Browse Arkansas Code titles and sections
16 U.S.C. § 832e — Rate schedules
Federal law — U.S. Code and appendices · legal_authorities
Schedules of rates and charges for electric energy produced at the Bonneville project and sold to purchasers as in this chapter provided shall be prepared by the administrator and become effective upon confirmation and approval thereof by the Secretary of Energy; and such rates and charges shall also be applicable to dispositions of electric energy to Federal agencies. Subject to confirmation and approval by the Secretary of Energy, such rate schedules may be modified from time to time by the administrator, and shall be fixed and established with a view to encouraging the widest possible diversified use of electric energy. The said rate schedules may provide for uniform rates or rates uniform throughout prescribed transmission areas in order to extend the benefits of an integrated transmission system and encourage the equitable distribution of the electric energy developed at the Bonneville project.
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 832e
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 0160ddaacdc75b561277daccb632fb4060be0337d0229619514748536f96a3ad. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_77f5d5ad3720e75d9ce07bf2
Source file: Laws/federal/codes/united-states-code/title-16/section-832e-rate-schedules--9b65047154.md
Pages: Not recorded – Not recorded
Passage SHA-256: 3d0e367ea5e770add9ce6145fe00e12c79c414f0c2070b8e73adf4e0ae4614ed
Source location: Title 16, Chapter 12B, § 832e; chapter-12b-bonneville-project.md
Stored source content
Schedules of rates and charges for electric energy produced at the Bonneville project and sold to purchasers as in this chapter provided shall be prepared by the administrator and become effective upon confirmation and approval thereof by the Secretary of Energy; and such rates and charges shall also be applicable to dispositions of electric energy to Federal agencies. Subject to confirmation and approval by the Secretary of Energy, such rate schedules may be modified from time to time by the administrator, and shall be fixed and established with a view to encouraging the widest possible diversified use of electric energy. The said rate schedules may provide for uniform rates or rates uniform throughout prescribed transmission areas in order to extend the benefits of an integrated transmission system and encourage the equitable distribution of the electric energy developed at the Bonneville project.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
A commission is created and established to be known as the Federal Power Commission (hereinafter referred to as the “commission”) which shall be composed of five commissioners who shall be appointed by the President, by and with the advice and consent of the Senate, one of whom shall be designated by the President as chairman and shall be the principal executive officer of the commission. Each chairman, when so designated, shall act as such until the expiration of his term of office.
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 792
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 1482
TITLE 16—CONSERVATION
§ 832e
contain such terms and conditions, including
among other things stipulations concerning re-
sale and resale rates by any such utility, as the
administrator may deem necessary, desirable or
appropriate to effectuate the purposes of this
chapter and to insure that resale by such utility
to the ultimate consumer shall be at rates
which are reasonable and nondiscriminatory.
Such contracts shall also require such utility to
keep on file in the office of the administrator a
schedule of all its rates and charges to the pub-
lic for electric energy and such alterations and
changes therein as may be put into effect by
such utility.
(b) Exchange of excess power
The administrator is authorized to enter into
contracts with public or private power systems
for the mutual exchange of unused excess power
upon suitable exchange terms for the purpose of
economical operation or of providing emergency
or break-down relief.
(Aug. 20, 1937, ch. 720, § 5, 50 Stat. 734; Oct. 23,
1945, ch. 433, § 2, 59 Stat. 546; Pub. L. 95–91, title
III, § 301(b), Aug. 4, 1977, 91 Stat. 578.)
Editorial Notes
AMENDMENTS
1945—Subsec. (a). Act Oct. 23, 1945, inserted ‘‘and for
the disposition of electric energy to Federal agencies’’
in first sentence.
Statutory Notes and Related Subsidiaries
TRANSFER OF FUNCTIONS
‘‘Secretary of Energy’’ substituted for ‘‘Federal
Power Commission’’ in subsec. (a) pursuant to Pub. L.
95–91, § 301(b), which is classified to section 7151(b) of
Title 42, The Public Health and Welfare.
Functions of Secretary of the Interior with respect to
Bonneville Power Administration transferred to Sec-
retary of Energy by section 7152(a)(1)(D), (2) of Title 42,
with Bonneville Power Administration to be preserved
as a distin
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 832e
Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.