Arkansas Legal Resource Navigator

42 U.S.C. § 7479 — Definitions

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7479 — Definitions

For purposes of this part— (1) The term “major emitting facility” means any of the following stationary sources of air pollutants which emit, or have the potential to emit, one hundred tons per year or more of any air pollutant from the following types of stationary sources: fossil-fuel fired steam electric plants of more than two hundred and fifty million British thermal units per hour heat input, coal cleaning plants (thermal dryers), kraft pulp mills, Portland Cement plants, primary zinc smelters, iron and steel mill plants, primary aluminum ore reduction plants, primary copper smelters, municipal incinerators capable of charging more than fifty tons of refuse per day, hydrofluoric, sulfuric, and nitric acid plants, petroleum refineries, lime plants, phosphate rock processing plants, coke oven batteries, sulfur recovery plants, carbon black plants (furnace process), primary lead smelters, fuel conversion plants, sintering plants, secondary metal production facilities, chemical process plants, fossil-fuel boilers of more than two hundred and fifty million British thermal units per hour heat input, petroleum storage and transfer facilities with a capacity exceeding three hundred thousand barrels, taconite ore processing facilities, glass fiber processing plants, charcoal production facilities. Such term also includes any other source with the potential to emit two hundred and fifty tons per year or more of any air pollutant. This term shall not include new or modified facilities which are nonprofit health or education institutions which have been exempted by the State. (2) (A) The term “commenced” as applied to construction of a major emitting facility means that the owner or operator has obtained all necessary preconstruction approv­als or permits required by Fed

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7479

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: de10b5cfb4309630e79287c29dccbf45960657ff398ac8c30d8791da072e6ea3. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_7b3cc072806d7a25a22328ba
Source file: Laws/federal/codes/united-states-code/title-42/section-7479-definitions--ac5b8d2c55.md
Pages: Not recorded – Not recorded
Passage SHA-256: c1d6cfc31558e1b34cb498ce757e4a848b36fde87ed447cfea9cc06a767f97cc

Source location: Title 42, Chapter 85, § 7479; chapter-085-air-pollution-prevention-and-control.md

Stored source content

For purposes of this part— (1) The term “major emitting facility” means any of the following stationary sources of air pollutants which emit, or have the potential to emit, one hundred tons per year or more of any air pollutant from the following types of stationary sources: fossil-fuel fired steam electric plants of more than two hundred and fifty million British thermal units per hour heat input, coal cleaning plants (thermal dryers), kraft pulp mills, Portland Cement plants, primary zinc smelters, iron and steel mill plants, primary aluminum ore reduction plants, primary copper smelters, municipal incinerators capable of charging more than fifty tons of refuse per day, hydrofluoric, sulfuric, and nitric acid plants, petroleum refineries, lime plants, phosphate rock processing plants, coke oven batteries, sulfur recovery plants, carbon black plants (furnace process), primary lead smelters, fuel conversion plants, sintering plants, secondary metal production facilities, chemical process plants, fossil-fuel boilers of more than two hundred and fifty million British thermal units per hour heat input, petroleum storage and transfer facilities with a capacity exceeding three hundred thousand barrels, taconite ore processing facilities, glass fiber processing plants, charcoal production facilities. Such term also includes any other source with the potential to emit two hundred and fifty tons per year or more of any air pollutant. This term shall not include new or modified facilities which are nonprofit health or education institutions which have been exempted by the State. (2) (A) The term “commenced” as applied to construction of a major emitting facility means that the owner or operator has obtained all necessary preconstruction approv­als or permits required by Federal, State, or local air pollution emissions and air quality laws or regulations and either has (i) begun, or caused to begin, a continuous program of physical on-site construction of the facility or (ii) entered into binding agreements or contractual obligations, which cannot be canceled or modified without substantial loss to the owner or operator, to undertake a program of construction of the facility to be completed within a reasonable time. (B) The term “necessary preconstruction approvals or permits” means those permits or approvals, required by the permitting authority as a precondition to undertaking any activity under clauses (i) or (ii) of subparagraph (A) of this paragraph. (C) The term “construction” when used in connection with any source or facility, includes the modification (as defined in [section 7411(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7411/a&num=0&edition=prelim)) of any source or facility. (3) The term “best available control technology” means an emission limitation based on the maximum degree of reduction of each pollutant subject to regulation under this chapter emitted from or which results from any major emitting facility, which the permitting authority, on a case-by-case basis, taking into account energy, environmental, and economic impacts and other costs, determines is achievable for such facility through application of production processes and available methods, systems, and techniques, including fuel cleaning, clean fuels, or treatment or innovative fuel combustion techniques for control of each such pollutant. In no event shall application of “best available control technology” result in emissions of any pollutants which will exceed the emissions allowed by any applicable standard established pursuant to section 7411 or 7412 of this title. Emissions from any source utilizing clean fuels, or any other means, to comply with this paragraph shall not be allowed to increase above levels that would have been required under this paragraph as it existed prior to November 15, 1990. (4) The term “baseline concentration” means, with respect to a pollutant, the ambient concentration levels which exist at the time of the first application for a permit in an area subject to this part, based on air quality data available in the Environmental Protection Agency or a State air pollution control agency and on such monitoring data as the permit applicant is required to submit. Such ambient concentration levels shall take into account all projected emissions in, or which may affect, such area from any major emitting facility on which construction commenced prior to January 6, 1975, but which has not begun operation by the date of the baseline air quality concentration determination. Emissions of sulfur oxides and particulate matter from any major emitting facility on which construction commenced after January 6, 1975, shall not be included in the baseline and shall be counted against the maximum allowable increases in pollutant concentrations established under this part.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

26 U.S.C. § 48A — Qualifying advanced coal project credit

**(a) In general** For purposes of section 46, the qualifying advanced coal project credit for any taxable year is an amount equal to— (1) 20 percent of the qualified investment for such taxable year in the case of projects described in subsection (d)(3)(B)(i), (2) 15 percent of the qualified investment for such taxable year in the case of projects described in subsection (d)(3)(B)(ii), and (3) 30 percent of the qualified investment for such taxable year in the case of projects described in clause (iii) of subsection (d)(3)(B). **(b) Qualified investment** (1) **In general** — For purposes of subsection (a), the qualified investment for any taxable year is the basis of eligible property placed in service by the taxpayer during such taxable year which is part of a qualifying advanced coal project— (A) (i) the construction, reconstruction, or erection of which is completed by the taxpayer, or (ii) which is acquired by the taxpayer if the original use of such property commences with the taxpayer, and (B) with respect to which depreciation (or amortization in lieu of depreciation) is allowable. (2) **Special rule for certain subsidized property** — Rules similar to section 48(a)(4) (without regard to subparagraph (D) thereof) shall apply for purposes of this section. (3) **Certain qualified progress expenditures rules made applicable** — Rules similar to the rules of subsections (c)(4) and (d) of section 46 (as in effect on the day before the enactment of the Revenue Reconciliation Act of 1990) shall apply for purposes of this section. **(c) Definitions** For purposes of this section— (1) **Qualifying advanced coal project** — The term “qualifying advanced coal project” means a project which meets the requirements of subsection (e). (2) **Advanced

Source: Supplied U.S. Code snapshot — release unconfirmed · 26 U.S.C. § 48A

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 13201 — Air quality enhancement program

**(a) Eligible projects** Projects supported under [section 13572(a)(2) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section13572/a/2&num=0&edition=prelim) shall— (1) utilize technologies that meet relevant Federal and State clean air requirements applicable to the unit or facility, including being adequately demonstrated for purposes of [section 7411 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7411&num=0&edition=prelim), achievable for purposes of [section 7479 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7479&num=0&edition=prelim), or achievable in practice for purposes of [section 7501 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7501&num=0&edition=prelim); or (2) utilize equipment or processes that exceed relevant Federal or State clean air requirements applicable to the unit or facilities included in the projects by achieving greater efficiency or environmental performance. **(b) Priority in project selection** In making an award under [section 13572(a)(2) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section13572/a/2&num=0&edition=prelim), the Secretary shall give priority to— (1) projects whose installation is likely to result in significant air quality improvements in nonattainment air quality areas or substantially reduce the emission level of criteria pollutants and mercury air emissions; (2) projects for pollution control that result in the mitigation or collection of more than 1 pollutant; and (3) projects designed to allow the use of the waste byproducts or other byproducts of the equipment. **(c) Authorization of appropriations** There a

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 13201

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 13574 — Generation projects

**(a) Eligible projects** Projects supported under [section 13572(a)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section13572/a/1&num=0&edition=prelim) may include— (1) equipment or processes previously supported by a Department of Energy program; (2) advanced combustion equipment and processes that the Secretary determines will be cost-effective and could substantially contribute to meeting environmental or energy needs, including gasification, gasification fuel cells, gasification coproduction, oxidation combustion techniques, ultra-supercritical boilers, and chemical looping; and (3) hybrid gasification/combustion systems, including systems integrating fuel cells with gasification or combustion units. **(b) Criteria** The Secretary shall establish criteria for the selection of generation projects under [section 13572(a)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section13572/a/1&num=0&edition=prelim). The Secretary may modify the criteria as appropriate to reflect improvements in equipment, except that the criteria shall not be modified to be less stringent. The selection criteria shall include— (1) prioritization of projects whose installation is likely to result in significant air quality improvements in nonattainment air quality areas; (2) prioritization of projects whose installation is likely to result in lower emission rates of pollution; (3) prioritization of projects that result in the repowering or replacement of older, less efficient units; (4) documented broad interest in the procurement of the equipment and utilization of the processes used in the projects by owners or operators of facilities for electricity generation; (5) equipment and processes beginning in

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 13574

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 15963 — Project criteria

**(a) In general** To be eligible to receive assistance under this part, a project shall advance efficiency, environmental performance, and cost competitiveness well beyond the level of technologies that are in commercial service or have been demonstrated on a scale that the Secretary determines is sufficient to demonstrate that commercial service is viable as of August 8, 2005. **(b) Technical criteria for clean coal power initiative** (1) **Gasification projects** (A) *In general* — In allocating the funds made available under [section 15961(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section15961/a&num=0&edition=prelim), the Secretary shall ensure that at least 70 percent of the funds are used only to fund projects on coal-based gasification technologies, including— (i) gasification combined cycle; (ii) gasification fuel cells and turbine combined cycle; (iii) gasification coproduction; (iv) hybrid gasification and combustion; and (v) other advanced coal based technologies capable of producing a concentrated stream of carbon dioxide. (B) *Technical milestones* (i) *Periodic determination* (I) *In general* — The Secretary shall periodically set technical milestones specifying the emission and thermal efficiency levels that coal gasification projects under this part shall be designed, and reasonably expected, to achieve. (II) *Prescriptive milestones* — The technical milestones shall become more prescriptive during the period of the clean coal power initiative. (ii) *2020 goals* — The Secretary shall establish the periodic milestones so as to achieve by the year 2020 coal gasification projects able— (I) (aa) to remove at least 99 percent of sulfur dioxide

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 15963

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7511a — Plan submissions and requirements

**(a) Marginal Areas** Each State in which all or part of a Marginal Area is located shall, with respect to the Marginal Area (or portion thereof, to the extent specified in this subsection), submit to the Administrator the State implementation plan revisions (including the plan items) described under this subsection except to the extent the State has made such submissions as of November 15, 1990. (1) **Inventory** — Within 2 years after November 15, 1990, the State shall submit a comprehensive, accurate, current inventory of actual emissions from all sources, as described in [section 7502(c)(3) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7502/c/3&num=0&edition=prelim), in accordance with guidance provided by the Administrator. (2) **Corrections to the State implementation plan** — Within the periods prescribed in this paragraph, the State shall submit a revision to the State implementation plan that meets the following requirements— (A) *Reasonably available control technology corrections* — For any Marginal Area (or, within the Administrator’s discretion, portion thereof) the State shall submit, within 6 months of the date of classification under [section 7511(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7511/a&num=0&edition=prelim), a revision that includes such provisions to correct requirements in (or add requirements to) the plan concerning reasonably available control technology as were required under [section 7502(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7502/b&num=0&edition=prelim) (as in effect immediately before November 15, 1990), as interpreted in guidance issued by the Administrator under [section 7408 of

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7511a

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7479 — Definitions

Page 7269 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 7479 ting of such facility shall be in accordance with the regulations for the prevention of significant deterioration in effect prior to August 7, 1977. (July 14, 1955, ch. 360, title I, § 168, as added Pub. L. 95–95, title I, § 127(a), Aug. 7, 1977, 91 Stat. 740; amended Pub. L. 95–190, § 14(a)(52), Nov. 16, 1977, 91 Stat. 1402.) Editorial Notes AMENDMENTS 1977—Subsec. (b). Pub. L. 95–190 substituted ‘‘(in ac- cordance with the definition of ‘commenced’ in section 7479(2) of this title)’’ for ‘‘in accordance with this definition’’. § 7479. Definitions For purposes of this part— (1) The term ‘‘major emitting facility’’ means any of the following stationary sources of air pollutants which emit, or have the po- tential to emit, one hundred tons per year or more of any air pollutant from the following types of stationary sources: fossil-fuel fired steam electric plants of more than two hun- dred and fifty million British thermal units per hour heat input, coal cleaning plants (thermal dryers), kraft pulp mills, Portland Cement plants, primary zinc smelters, iron and steel mill plants, primary aluminum ore reduction plants, primary copper smelters, municipal incinerators capable of charging more than fifty tons of refuse per day, hydrofluoric, sulfuric, and nitric acid plants, petroleum refineries, lime plants, phosphate rock processing plants, coke oven batteries, sulfur recovery plants, carbon black plants (furnace process), primary lead smelters, fuel conversion plants, sintering plants, secondary metal production facilities, chemical process plants, fossil-fuel boilers of more than two hundred and fifty million British thermal units per hour heat input, petroleum storage and transfer

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 7479

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.