10 U.S.C. § 6284 — Notification of cost overruns for certain Department of Energy projects

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 6284 — Notification of cost overruns for certain Department of Energy projects

**(a) Establishment of Cost and Schedule Baselines.—** (1) (A) The Administrator shall establish a cost and schedule baseline for each nuclear stockpile life extension or new nuclear weapon program project of the Administration prior to entry into Phase 6.4 or Phase 4, as appropriate. In addition to the requirement under subparagraph (B), the cost and schedule baseline of a nuclear stockpile life extension or new nuclear weapon program project established under this subparagraph shall be the cost and schedule as described in the first Selected Acquisition Report submitted under section 6125(a) for the project. (B) The cost baseline developed under subparagraph (A) shall include, with respect to each stockpile life extension or new nuclear weapon program project, an estimated cost for each warhead in the project. (C) Not later than 30 days after establishing a cost and schedule baseline under subparagraph (A), the Administrator shall submit the cost and schedule baseline to the congressional defense committees. (2) (A) The Administrator shall establish a cost and schedule baseline for each major alteration project prior to entry into Phase 6.4. (B) The cost baseline developed under subparagraph (A) shall include, with respect to each major alteration project, an estimated cost for each warhead in the project. (C) Not later than 30 days after establishing a cost and schedule baseline under subparagraph (A), the Administrator shall submit the cost and schedule baseline to the congressional defense committees. (D) In this paragraph, the term "major alteration project" means a nuclear weapon system alteration project of the Administration the cost of which exceeds $800,000,000. (3) (A) The Secretary of Energy shall establish a cost and sc

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 6284

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 19baeca9ce08a1c0813b37817551fc4beba7239698212eeeda990d398977d156. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_4b05033d0fbd3decdde65cea
Source file: Laws/federal/codes/united-states-code/title-10/section-6284-notification-of-cost-overruns-for-certain-department-of-energy-projects--e79ce9aafd.md
Pages: Not recorded – Not recorded
Passage SHA-256: 53f087c06122389de5a8737df2a9530a0f5caf7b2bf14e5e061d3ea48a5de809

Source location: Title 10, Chapter 607, § 6284; chapter-607-budget-and-financial-management-matters.md

Stored source content

**(a) Establishment of Cost and Schedule Baselines.—** (1) (A) The Administrator shall establish a cost and schedule baseline for each nuclear stockpile life extension or new nuclear weapon program project of the Administration prior to entry into Phase 6.4 or Phase 4, as appropriate. In addition to the requirement under subparagraph (B), the cost and schedule baseline of a nuclear stockpile life extension or new nuclear weapon program project established under this subparagraph shall be the cost and schedule as described in the first Selected Acquisition Report submitted under section 6125(a) for the project. (B) The cost baseline developed under subparagraph (A) shall include, with respect to each stockpile life extension or new nuclear weapon program project, an estimated cost for each warhead in the project. (C) Not later than 30 days after establishing a cost and schedule baseline under subparagraph (A), the Administrator shall submit the cost and schedule baseline to the congressional defense committees. (2) (A) The Administrator shall establish a cost and schedule baseline for each major alteration project prior to entry into Phase 6.4. (B) The cost baseline developed under subparagraph (A) shall include, with respect to each major alteration project, an estimated cost for each warhead in the project. (C) Not later than 30 days after establishing a cost and schedule baseline under subparagraph (A), the Administrator shall submit the cost and schedule baseline to the congressional defense committees. (D) In this paragraph, the term "major alteration project" means a nuclear weapon system alteration project of the Administration the cost of which exceeds $800,000,000. (3) (A) The Secretary of Energy shall establish a cost and schedule baseline under the project management protocols of the Department of Energy for each construction project that is— (i) in excess of $65,000,000; and (ii) carried out by the Department using funds authorized to be appropriated for a fiscal year pursuant to a DOE national security authorization. (B) Not later than 30 days after establishing a cost and schedule baseline under subparagraph (A), the Secretary shall submit the cost and schedule baseline to the congressional defense committees. (4) (A) The Secretary shall establish a cost and schedule baseline under the project management protocols of the Department of Energy for each defense environmental cleanup project that is— (i) in excess of $65,000,000; and (ii) carried out by the Department pursuant to such protocols. (B) Not later than 30 days after establishing a cost and schedule baseline under subparagraph (A), the Secretary shall submit the cost and schedule baseline to the congressional defense committees. **(b) Notification of Costs Exceeding Baseline.—** The Administrator or the Secretary, as applicable, shall notify the congressional defense committees not later than 30 days after determining that— (1) the total cost for a project referred to in paragraph (1), (2), (3), or (4) of subsection (a) will exceed an amount that is equal to 125 percent of the cost baseline established under subsection (a) for that project; and (2) in the case of a stockpile life extension or new nuclear weapon program project referred to in subsection (a)(1) or a major alteration project referred to in subsection (a)(2), the cost for any warhead in the project will exceed an amount that is equal to 150 percent of the cost baseline established under subsection (a)(1)(B) or (a)(2)(B), as applicable, for each warhead in that project. **(c) Notification of Determination With Respect to Termination or Continuation of Projects and Root Cause Analyses.—** Not later than 90 days after submitting a notification under subsection (b) with respect to a project, the Administrator or the Secretary, as applicable, shall— (1) notify the congressional defense committees with respect to whether the project will be terminated or continued; (2) if the project will be continued, certify to the congressional defense committees that— (A) a revised cost and schedule baseline has been established for the project and, in the case of a stockpile life extension or new nuclear weapon program project referred to in subparagraph (A) or (B) of subsection (a)(1) or a major alteration project referred to in subsection (a)(2), a revised estimate of the cost for each warhead in the project has been made; (B) a review of the revised baseline has been conducted by the Director of Cost Estimating and Program Evaluation of the National Nuclear Security Administration, consistent with section 3221(d)(1)(F) of the National Nuclear Security Administration Act ([50 U.S.C. 2411(d)(1)(F)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title50-section2411/d/1/F&num=0&edition=prelim)). (C) the continuation of the project is necessary to the mission of the Department of Energy and there is no alternative to the project that would meet the requirements of that mission; and (D) a management structure is in place adequate to manage and control the cost and schedule of the project; and (3) submit to the congressional defense committees an assessment of the root cause or causes of the growth in the total cost of the project, including the contribution of any shortcomings in cost, schedule, or performance of the program, including the role, if any, of— (A) unrealistic performance expectations; (B) unrealistic baseline estimates for cost or schedule; (C) immature technologies or excessive manufacturing or integration risk; (D) unanticipated design, engineering, manufacturing, or technology integration issues arising during program performance; (E) changes in procurement quantities; (F) inadequate program funding or funding instability; (G) poor performance by personnel of the Federal Government or contractor personnel responsible for program management; or (H) any other matters. **(d) Applicability of Requirements to Revised Cost and Schedule Baselines.—** A revised cost and schedule baseline established under subsection (c) shall— (1) be submitted to the congressional defense committees with the certification submitted under subsection (c)(2) and the results of the review conducted by the Director of Cost Estimating and Program Evaluation under subsection (c)(2)(B); and (2) be subject to the notification requirements of subsections (b) and (c) in the same manner and to the same extent as a cost and schedule baseline established under subsection (a).

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 6114 — Nuclear weapons stockpile stewardship, management, and responsiveness plan

**(a) Plan Requirement.—** The Administrator, in consultation with the Secretary of Defense and other appropriate officials of the departments and agencies of the Federal Government, shall develop and annually update a plan for sustaining the nuclear weapons stockpile. The plan shall cover, at a minimum, stockpile stewardship, stockpile management, stockpile responsiveness, stockpile surveillance, program direction, infrastructure modernization, human capital, and nuclear test readiness. The plan shall be consistent with the programmatic and technical requirements of the most recent annual Nuclear Weapons Stockpile Memorandum. **(b) Submissions to Congress.—** (1) In accordance with subsection (c), not later than 45 days after each date on which a budget for an odd-numbered fiscal year is submitted to Congress, the Administrator shall submit to the congressional defense committees a detailed report on the plan developed under subsection (a). (2) The report required by this subsection shall be submitted in unclassified form, but may include a classified annex. **(c) Elements of Biennial Detailed Report.—** Each detailed report on the plan submitted under subsection (b)(1) shall include, at a minimum, the following: (1) With respect to stockpile stewardship, stockpile management, and stockpile responsiveness— (A) the status of the nuclear weapons stockpile, including the number and age of warheads (including both active and inactive) for each warhead type; (B) for each five-year period occurring during the period beginning on the date of the report and ending on the date that is 20 years after the date of the report— (i) the planned number of nuclear warheads (including active and inactive) for each warhead type in the nuclear weapons stockpile; and (

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 6114

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

50 U.S.C. § 2761, 2762 — Repealed. Pub. L. 119–60, div. C, title XXXI, § 3111(b)(1), Dec. 18, 2025, 139 Stat. 1458

### Statutory Notes Section 2744, Pub. L. 107–314, div. D, title XLVII, § 4704, formerly div. C, title XXXVI, § 3623, Dec. 2, 2002, 116 Stat. 2758; renumbered div. D, title XLVII, § 4704, by Pub. L. 108–136, div. C, title XXXI, § 3141(j)(2)(A)–(C), Nov. 24, 2003, 117 Stat. 1781, placed limits on construction projects, with some exceptions. See [section 6275 of Title 10](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section6275&num=0&edition=prelim), Armed Forces. Section 2745, Pub. L. 107–314, div. D, title XLVII, § 4705, formerly div. C, title XXXVI, § 3624, Dec. 2, 2002, 116 Stat. 2758; renumbered div. D, title XLVII, § 4705, by Pub. L. 108–136, div. C, title XXXI, § 3141(j)(2)(A)–(C), Nov. 24, 2003, 117 Stat. 1781, provided certain fund transfer authority to the Secretary of Energy. See [section 6276 of Title 10](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section6276&num=0&edition=prelim), Armed Forces. Section 2746, Pub. L. 107–314, div. D, title XLVII, § 4706, formerly div. C, title XXXVI, § 3625, Dec. 2, 2002, 116 Stat. 2759; renumbered div. D, title XLVII, § 4706, and amended Pub. L. 108–136, div. C, title XXXI, § 3141(j)(2)(A)–(C), (D)(ii), Nov. 24, 2003, 117 Stat. 1781; Pub. L. 113–66, div. C, title XXXI, § 3120, Dec. 26, 2013, 127 Stat. 1059; Pub. L. 114–328, div. C, title XXXI, § 3121, Dec. 23, 2016, 130 Stat. 2764; Pub. L. 117–81, div. C, title XXXI, § 3115(c), Dec. 27, 2021, 135 Stat. 2227, related to conceptual and construction designs for potential construction projects. See [section 6277 of Title 10](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section6277&num=0&edition=prelim), Armed Forces. Section 2747, Pub. L. 107–314, div. D, title XLVII, § 4707, formerly div. C, title XXXV

Source: Supplied U.S. Code snapshot — release unconfirmed · 50 U.S.C. § 2761, 2762

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

50 U.S.C. § 2411 — Director for Cost Estimating and Program Evaluation

**(a) Establishment** (1) There is in the Administration a Director for Cost Estimating and Program Evaluation (in this section referred to as the “Director”). (2) The position of the Director shall be a Senior Executive Service position (as defined in [section 3132(a) of title 5](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section3132/a&num=0&edition=prelim)). **(b) Duties** (1) The Director shall be the principal advisor to the Administrator, the Deputy Secretary of Energy, and the Secretary of Energy with respect to cost estimation and program evaluation for the Administration. The Director shall report directly to the Administrator. (2) The Administrator may not delegate responsibility for receiving or acting on communications from the Director with respect to cost estimation and program evaluation for the Administration. **(c) Activities for cost estimation** (1) The Director shall be the responsible for the following activities relating to cost estimation: (A) Advising the Administrator on policies and procedures for cost analysis and estimation by the Administration, including the determination of confidence levels with respect to cost estimates. (B) Reviewing cost estimates and evaluating the performance baseline for each major atomic energy defense acquisition program. (C) Advising the Administrator on policies and procedures for developing technology readiness assessments for major atomic energy defense acquisition programs that are consistent with the guidelines of the Department of Energy for technology readiness assessments. (D) Reviewing technology readiness assessments for such programs to ensure that such programs are meeting levels of confidence associated with appropriate overall system performance. (E) As

Source: Supplied U.S. Code snapshot — release unconfirmed · 50 U.S.C. § 2411

Stored review status: release_metadata_unconfirmed. The source passage cites 50 U.S.C. § 2411. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

50 U.S.C. § 2411 — Director for Cost Estimating and Program

Page 402 TITLE 50—WAR AND NATIONAL DEFENSE § 2411 (1) the head, or any contractor employee, of a national security laboratory or of a nuclear weapons production facility; and (2) the Department of Energy, the President, or Congress. (d) Prohibition on dual office holding Except in accordance with sections 2402(a)(2) and 2406(a)(1) of this title: (1) An individual may not concurrently hold or carry out the responsibilities of— (A) a position within the Administration; and (B) a position within the Department of Energy not within the Administration. (2) No funds appropriated or otherwise made available for any fiscal year may be used to pay, to an individual who concurrently holds or carries out the responsibilities of a position specified in paragraph (1)(A) and a position specified in paragraph (1)(B), the basic pay, salary, or other compensation relating to any such position. (e) Status of intelligence and counterintelligence personnel Notwithstanding the restrictions of sub- sections (a) and (b), each officer or employee of the Administration, or of a contractor of the Ad- ministration, who is carrying out activities re- lated to intelligence or counterintelligence shall, in carrying out those activities, be subject to the authority, direction, and control of the Secretary of Energy or the Secretary’s delegate. (Pub. L. 106–65, div. C, title XXXII, § 3220, for- merly § 3213, Oct. 5, 1999, 113 Stat. 958; Pub. L. 106–398, § 1 [div. C, title XXXI, § 3157], Oct. 30, 2000, 114 Stat. 1654, 1654A–468; renumbered § 3220, Pub. L. 107–107, div. C, title XXXI, § 3141(a)(1), Dec. 28, 2001, 115 Stat. 1370; Pub. L. 109–364, div. C, title XXXI, § 3117(a)(2)(B), (d), Oct. 17, 2006, 120 Stat. 2507, 2508; Pub. L. 111–84, div. C, title XXXI, § 3121,

Source: Supplied 2024 U.S. Code historical extraction · 50 U.S.C. § 2411

Stored review status: historical_2024_not_currentness_verified. The source passage cites 50 U.S.C. § 2411. This identifies an authority to review, not proof of applicability.