Arkansas Legal Resource Navigator

33 U.S.C. § 1274 — Watershed pilot projects

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 1274 — Watershed pilot projects

**(a) In general** The Administrator, in coordination with the States, may provide technical assistance and grants to a municipality or municipal entity to carry out pilot projects relating to the following areas: (1) **Watershed management of wet weather discharges** — The management of municipal combined sewer overflows, sanitary sewer overflows, and stormwater discharges, on an integrated watershed or subwatershed basis for the purpose of demonstrating the effectiveness of a unified wet weather approach. (2) **Stormwater best management practices** — The control of pollutants from municipal separate storm sewer systems for the purpose of demonstrating and determining controls that are cost-effective and that use innovative technologies to manage, reduce, treat, recapture, or reuse municipal stormwater, including techniques that utilize infiltration, evapotranspiration, and reuse of stormwater onsite. (3) **Watershed partnerships** — Efforts of municipalities and property owners to demonstrate cooperative ways to address nonpoint sources of pollution to reduce adverse impacts on water quality. (4) **Integrated water resource plan** — The development of an integrated water resource plan for the coordinated management and protection of surface water, ground water, and stormwater resources on a watershed or subwatershed basis to meet the objectives, goals, and policies of this chapter. (5) **Municipality-wide stormwater management planning** — The development of a municipality-wide plan that identifies the most effective placement of stormwater technologies and management approaches, to reduce water quality impairments from stormwater on a municipality-wide basis. (6) **Increased resilience of treatment works** — Efforts to assess future risks and vulnerabilities o

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 1274

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 7ed7523330c237e0a9522b625dc00d2bf151047c41acd7b5b8e6abe40f1976ab. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_5e849864cbe15e5e57d3b512
Source file: Laws/federal/codes/united-states-code/title-33/section-1274-watershed-pilot-projects--5758593cc3.md
Pages: Not recorded – Not recorded
Passage SHA-256: a049b5ed769cb6b72e0bbd608558dd9b5089caba2abeb0d25b4c4d03301e0679

Source location: Title 33, Chapter 26, § 1274; chapter-026-water-pollution-prevention-and-control.md

Stored source content

**(a) In general** The Administrator, in coordination with the States, may provide technical assistance and grants to a municipality or municipal entity to carry out pilot projects relating to the following areas: (1) **Watershed management of wet weather discharges** — The management of municipal combined sewer overflows, sanitary sewer overflows, and stormwater discharges, on an integrated watershed or subwatershed basis for the purpose of demonstrating the effectiveness of a unified wet weather approach. (2) **Stormwater best management practices** — The control of pollutants from municipal separate storm sewer systems for the purpose of demonstrating and determining controls that are cost-effective and that use innovative technologies to manage, reduce, treat, recapture, or reuse municipal stormwater, including techniques that utilize infiltration, evapotranspiration, and reuse of stormwater onsite. (3) **Watershed partnerships** — Efforts of municipalities and property owners to demonstrate cooperative ways to address nonpoint sources of pollution to reduce adverse impacts on water quality. (4) **Integrated water resource plan** — The development of an integrated water resource plan for the coordinated management and protection of surface water, ground water, and stormwater resources on a watershed or subwatershed basis to meet the objectives, goals, and policies of this chapter. (5) **Municipality-wide stormwater management planning** — The development of a municipality-wide plan that identifies the most effective placement of stormwater technologies and management approaches, to reduce water quality impairments from stormwater on a municipality-wide basis. (6) **Increased resilience of treatment works** — Efforts to assess future risks and vulnerabilities of publicly owned treatment works to manmade or natural disasters, including extreme weather events and sea-level rise, and to carry out measures, on a systemwide or area-wide basis, to increase the resiliency of publicly owned treatment works. **(b) Administration** The Administrator, in coordination with the States, shall provide municipalities participating in a pilot project under this section the ability to engage in innovative practices, including the ability to unify separate wet weather control efforts under a single permit. **(c) Report to Congress** Not later than October 1, 2015, the Administrator shall transmit to Congress a report on the results of the pilot projects conducted under this section and their possible application nationwide.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 1273 — Lake Pontchartrain Basin

**(a) Establishment of restoration program** The Administrator shall establish within the Environmental Protection Agency the Lake Pontchartrain Basin Restoration Program. **(b) Purpose** The purpose of the program shall be to restore the ecological health of the Basin by developing and funding restoration projects and related scientific and public education projects. **(c) Duties** In carrying out the program, the Administrator shall— (1) provide administrative and technical assistance to a management conference convened for the Basin under [section 1330 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1330&num=0&edition=prelim); (2) assist and support the activities of the management conference, including the implementation of recommendations of the management conference; (3) support environmental monitoring of the Basin and research to provide necessary technical and scientific information; (4) develop a comprehensive research plan to address the technical needs of the program; (5) coordinate the grant, research, and planning programs authorized under this section; (6) collect and make available to the public publications, and other forms of information the management conference determines to be appropriate, relating to the environmental quality of the Basin; and (7) ensure that the comprehensive conservation and management plan approved for the Basin under [section 1330 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1330&num=0&edition=prelim) is reviewed and revised in accordance with [section 1330 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1330&num=0&edition=prelim) not less often than once every 5 years, beginning on Decemb

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 1273

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 1383 — Water pollution control revolving loan funds

**(a) Requirements for obligation of grant funds** Before a State may receive a capitalization grant with funds made available under this subchapter and [section 1285(m) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1285/m&num=0&edition=prelim), the State shall first establish a water pollution control revolving fund which complies with the requirements of this section. **(b) Administration** Each State water pollution control revolving fund shall be administered by an instrumentality of the State with such powers and limitations as may be required to operate such fund in accordance with the requirements and objectives of this chapter. **(c) Projects and activities eligible for assistance** The amounts of funds available to each State water pollution control revolving fund shall be used only for providing financial assistance— (1) to any municipality or intermunicipal, interstate, or State agency for construction of publicly owned treatment works (as defined in [section 1292 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1292&num=0&edition=prelim)); (2) for the implementation of a management program established under [section 1329 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1329&num=0&edition=prelim); (3) for development and implementation of a conservation and management plan under [section 1330 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1330&num=0&edition=prelim); (4) for the construction, repair, or replacement of decentralized wastewater treatment systems that treat municipal wastewater or domestic sewage; (5) for measures to manage, reduce, treat, or recapture stormwater or sub

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 1383

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 1274 — Watershed pilot projects

Page 402 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 1274 Editorial Notes PRIOR PROVISIONS Another section 121 of act June 30, 1948, was renum- bered section 122 and is classified to section 1274 of this title. AMENDMENTS 2022—Subsec. (c)(7). Pub. L. 117–263, § 8501(c)(1)(A), added par. (7). Subsec. (d)(1). Pub. L. 117–263, § 8501(c)(1)(B), sub- stituted ‘‘identified in the comprehensive conservation and management plan approved for the Basin under section 1330 of this title’’ for ‘‘recommended by a man- agement conference convened for the Basin under sec- tion 1330 of this title’’. Subsec. (e)(1). Pub. L. 117–263, § 8501(c)(2), substituted ‘‘10,000 square mile’’ for ‘‘5,000 square mile’’. Subsec. (f)(3). Pub. L. 117–263, § 8501(c)(3), added par (3). 2012—Subsec. (d). Pub. L. 112–237, § 1(1), inserted ‘‘to pay not more than 75 percent of the costs’’ after ‘‘make grants’’ in introductory provisions. Subsec. (f)(1). Pub. L. 112–237, § 1(2), substituted ‘‘2012 and the amount appropriated for fiscal year 2009 for each of fiscal years 2013 through 2017’’ for ‘‘2011’’. 2006—Subsec. (f)(1). Pub. L. 109–392 substituted ‘‘2011’’ for ‘‘2005’’. Statutory Notes and Related Subsidiaries MANAGEMENT CONFERENCE Pub. L. 110–114, title V, § 5084, Nov. 8, 2007, 121 Stat. 1228, provided that: ‘‘For purposes of carrying out sec- tion 121 of the Federal Water Pollution Control Act (33 U.S.C. 1273), the Lake Pontchartrain, Louisiana, basin stakeholders conference convened by the Environ- mental Protection Agency, National Oceanic and At- mospheric Administration, and United States Geologi- cal Survey on February 25, 2002, shall be treated as being a management conference convened under sec- tion 320 of such Act (33 U.S.C. 1330).’’ § 1274. Watershed pilot projects (a

Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 1274

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.