10 U.S.C. § 8669c — Assessments required prior to start of construction on first ship of a shipbuilding program

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 8669c — Assessments required prior to start of construction on first ship of a shipbuilding program

**(a) In General.—** The Secretary of the Navy may not approve the start of construction of the first ship for any major shipbuilding program until a period of 15 days has elapsed following the date on which the Secretary— (1) submits a report to the congressional defense committees on the results of any production readiness review; (2) certifies to the congressional defense committees that the findings of any such review support the start of construction; and (3) certifies to the congressional defense committees that at least 95 percent of all the basic and functional design drawing packages for the ship have reached final approval. **(b) Report.—** The report required by subsection (a)(1) shall include each of the following: (1) An identification of the degree to which detail design and production design drawings and related documents have been completed in accordance with the shipbuilding contract. (2) An assessment of the readiness of the shipyard facilities and workforce to begin construction. (3) The Navy’s estimated delivery date and a description of any risks that could affect such delivery date. (4) An assessment of the extent to which adequate processes and metrics are in place to measure and manage program risks. (5) With respect to the first ship, a description of the plans of the Navy to oversee and document the construction of the ship to ensure that the detail design supports the construction schedule for the ship. (6) A definition of the term “start of construction” that— (A) is applicable to the first ship; and (B) does not mean a point in time— (i) after the completion of 5 percent of lightship displacement; or (ii) after the advance procurement or advance construction of the ship. (7) An identification of any fabrication of

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 8669c

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 8e64d597073f82c3ce9e4d4fec1b08ce6400bc36f2311a5b9613c2eafb5370d1. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_8c21737f16127e1fcbdd16ee
Source file: Laws/federal/codes/united-states-code/title-10/section-8669c-assessments-required-prior-to-start-of-construction-on-first-ship-of-a-s--2655c7447d.md
Pages: Not recorded – Not recorded
Passage SHA-256: 4d8b3d1ac4d0861d2acae2293e24658e24704f75ae36b45deadc21118033581b

Source location: Title 10, Chapter 863, § 8669c; chapter-863-naval-vessels.md

Stored source content

**(a) In General.—** The Secretary of the Navy may not approve the start of construction of the first ship for any major shipbuilding program until a period of 15 days has elapsed following the date on which the Secretary— (1) submits a report to the congressional defense committees on the results of any production readiness review; (2) certifies to the congressional defense committees that the findings of any such review support the start of construction; and (3) certifies to the congressional defense committees that at least 95 percent of all the basic and functional design drawing packages for the ship have reached final approval. **(b) Report.—** The report required by subsection (a)(1) shall include each of the following: (1) An identification of the degree to which detail design and production design drawings and related documents have been completed in accordance with the shipbuilding contract. (2) An assessment of the readiness of the shipyard facilities and workforce to begin construction. (3) The Navy’s estimated delivery date and a description of any risks that could affect such delivery date. (4) An assessment of the extent to which adequate processes and metrics are in place to measure and manage program risks. (5) With respect to the first ship, a description of the plans of the Navy to oversee and document the construction of the ship to ensure that the detail design supports the construction schedule for the ship. (6) A definition of the term “start of construction” that— (A) is applicable to the first ship; and (B) does not mean a point in time— (i) after the completion of 5 percent of lightship displacement; or (ii) after the advance procurement or advance construction of the ship. (7) An identification of any fabrication of the hull and superstructure of the ship that will occur before the date on which the Secretary submits the certifications required under paragraphs (2) and (3) of subsection (a). (8) An identification of the extent of to which vendor- and government-furnished information supports the overall maturity and stability of the ship’s design, including information regarding— (A) whether vendor selection is complete for major distributive systems and key equipment supporting operational requirements; (B) whether specifications are finalized for major distributive systems and key equipment; and (C) the status of factory acceptance testing, as applicable, to validate finalized specifications for major distributive systems and key equipment through manufacturing. **(c) Definitions.—** For the purposes of subsection (a): (1) **Basic and functional design.—** — The term “basic and functional design”, when used with respect to a vessel, means design through computer aided models, and when used with respect to manned surface and undersea combatants, means design through the completion of three-dimensional computer aided modeling, that— (A) supports the major hull structure of the vessel; (B) sets the hydrodynamics of the vessel; and (C) positions and routes all major distributive systems of the ship, including electricity, water, and other utilities. (2) **First ship.—** — The term “first ship” applies to a ship if— (A) the ship is the first ship to be constructed under that shipbuilding program; or (B) the shipyard at which the ship is to be constructed has not previously started construction on a ship under that shipbuilding program. (3) **Major shipbuilding program.—** — The term “major shipbuilding program” means a program for the construction of combatant and support vessels required for the naval vessel force, as reported within the annual naval vessel construction plan required by [section 231 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section231&num=0&edition=prelim). (4) **Production readiness review.—** — The term “production readiness review” means a formal examination of a program prior to the start of construction to determine if the design is ready for production, production engineering problems have been resolved, and the producer has accomplished adequate planning for the production phase.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 231 — Budgeting for construction, maintenance, and modernization of naval vessels: annual plans and certifications

**(a) Annual Naval Vessel Construction Plan and Certification.—** The Secretary of the Navy shall include with the defense budget materials for a fiscal year each of the following: (1) A plan for the construction of naval vessels developed in accordance with this section for each of the following classes of ships: (A) Combatant and support vessels. (B) Auxiliary vessels. (2) A certification by the Secretary that both the budget for that fiscal year and the future-years defense program submitted to Congress in relation to such budget under [section 221 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section221&num=0&edition=prelim) provide for funding of the construction of naval vessels at a level that is sufficient for the procurement of the vessels provided for in the plan under paragraph (1) on the schedule provided in that plan, together with the views of the Chief of Naval Operations and Commandant of the Marine Corps on the budget. (3) The unaltered assessment of the Chief of Naval Operations and the Commandant of the Marine Corps of the plan required under paragraph (1). **(b) Annual Naval Vessel Construction Plan.—** (1) The annual naval vessel construction plan developed for a fiscal year for purposes of subsection (a)(1) shall be designed so that the naval vessel force provided for under that plan supports the national security strategy of the United States as set forth in the most recent national security strategy report of the President under section 108 of the National Security Act of 1947 ([50 U.S.C. 3043](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title50-section3043&num=0&edition=prelim)), except that, if at the time such plan is submitted with the defense budget materials for that fiscal y

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 231

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 8661 — Classification

The President may establish, and from time to time modify, as the needs of the service require, a classification of naval vessels.

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 8661

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 8669c — Assessments required prior to start of

Page 3326 TITLE 10—ARMED FORCES § 8669c Statutory Notes and Related Subsidiaries EFFECTIVE DATE OF 2021 AMENDMENT Amendment by section 1883(b)(2) of Pub. L. 116–283 ef- fective Jan. 1, 2022, with additional provisions for de- layed implementation and applicability of existing law, see section 1801(d) of Pub. L. 116–283, set out as a note preceding section 3001 of this title. § 8669c. Assessments required prior to start of construction on first ship of a shipbuilding program (a) IN GENERAL.—The Secretary of the Navy may not approve the start of construction of the first ship for any major shipbuilding program until a period of 15 days has elapsed following the date on which the Secretary— (1) submits a report to the congressional de- fense committees on the results of any produc- tion readiness review; (2) certifies to the congressional defense committees that the findings of any such re- view support the start of construction; and (3) certifies to the congressional defense committees that at least 95 percent of all the basic and functional design drawing packages for the ship have reached final approval. (b) REPORT.—The report required by sub- section (a)(1) shall include each of the following: (1) An identification of the degree to which detail design and production design drawings and related documents have been completed in accordance with the shipbuilding contract. (2) An assessment of the readiness of the shipyard facilities and workforce to begin con- struction. (3) The Navy’s estimated delivery date and a description of any risks that could affect such delivery date. (4) An assessment of the extent to which adequate processes and metrics are in place to measure and manage program risks. (5) With respect to the first ship, a descrip

Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 8669c

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.