Browse Arkansas Code titles and sections
40 U.S.C. § 1102 — Definitions
Federal law — U.S. Code and appendices · legal_authorities
In this chapter, the following definitions apply:
(1) **Agency head.—** — The term “agency head” means the head of a department, agency, or bureau of the Federal Government.
(2) **Architectural and engineering services.—** — The term “architectural and engineering services” means—
(A) professional services of an architectural or engineering nature, as defined by state law, if applicable, that are required to be performed or approved by a person licensed, registered, or certified to provide the services described in this paragraph;
(B) professional services of an architectural or engineering nature performed by contract that are associated with research, planning, development, design, construction, alteration, or repair of real property; and
(C) other professional services of an architectural or engineering nature, or incidental services, which members of the architectural and engineering professions (and individuals in their employ) may logically or justifiably perform, including studies, investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services, soils engineering, drawing reviews, preparation of operating and maintenance manuals, and other related services.
(3) **Firm.—** — The term “firm” means an individual, firm, partnership, corporation, association, or other legal entity permitted by law to practice the profession of architecture or engineering.
Source: Supplied U.S. Code snapshot — release unconfirmed · 40 U.S.C. § 1102
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: a97e2ad834d6ea3912cebb107be32aa14fa9cf255b219db1a600dcd0f433e955. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_69fee21963c3c44e37de0b36
Source file: Laws/federal/codes/united-states-code/title-40/section-1102-definitions--fa268436cc.md
Pages: Not recorded – Not recorded
Passage SHA-256: e0a0979d08e3d25b2294fd7919381ed99a499b79056c3c60b9d4c20bb4f8d6f0
Source location: Title 40, Chapter 11, § 1102; chapter-011-selection-of-architects-and-engineers.md
Stored source content
In this chapter, the following definitions apply:
(1) **Agency head.—** — The term “agency head” means the head of a department, agency, or bureau of the Federal Government.
(2) **Architectural and engineering services.—** — The term “architectural and engineering services” means—
(A) professional services of an architectural or engineering nature, as defined by state law, if applicable, that are required to be performed or approved by a person licensed, registered, or certified to provide the services described in this paragraph;
(B) professional services of an architectural or engineering nature performed by contract that are associated with research, planning, development, design, construction, alteration, or repair of real property; and
(C) other professional services of an architectural or engineering nature, or incidental services, which members of the architectural and engineering professions (and individuals in their employ) may logically or justifiably perform, including studies, investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services, soils engineering, drawing reviews, preparation of operating and maintenance manuals, and other related services.
(3) **Firm.—** — The term “firm” means an individual, firm, partnership, corporation, association, or other legal entity permitted by law to practice the profession of architecture or engineering.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a)** On or after the first Monday in January but not later than the first Monday in February of each year, the President shall submit a budget of the United States Government for the following fiscal year. Each budget shall include a budget message and summary and supporting information. The President shall include in each budget the following:
(1) information on activities and functions of the Government.
(2) when practicable, information on costs and achievements of Government programs.
(3) other desirable classifications of information.
(4) a reconciliation of the summary information on expenditures with proposed appropriations.
(5) except as provided in subsection (b) of this section, estimated expenditures and proposed appropriations the President decides are necessary to support the Government in the fiscal year for which the budget is submitted and the 4 fiscal years after that year.
(6) estimated receipts of the Government in the fiscal year for which the budget is submitted and the 4 fiscal years after that year under—
(A) laws in effect when the budget is submitted; and
(B) proposals in the budget to increase revenues.
(7) appropriations, expenditures, and receipts of the Government in the prior fiscal year.
(8) estimated expenditures and receipts, and appropriations and proposed appropriations, of the Government for the current fiscal year.
(9) balanced statements of the—
(A) condition of the Treasury at the end of the prior fiscal year;
(B) estimated condition of the Treasury at the end of the current fiscal year; and
(C) estimated condition of the Treasury at the end of the fiscal year for which the budget is submitted if financial proposals in the budget are adopted.
(10) essential information about the debt of the Government.
Source: Supplied U.S. Code snapshot — release unconfirmed · 31 U.S.C. § 1105
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) In General.—** These procedures apply to the procurement of architectural and engineering services by an agency head.
**(b) Annual Statements.—** The agency head shall encourage firms to submit annually a statement of qualifications and performance data.
**(c) Evaluation.—** For each proposed project, the agency head shall evaluate current statements of qualifications and performance data on file with the agency, together with statements submitted by other firms regarding the proposed project. The agency head shall conduct discussions with at least 3 firms to consider anticipated concepts and compare alternative methods for furnishing services.
**(d) Selection.—** From the firms with which discussions have been conducted, the agency head shall select, in order of preference, at least 3 firms that the agency head considers most highly qualified to provide the services required. Selection shall be based on criteria established and published by the agency head.
Source: Supplied U.S. Code snapshot — release unconfirmed · 40 U.S.C. § 1103
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Authorization.—** Unless the traditional acquisition approach of design-bid-build established under sections 1101 to 1104 of title 40 or another acquisition procedure authorized by law is used, the head of an executive agency shall use the two-phase selection procedures authorized in this section for entering into a contract for the design and construction of a public building, facility, or work when a determination is made under subsection (b) that the procedures are appropriate for use.
**(b) Criteria for Use.—** A contracting officer shall make a determination whether two-phase selection procedures are appropriate for use for entering into a contract for the design and construction of a public building, facility, or work when—
(1) the contracting officer anticipates that 3 or more offers will be received for the contract;
(2) design work must be performed before an offeror can develop a price or cost proposal for the contract;
(3) the offeror will incur a substantial amount of expense in preparing the offer; and
(4) the contracting officer has considered information such as the following:
(A) The extent to which the project requirements have been adequately defined.
(B) The time constraints for delivery of the project.
(C) The capability and experience of potential contractors.
(D) The suitability of the project for use of the two-phase selection procedures.
(E) The capability of the agency to manage the two-phase selection process.
(F) Other criteria established by the agency.
**(c) Procedures Described.—** Two-phase selection procedures consist of the following:
(1) **Development of scope of work statement.—** — The agency develops, either in-house or by contract, a scope of work statement for inclusion in the solicitation that define
Source: Supplied U.S. Code snapshot — release unconfirmed · 41 U.S.C. § 3309
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 92
TITLE 40—PUBLIC BUILDINGS, PROPERTY, AND WORKS
§ 904
§ 904. Disposal
(a) NOTICE TO LOCAL GOVERNMENT.—Before of-
fering real property situated in an urban area
for sale, the Administrator of General Services
shall give reasonable notice to the unit of gen-
eral local government exercising zoning and
land use jurisdiction in order to provide an op-
portunity for zoning so that the property is used
in accordance with local comprehensive plan-
ning described in subsection (c).
(b) NOTICE
TO PROSPECTIVE PURCHASERS.—To
the greatest extent practicable, the Adminis-
trator shall furnish to all prospective purchasers
of real property situated in an urban area com-
plete information concerning—
(1) current zoning regulations, prospective
zoning requirements, and objectives for prop-
erty if it is unzoned; and
(2)(A) the current availability of streets,
sidewalks, sewers, water, street lights, and
other service facilities; and
(B) the prospective availability of those
service facilities if the property is included in
local comprehensive planning described in
subsection (c).
(c) LOCAL
COMPREHENSIVE
PLANNING.—Local
comprehensive planning referred to in sub-
sections (a) and (b) includes any of the following
activities, to the extent the activity is directly
related to the needs of a unit of general local
government:
(1) As a guide for government policy and ac-
tion, preparing general plans related to—
(A) the pattern and intensity of land use;
(B) the provision of public facilities (in-
cluding transportation facilities) and other
government services; and
(C) the effective development and use of
human and natural resources.
(2) Preparing long-range physical and fiscal
plans for government action.
(3) Programming capital improvements and
other majo
Source: Supplied 2024 U.S. Code historical extraction · 40 U.S.C. § 1102
Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.