Arkansas Legal Resource Navigator

42 U.S.C. § 8482 — Repealed. Pub. L. 104–66, title I, § 1051(e), Dec. 21, 1995, 109 Stat. 716

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 8482 — Repealed. Pub. L. 104–66, title I, § 1051(e), Dec. 21, 1995, 109 Stat. 716

### Statutory Notes Section, Pub. L. 95–620, title VIII, § 806, Nov. 9, 1978, 92 Stat. 3348, directed Secretary of Energy to submit annual report to Congress on actions already taken and actions to be taken under this chapter and under [section 792 of title 15](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section792&num=0&edition=prelim).

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 8482

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 06b8d1f4ad61e77248e8c1c10b7ba03e291b6ea1409dcb922f074766bbdb8824. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_7f182511b272ab3b5bb06bb1
Source file: Laws/federal/codes/united-states-code/title-42/section-8482-repealed-pub-l-10466-title-i-1051-e-dec-21-1995-109-stat-716--0bd4accacd.md
Pages: Not recorded – Not recorded
Passage SHA-256: fc9d5f92afd856afac5817edf8ac8d7a6677fde24169883ed0b222f40af50a2d

Source location: Title 42, Chapter 92, § 8482; chapter-092-powerplant-and-industrial-fuel-use.md

Stored source content

### Statutory Notes Section, Pub. L. 95–620, title VIII, § 806, Nov. 9, 1978, 92 Stat. 3348, directed Secretary of Energy to submit annual report to Congress on actions already taken and actions to be taken under this chapter and under [section 792 of title 15](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section792&num=0&edition=prelim).

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

15 U.S.C. § 792 — Coal conversion and allocation

**(a) Powerplant and fuel burning installations** The Federal Energy Administrator— (1) shall, by order, prohibit any powerplant, and (2) may, by order, prohibit any major fuel burning installation, other than a powerplant, from burning natural gas or petroleum products as its primary energy source, if the requirements of subsection (b) are met and if (A) the Federal Energy Administrator determines such powerplant or installation on June 22, 1974, had, or thereafter acquires or is designed with, the capability and necessary plant equipment to burn coal, or (B) such powerplant or installation is required to meet a design or construction requirement under subsection (c). **(b) Prerequisites to issuance or effectiveness of orders prohibiting use of natural gas or petroleum products as primary energy source** The requirements referred to in subsection (a) are as follows: (1) An order under subsection (a) may not be issued with respect to a powerplant or installation unless the Federal Energy Administrator finds (A) that the burning of coal by such plant or installation, in lieu of petroleum products or natural gas, is practicable and consistent with the purposes of this chapter, (B) that coal and coal transportation facilities will be available during the period the order is in effect, and (C) in the case of a powerplant, that the prohibition under subsection (a) will not impair the reliability of service in the area served by such plant. Such an order shall be rescinded or modified to the extent the Federal Energy Administrator determines that any requirement described in subparagraph (A), (B), or (C) of this paragraph is no longer met; and such an order may at any time be modified if the Federal Energy Administrator determines that such order, as modified, complies wi

Source: Supplied U.S. Code snapshot — release unconfirmed · 15 U.S.C. § 792

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 8421 — Information

**(a) Authority of Secretary** For purposes of carrying out his responsibilities under this chapter, the Secretary may require, under the authority of this chapter or any other authority administered by him, any person owning, operating or controlling any electric powerplant, or any other person otherwise subject to this chapter to submit such information and reports of any kind or nature directly to the Secretary necessary to implement the provisions of this chapter, and insure compliance with the provisions of this chapter, and any rule or order thereunder. The provisions of [section 796(d) of title 15](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section796/d&num=0&edition=prelim) shall apply with respect to information obtained under this section to the same extent and in the same manner as it applies with respect to energy information obtained under [section 796 of title 15](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section796&num=0&edition=prelim). **(b) Authority of President and Federal Energy Regulatory Commission** In the case of responsibilities expressly given by this chapter to the President or the Federal Energy Regulatory Commission, subsection (a) shall be applied as if the references to the Secretary were references to the President or the Federal Energy Regulatory Commission, as the case may be. **(c) Natural gas usage by electric utilities** (1) For purposes of [section 8374(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8374/b&num=0&edition=prelim) and other emergency authorities, the Secretary shall obtain data necessary to determine— (A) within 6 months after August 13, 1981, the total quantities of natural gas used as a primary energy source by

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 8421

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 8482 — Repealed. Pub. L. 104–66, title I, § 1051(e),

Page 7616 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 8473 1 So in original. Probably should be ‘‘section’’. Pub. L. 95–620, set out as an Effective Date note under section 8301 of this title. This chapter, referred to in text, was in the original ‘‘this Act’’, meaning Pub. L. 95–620, Nov. 9, 1978, 92 Stat. 3289, known as the Powerplant and Industrial Fuel Use Act of 1978, which is classified principally to this chap- ter. For complete classification of this Act to the Code, see Short Title note set out under section 8301 of this title and Tables. § 8473. Environmental impact statements under section 4332 of this title The following actions are not deemed to be major Federal actions for purposes of section 4332(2)(C) of this title: (1) the grant or denial of any temporary ex- emption under this chapter for any electric powerplant; (2) the grant or denial of any permanent ex- emption under this chapter for any existing electric powerplant, other than an exemp- tion— (A) under section 8352(c) of this title, relat- ing to cogeneration; (B) Repealed. Pub. L. 100–42, § 1(c)(24)(B), May 21, 1987, 101 Stat. 314; (C) under section 8352(b) of this title, relat- ing to certain State or local requirements; (D) under section 8352(g) of this title, re- lating to certain intermediate load power- plants; and (3) the grant or denial of any exemption under this chapter for any powerplant for which the Secretary finds, in consultation with the appropriate Federal agency, and pub- lishes such finding that an environmental im- pact statement is required in connection with another Federal action and such statement will be prepared by such agency and will re- flect the exemption adequately. Except as provided in the preceding provisions of this section, any determinat

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 8482

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.