subparagraph (A) shall be 50 percent of the sum of— (i) the cost estimate for the study as contained in the feasibility cost-sharing agreement; and (ii) any excess of the cost of the study over the cost estimate if the excess results from— (I) a change in Federal law; or (II) a change in the scope of the study requested by the non-Federal interests. (C) *Payment of cost share on authorization of project or termination of study* (i) *Project timely authorized* — Except as otherwise agreed to by the Secretary and the non-Federal interests and subject to clause (ii), the non-Federal share of any excess of the cost of the study over the cost estimate (excluding any excess cost described in subparagraph (B)(ii)) shall be payable on the date on which the Secretary and the non-Federal interests enter into an agreement pursuant to section 2211(e) or 2213(j) of this title with respect to the project. (ii) *Project not timely authorized* — If the project that is the subject of the study is not authorized by the date that is 5 years after the completion of the final report of the Chief of Engineers concerning the study or the date that is 2 years after the termination of the study, the non-Federal share of any excess of the cost of the study over the cost estimate (excluding any excess cost described in subparagraph (B)(ii)) shall be payable to the United States on that date. (D) *Amendment of cost estimate* — The cost estimate referred to in subparagraph (B)(i) may be amended only by agreement of the Secretary and the non-Federal interests. (E) *In-kind contributions* — The non-Federal share required under this paragraph may be satisfied by the provision of services, materials, supplies, or other in-kind services necessary to prepare the feasibility report. (2) **Applicability** — This subsection shall not apply to any water resources study primarily designed for the purposes of navigational improvements in the nature of dams, locks, and channels on the Nation’s system of inland waterways. (3) **Detailed project reports** — The requirements of this subsection that apply to a feasibility study also shall apply to a study that results in a detailed project report, except that— (A) the first $100,000 of the costs of a study that results in a detailed project report shall be a Federal expense; and (B) paragraph (1)(C)(ii) shall not apply to such a study. **(b) Planning and engineering** The Secretary shall not initiate any planning or engineering for a water resources project until appropriate non-Federal interests agree, by contract, to contribute 50 percent of the cost of the planning and engineering during the period of the planning and engineering. Costs of planning and engineering of projects for which non-Federal interests contributed 50 percent of the cost of the feasibility study shall be treated as costs of construction. **(c) Design** Costs of design of a water resources project shall be shared in the same percentage as the purposes of such project. **(d) Definitions** In this section, the following definitions apply: (1) **Detailed project report** — The term “detailed project report” means a report for a project not specifically authorized by Congress in law or otherwise that determines the feasibility of the project with a level of detail appropriate to the scope and complexity of the recommended solution and sufficient to proceed directly to the preparation of contract plans and specifications. The term includes any associated environmental impact statement and mitigation plan. For a project for which the Federal cost does not exceed $1,000,000, the term includes a planning and design analysis document. (2) **Feasibility study** — The term “feasibility study” means a study that results in a feasibility report under [section 2282 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2282&num=0&edition=prelim), and any associated environmental impact statement and mitigation plan, prepared by the Corps of Engineers for a water resources project. The term includes a study that results in a project implementation report prepared under title VI of the Water Resources Development Act of 2000 (114 Stat. 2680–2694), a general reevaluation report, and a limited reevaluation report.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2282 — Corps of Engineers support for underserved communities; outreach

**(a) In general** It is the policy of the United States for the Corps of Engineers to strive to understand and accommodate and, in coordination with non-Federal interests, seek to address the water resources development needs of all communities in the United States. **(b) Outreach and access** (1) **In general** — The Secretary shall, at Federal expense, develop, support, and implement public awareness, education, and regular outreach and engagement efforts for potential non-Federal interests with respect to the water resources development authorities of the Secretary, with particular emphasis on— (A) technical service programs, including the authorities under— (i) [section 709a of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section709a&num=0&edition=prelim); (ii) [section 1962d–16 of title 42](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section1962d–16&num=0&edition=prelim); and (iii) [section 2269 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2269&num=0&edition=prelim); (B) continuing authority programs, as such term is defined in [section 2282d(c)(1)(D) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2282d/c/1/D&num=0&edition=prelim); and (C) ensuring that a potential non-Federal interest is aware of the roles, responsibilities, and financial commitments associated with a completed water resources development project prior to initiating a feasibility study (as defined in [section 2215(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2215/d&num=0&edition=prelim)), including operations, maintenance, repair, replacement, and rehabilitation responsibili

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2282

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2201 — Prior project authorization

In any case in which a project under the jurisdiction of the Secretary is budgeted under a different business line than the business line under which the project was originally authorized, the Secretary shall ensure that the project is carried out in accordance with any requirements that apply to the business line under which the project was originally authorized.

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2201

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2218 — General applicability of cost sharing

Page 713 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2220 Subsec. (d). Pub. L. 110–114, § 2043(a)(3), added subsec. (d). 2000—Subsec. (a)(1)(E). Pub. L. 106–541 substituted ‘‘The’’ for ‘‘Not more than 1⁄2 of the’’. 1996—Subsec. (a)(1). Pub. L. 104–303, § 203(a)(1), in- serted heading and amended text of par. (1) generally. Prior to amendment text read as follows: ‘‘The Sec- retary shall not initiate any feasibility study for a water resources project after November 17, 1986, until appropriate non-Federal interests agree, by contract, to contribute 50 percent of the cost for such study dur- ing the period of such study. Not more than one-half of such non-Federal contribution may be made by the pro- vision of services, materials, supplies, or other in-kind services necessary to prepare the feasibility report.’’ Subsec. (a)(2). Pub. L. 104–303, § 203(a)(2), inserted heading. 1990—Subsec. (b). Pub. L. 101–640 inserted at end ‘‘Costs of planning and engineering of projects for which non-Federal interests contributed 50 percent of the cost of the feasibility study shall be treated as costs of construction.’’ Statutory Notes and Related Subsidiaries EFFECTIVE DATE OF 1996 AMENDMENT Pub. L. 104–303, title II, § 203(b), Oct. 12, 1996, 110 Stat. 3678, provided that: ‘‘The amendments made by sub- section (a) [amending this section] shall apply notwith- standing any feasibility cost-sharing agreement en- tered into by the Secretary and the non-Federal inter- ests. On request of the non-Federal interest, the Sec- retary shall amend any feasibility cost-sharing agree- ments in effect on the date of the enactment of this Act [Oct. 12, 1996] so as to conform the agreements with the amendments.’’ NO REQUIREMENT OF REIMBURSEMENT Pub. L. 104–303, title II, § 203(c), O

Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2218

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.