**(a)**
(1) 11 So in original. No subsec. (b) has been enacted. The Commission is authorized and directed to make or cause to be made under its direction, a national survey, which shall include consideration of each of the existing or future electric reliability regions, or other appropriate regional areas, to locate and identify possible nuclear energy center sites. This survey shall be conducted in cooperation with other interested Federal, State, and local agencies, and the views of interested persons, including electric utilities, citizens’ groups, and others, shall be solicited and considered.
(2) For purposes of this section, the term “nuclear energy center site” means any site, including a site not restricted to land, large enough to support utility operations or other elements of the total nuclear fuel cycle, or both including, if appropriate, nuclear fuel reprocessing facilities, nuclear fuel fabrication plants, retrievable nuclear waste storage facilities, and unranium 22 So in original. Probably should be “uranium”. enrichment facilities.
(3) The survey shall include— (a) a regional evaluation of natural resources, including land, air, and water resources, available for use in connection with nuclear energy center sites; estimates of future electric power requirements that can be served by each nuclear energy center site; an assessment of the economic impact of each nuclear energy site; and consideration of any other relevant factors, including but not limited to population distribution, proximity to electric load centers and to other elements of the fuel cycle, transmission line rights-of-way, and the availability of other fuel resources; (b) an evaluation of the environmental impact likely to result from construction and operation of such nuclear energy
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 5848
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: b1f334649fd4a9c55af6bd98d456c30b61eaed771b5992ff55de0ec2d6052103. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_73ee0356a8e31286f43cd0c6
Source file: Laws/federal/codes/united-states-code/title-42/section-5848-nuclear-energy-center-site-survey--66afae0cd0.md
Pages: Not recorded – Not recorded
Passage SHA-256: da5a398255825ff52805000a5fff777c8fcfe2061aa51570c586b03766ba6b07
Source location: Title 42, Chapter 73, § 5848; chapter-073-development-of-energy-sources.md
Stored source content
**(a)**
(1) 11 So in original. No subsec. (b) has been enacted. The Commission is authorized and directed to make or cause to be made under its direction, a national survey, which shall include consideration of each of the existing or future electric reliability regions, or other appropriate regional areas, to locate and identify possible nuclear energy center sites. This survey shall be conducted in cooperation with other interested Federal, State, and local agencies, and the views of interested persons, including electric utilities, citizens’ groups, and others, shall be solicited and considered.
(2) For purposes of this section, the term “nuclear energy center site” means any site, including a site not restricted to land, large enough to support utility operations or other elements of the total nuclear fuel cycle, or both including, if appropriate, nuclear fuel reprocessing facilities, nuclear fuel fabrication plants, retrievable nuclear waste storage facilities, and unranium 22 So in original. Probably should be “uranium”. enrichment facilities.
(3) The survey shall include— (a) a regional evaluation of natural resources, including land, air, and water resources, available for use in connection with nuclear energy center sites; estimates of future electric power requirements that can be served by each nuclear energy center site; an assessment of the economic impact of each nuclear energy site; and consideration of any other relevant factors, including but not limited to population distribution, proximity to electric load centers and to other elements of the fuel cycle, transmission line rights-of-way, and the availability of other fuel resources; (b) an evaluation of the environmental impact likely to result from construction and operation of such nuclear energy centers, including an evaluation whether such nuclear energy centers will result in greater or lesser environmental impact than separate siting of the reactors and/or fuel cycle facilities; and (c) consideration of the use of federally owned property and other property designated for public use, but excluding national parks, national forests, national wilderness areas, and national historic monuments.
(4) A report of the results of the survey shall be published and transmitted to the Congress and the Council on Environmental Quality not later than one year from October 11, 1974, and shall be made available to the public, and shall be updated from time to time thereafter as the Commission, in its discretion, deems advisable. The report shall include the Commission’s evaluation of the results of the survey and any conclusions and recommendations, including recommendations for legislation, which the Commission may have concerning the feasibility and practicality of locating nuclear power reactors and/or other elements of the nuclear fuel cycle on nuclear energy center sites. The Commission is authorized to adopt policies which will encourage the location of nuclear power reactors and related fuel cycle facilities on nuclear energy center sites insofar as practicable.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) General requirements; applicability to appropriations** All appropriations made to the Energy Research and Development Administration or the Administrator shall, except as otherwise provided by law, be subject to annual authorization in accordance with [section 2017 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section2017&num=0&edition=prelim), [section 5915 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section5915&num=0&edition=prelim), and [section 5875 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section5875&num=0&edition=prelim). The provisions of this section shall apply with respect to appropriations made pursuant to the Act providing such authorization (hereinafter in this section referred to as “annual authorization Acts”).
**(b) Requirements and limitations respecting funds appropriated for operating expenses**
(1) Funds appropriated pursuant to an annual authorization Act for “Operating expenses” may be used for—
(A) the construction or acquisition of any facilities, or major items of equipment, which may be required at locations other than installations of the Administration, for the performance of research, development, and demonstration activities, and
(B) grants to any organization for purchase or construction of research facilities.
No such funds shall be used under this subsection for the acquisition of land. Fee title to all such facilities and items of equipment shall be vested in the United States, unless the Administrator or his designee determines in writing that the research, development, and demonstration authorized by such Act would best be implemented by permitting fee title or any other property interest to be vest
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 5841
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Composition; Chairman; Acting Chairman; quorum; official spokesman; seal; functions of Chairman and Commission**
(1) There is established an independent regulatory commission to be known as the Nuclear Regulatory Commission which shall be composed of five members, each of whom shall be a citizen of the United States. The President shall designate one member of the Commission as Chairman thereof to serve as such during the pleasure of the President. The Chairman may from time to time designate any other member of the Commission as Acting Chairman to act in the place and stead of the Chairman during his absence. The Chairman (or the Acting Chairman in the absence of the Chairman) shall preside at all meetings of the Commission and a quorum for the transaction of business shall consist of at least three members present. Each member of the Commission, including the Chairman, shall have equal responsibility and authority in all decisions and actions of the Commission, shall have full access to all information relating to the performance of his duties or responsibilities, and shall have one vote. Action of the Commission shall be determined by a majority vote of the members present. The Chairman (or Acting Chairman in the absence of the Chairman) shall be the official spokesman of the Commission in its relations with the Congress, Government agencies, persons, or the public, and, on behalf of the Commission, shall see to the faithful execution of the policies and decisions of the Commission, and shall report thereon to the Commission from time to time or as the Commission may direct. The Commission shall have an official seal which shall be judicially noticed.
(2) The Chairman of the Commission shall be the principal executive officer of the Commission, and he shall e
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 5842
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 6614
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 5847
1 So in original. No subsec. (b) has been enacted.
2 So in original. Probably should be ‘‘uranium’’.
(d) Inspection and enforcement
The Commission is authorized to conduct such
reasonable inspections and other enforcement
activities as needed to insure compliance with
the provisions of this section.
(Pub. L. 93–438, title II, § 206, Oct. 11, 1974, 88
Stat. 1246.)
Editorial Notes
REFERENCES IN TEXT
The Atomic Energy Act of 1954, referred to in subsecs.
(a) and (c), is act Aug. 1, 1946, ch. 724, as added by act
Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 919, which is classified
principally to chapter 23 (§ 2011 et seq.) of this title. For
complete classification of this Act to the Code, see
Short Title note set out under section 2011 of this title
and Tables.
This chapter, referred to in subsec. (a), was in the
original ‘‘this Act’’, meaning Pub. L. 93–438, Oct. 11,
1974, 88 Stat. 1233, known as the Energy Reorganization
Act of 1974, which is classified principally to this chap-
ter. For complete classification of this Act to the Code,
see Short Title note set out under section 5801 of this
title and Tables.
Executive Documents
TRANSFER OF FUNCTIONS
For transfer of certain functions from Nuclear Regu-
latory Commission to Chairman thereof, see Reorg.
Plan No. 1 of 1980, 45 F.R. 40561, 94 Stat. 3585, set out as
a note under section 5841 of this title.
§ 5847. Nuclear energy center site survey
(a)(1) 1 The Commission is authorized and di-
rected to make or cause to be made under its di-
rection, a national survey, which shall include
consideration of each of the existing or future
electric reliability regions, or other appropriate
regional areas, to locate and identify possible
nuclear energ
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 5848