Arkansas Legal Resource Navigator

16 U.S.C. § 824b — Disposition of property; consolidations; purchase of securities

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 824b — Disposition of property; consolidations; purchase of securities

**(a) Authorization** (1) No public utility shall, without first having secured an order of the Commission authorizing it to do so— (A) sell, lease, or otherwise dispose of the whole of its facilities subject to the jurisdiction of the Commission, or any part thereof of a value in excess of $10,000,000; (B) merge or consolidate, directly or indirectly, its facilities subject to the jurisdiction of the Commission, or any part thereof, with the facilities of any other person, or any part thereof, that are subject to the jurisdiction of the Commission and have a value in excess of $10,000,000, by any means whatsoever; (C) purchase, acquire, or take any security with a value in excess of $10,000,000 of any other public utility; or (D) purchase, lease, or otherwise acquire an existing generation facility— (i) that has a value in excess of $10,000,000; and (ii) that is used for interstate wholesale sales and over which the Commission has jurisdiction for ratemaking purposes. (2) No holding company in a holding company system that includes a transmitting utility or an electric utility shall purchase, acquire, or take any security with a value in excess of $10,000,000 of, or, by any means whatsoever, directly or indirectly, merge or consolidate with, a transmitting utility, an electric utility company, or a holding company in a holding company system that includes a transmitting utility, or an electric utility company, with a value in excess of $10,000,000 without first having secured an order of the Commission authorizing it to do so. (3) Upon receipt of an application for such approval the Commission shall give reasonable notice in writing to the Governor and State commission of each of the States in which the physical property affected, or any part t

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824b

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 9700db0e07f580b7db82c4ab34d82bbe62459aa12f05bd83cda634556fcf5edd. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_4dc377662a90baca0bcf3645
Source file: Laws/federal/codes/united-states-code/title-16/section-824b-disposition-of-property-consolidations-purchase-of-securities--0502a9802a.md
Pages: Not recorded – Not recorded
Passage SHA-256: a398cc8191c4c45a667e0e9ac07dc0d6454a4fc69f00311a842292cb931871f9

Source location: Title 16, Chapter 12, § 824b; chapter-012-federal-regulation-and-development-of-power.md

Stored source content

**(a) Authorization** (1) No public utility shall, without first having secured an order of the Commission authorizing it to do so— (A) sell, lease, or otherwise dispose of the whole of its facilities subject to the jurisdiction of the Commission, or any part thereof of a value in excess of $10,000,000; (B) merge or consolidate, directly or indirectly, its facilities subject to the jurisdiction of the Commission, or any part thereof, with the facilities of any other person, or any part thereof, that are subject to the jurisdiction of the Commission and have a value in excess of $10,000,000, by any means whatsoever; (C) purchase, acquire, or take any security with a value in excess of $10,000,000 of any other public utility; or (D) purchase, lease, or otherwise acquire an existing generation facility— (i) that has a value in excess of $10,000,000; and (ii) that is used for interstate wholesale sales and over which the Commission has jurisdiction for ratemaking purposes. (2) No holding company in a holding company system that includes a transmitting utility or an electric utility shall purchase, acquire, or take any security with a value in excess of $10,000,000 of, or, by any means whatsoever, directly or indirectly, merge or consolidate with, a transmitting utility, an electric utility company, or a holding company in a holding company system that includes a transmitting utility, or an electric utility company, with a value in excess of $10,000,000 without first having secured an order of the Commission authorizing it to do so. (3) Upon receipt of an application for such approval the Commission shall give reasonable notice in writing to the Governor and State commission of each of the States in which the physical property affected, or any part thereof, is situated, and to such other persons as it may deem advisable. (4) After notice and opportunity for hearing, the Commission shall approve the proposed disposition, consolidation, acquisition, or change in control, if it finds that the proposed transaction will be consistent with the public interest, and will not result in cross-subsidization of a non-utility associate company or the pledge or encumbrance of utility assets for the benefit of an associate company, unless the Commission determines that the cross-subsidization, pledge, or encumbrance will be consistent with the public interest. (5) The Commission shall, by rule, adopt procedures for the expeditious consideration of applications for the approval of dispositions, consolidations, or acquisitions, under this section. Such rules shall identify classes of transactions, or specify criteria for transactions, that normally meet the standards established in paragraph (4). The Commission shall provide expedited review for such transactions. The Commission shall grant or deny any other application for approval of a transaction not later than 180 days after the application is filed. If the Commission does not act within 180 days, such application shall be deemed granted unless the Commission finds, based on good cause, that further consideration is required to determine whether the proposed transaction meets the standards of paragraph (4) and issues an order tolling the time for acting on the application for not more than 180 days, at the end of which additional period the Commission shall grant or deny the application. (6) For purposes of this subsection, the terms “associate company”, “holding company”, and “holding company system” have the meaning given those terms in the Public Utility Holding Company Act of 2005 [[42 U.S.C. 16451](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section16451&num=0&edition=prelim) et seq.]. (7) (A) Not later than 180 days after September 28, 2018, the Commission shall promulgate a rule requiring any public utility that is seeking to merge or consolidate, directly or indirectly, its facilities subject to the jurisdiction of the Commission, or any part thereof, with those of any other person, to notify the Commission of such transaction not later than 30 days after the date on which the transaction is consummated if— (i) the facilities, or any part thereof, to be acquired are of a value in excess of $1,000,000; and (ii) such public utility is not required to secure an order of the Commission under paragraph (1)(B). (B) In establishing any notification requirement under subparagraph (A), the Commission shall, to the maximum extent practicable, minimize the paperwork burden resulting from the collection of information. **(b) Orders of Commission** The Commission may grant any application for an order under this section in whole or in part and upon such terms and conditions as it finds necessary or appropriate to secure the maintenance of adequate service and the coordination in the public interest of facilities subject to the jurisdiction of the Commission. The Commission may from time to time for good cause shown make such orders supplemental to any order made under this section as it may find necessary or appropriate.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 16451 — Funding new interconnection and transmission upgrades

The Commission may approve a participant funding plan that allocates costs related to transmission upgrades or new generator interconnection, without regard to whether an applicant is a member of a Commission-approved Transmission Organization, if the plan results in rates that— (1) are just and reasonable; (2) are not unduly discriminatory or preferential; and (3) are otherwise consistent with sections 824d and 824e of title 16.

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 16451

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 15801 — National Laboratory Jobs ACCESS Program

**(a) In general** On or after the date that is 180 days after December 20, 2019, the Secretary may establish a program, to be known as the “Department of Energy National Lab Jobs ACCESS Program”, under which the Secretary may award, on a competitive basis, 5-year grants to eligible entities described in subsection (c) for the Federal share of the costs of pre-apprenticeship programs and apprenticeship programs described in subsection (b). **(b) Pre-apprenticeship and apprenticeship programs described** A pre-apprenticeship program or apprenticeship program described in this subsection is a pre-apprenticeship program or apprenticeship program that— (1) leads to recognized postsecondary credentials for secondary school and postsecondary students; (2) is focused on skills and qualifications needed, as determined by the Secretary in consultation with the directors of the National Laboratories, to meet the immediate and ongoing needs of traditional and emerging technician positions (including machinists and cybersecurity technicians) at the National Laboratories and covered facilities of the National Nuclear Security Administration; (3) is established in consultation with a National Laboratory or covered facility of the National Nuclear Security Administration; (4) is registered with and approved by the Secretary of Labor or a State apprenticeship agency; and (5) ensures that participants in the pre-apprenticeship program or apprenticeship program do not displace paid employees. **(c) Eligible entities described** An eligible entity described in this subsection is a workforce intermediary or an eligible sponsor of a pre-apprenticeship program or apprenticeship program that— (1) demonstrates experience in implementing and providing career planning and career pathways

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 15801

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

26 U.S.C. § 451 — General rule for taxable year of inclusion

**(a) General rule** The amount of any item of gross income shall be included in the gross income for the taxable year in which received by the taxpayer, unless, under the method of accounting used in computing taxable income, such amount is to be properly accounted for as of a different period. **(b) Inclusion not later than for financial accounting purposes** (1) **Income taken into account in financial statement** (A) *In general* — In the case of a taxpayer the taxable income of which is computed under an accrual method of accounting, the all events test with respect to any item of gross income (or portion thereof) shall not be treated as met any later than when such item (or portion thereof) is taken into account as revenue in— (i) an applicable financial statement of the taxpayer, or (ii) such other financial statement as the Secretary may specify for purposes of this subsection. (B) *Exception* — This paragraph shall not apply to— (i) a taxpayer which does not have a financial statement described in clause (i) or (ii) of subparagraph (A) for a taxable year, or (ii) any item of gross income in connection with a mortgage servicing contract. (C) *All events test* — For purposes of this section, the all events test is met with respect to any item of gross income if all the events have occurred which fix the right to receive such income and the amount of such income can be determined with reasonable accuracy. (2) **Coordination with special methods of accounting** — Paragraph (1) shall not apply with respect to any item of gross income for which the taxpayer uses a special method of accounting provided under any other provision of this chapter, other than any provision of part V of subchapter P (except as provided in clause (ii) of para

Source: Supplied U.S. Code snapshot — release unconfirmed · 26 U.S.C. § 451

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 824b — Disposition of property; consolidations;

Page 1410 TITLE 16—CONSERVATION § 824b 2 So in original. Probably should be ‘‘rights-of-way’’. applicable execution order respecting the con- struction, operation, maintenance, or connec- tion at the borders of the United States of facili- ties for the transmission of electric energy be- tween the United States and a foreign country. Any finding of the Commission under an appli- cable executive order referred to in this sub- section shall be treated for purposes of judicial review as an order issued under section 202(e) of the Federal Power Act. (c) Timely acquisition by other means The Secretary may not acquire any rights-of- day 2 under this section unless he determines that the holder or holders of a permit referred to in subsection (a)(1)(B) are unable to acquire such rights-of-way under State condemnation author- ity, or after reasonable opportunity for negotia- tion, without unreasonably delaying construc- tion, taking into consideration the impact of such delay on completion of the facilities in a timely fashion. (d) Payments by permittees (1) The property interest acquired by the Sec- retary under this section (whether by eminent domain or other purchase) shall be transferred by the Secretary to the holder of a permit re- ferred to in subsection (b) if such holder has made payment to the Secretary of the entire costs of the acquisition of such property inter- est, including administrative costs. The Sec- retary may accept, and expend, for purposes of such acquisition, amounts from any such person before acquiring a property interest to be trans- ferred to such person under this section. (2) If no payment is made by a permit holder under paragraph (1), within a reasonable time, the Secretary shall offer such rights-of-way to the original o

Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 824b

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 16451 — Definitions

Page 8900 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 16432 Federal utility participating in a Transmission Organization shall confer on the Commission ju- risdiction or authority over— (1) the electric generation assets, electric ca- pacity, or energy of the Federal utility that the Federal utility is authorized by law to market; or (2) the power sales activities of the Federal utility. (e) Existing statutory and other obligations (1) System operation requirements No statutory provision requiring or author- izing a Federal utility to transmit electric power or to construct, operate, or maintain the transmission system of the Federal utility prohibits a transfer of control and use of the transmission system pursuant to, and subject to, the requirements of this section. (2) Other obligations This subsection does not— (A) suspend, or exempt any Federal utility from, any provision of Federal law in effect on August 8, 2005, including any requirement or direction relating to the use of the trans- mission system of the Federal utility, envi- ronmental protection, fish and wildlife pro- tection, flood control, navigation, water de- livery, or recreation; or (B) authorize abrogation of any contract or treaty obligation. (Pub. L. 109–58, title XII, § 1232, Aug. 8, 2005, 119 Stat. 956.) Editorial Notes CODIFICATION Section is comprised of section 1232 of Pub. L. 109–58. Subsec. (e)(3) of section 1232 of Pub. L. 109–58 repealed section 824n of Title 16, Conservation. § 16432. Study on the benefits of economic dis- patch (a) Study The Secretary, in coordination and consulta- tion with the States, shall conduct a study on— (1) the procedures currently used by electric utilities to perform economic dispatch; (2) identifying possible revisions to those pr

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 16451

Stored review status: historical_2024_not_currentness_verified. The source passage cites 42 U.S.C. § 16451. This identifies an authority to review, not proof of applicability.