As used in this subchapter:
(1) The term “affected source” means a source that includes one or more affected units.
(2) The term “affected unit” means a unit that is subject to emission reduction requirements or limitations under this subchapter.
(3) The term “allowance” means an authorization, allocated to an affected unit by the Administrator under this subchapter, to emit, during or after a specified calendar year, one ton of sulfur dioxide.
(4) The term “baseline” means the annual quantity of fossil fuel consumed by an affected unit, measured in millions of British Thermal Units (“mmBtu’s”), calculated as follows:
(A) For each utility unit that was in commercial operation prior to January 1, 1985, the baseline shall be the annual average quantity of mmBtu’s consumed in fuel during calendar years 1985, 1986, and 1987, as recorded by the Department of Energy pursuant to Form 767. For any utility unit for which such form was not filed, the baseline shall be the level specified for such unit in the 1985 National Acid Precipitation Assessment Program (NAPAP) Emissions Inventory, Version 2, National Utility Reference File (NURF) or in a corrected data base as established by the Administrator pursuant to paragraph (3).11 So in original. The reference to “paragraph (3)” probably should be to “subparagraph (C)”. For nonutility units, the baseline is the NAPAP Emissions Inventory, Version 2. The Administrator, in the Administrator’s sole discretion, may exclude periods during which a unit is shutdown for a continuous period of four calendar months or longer, and make appropriate adjustments under this paragraph. Upon petition of the owner or operator of any unit, the Administrator may make appropriate baseline adjustments for accidents that caused prolonged outages.
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7651a
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 0085fd947b987c2edbed38cd1230764ecf6e6b26e53dcc3bfc4f4c570b90074c. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_41e402b52ddd1be55294559e
Source file: Laws/federal/codes/united-states-code/title-42/section-7651a-definitions--05d5f19f69.md
Pages: Not recorded – Not recorded
Passage SHA-256: 0545ba9650cacdc16ccc33229e32d26d07f36fd83217dfabb3be4d32e4bdc27f
Source location: Title 42, Chapter 85, § 7651a; chapter-085-air-pollution-prevention-and-control.md
Stored source content
As used in this subchapter:
(1) The term “affected source” means a source that includes one or more affected units.
(2) The term “affected unit” means a unit that is subject to emission reduction requirements or limitations under this subchapter.
(3) The term “allowance” means an authorization, allocated to an affected unit by the Administrator under this subchapter, to emit, during or after a specified calendar year, one ton of sulfur dioxide.
(4) The term “baseline” means the annual quantity of fossil fuel consumed by an affected unit, measured in millions of British Thermal Units (“mmBtu’s”), calculated as follows:
(A) For each utility unit that was in commercial operation prior to January 1, 1985, the baseline shall be the annual average quantity of mmBtu’s consumed in fuel during calendar years 1985, 1986, and 1987, as recorded by the Department of Energy pursuant to Form 767. For any utility unit for which such form was not filed, the baseline shall be the level specified for such unit in the 1985 National Acid Precipitation Assessment Program (NAPAP) Emissions Inventory, Version 2, National Utility Reference File (NURF) or in a corrected data base as established by the Administrator pursuant to paragraph (3).11 So in original. The reference to “paragraph (3)” probably should be to “subparagraph (C)”. For nonutility units, the baseline is the NAPAP Emissions Inventory, Version 2. The Administrator, in the Administrator’s sole discretion, may exclude periods during which a unit is shutdown for a continuous period of four calendar months or longer, and make appropriate adjustments under this paragraph. Upon petition of the owner or operator of any unit, the Administrator may make appropriate baseline adjustments for accidents that caused prolonged outages.
(B) For any other nonutility unit that is not included in the NAPAP Emissions Inventory, Version 2, or a corrected data base as established by the Administrator pursuant to paragraph (3),1 the baseline shall be the annual average quantity, in mmBtu consumed in fuel by that unit, as calculated pursuant to a method which the administrator shall prescribe by regulation to be promulgated not later than eighteen months after November 15, 1990.
(C) The Administrator shall, upon application or on his own motion, by December 31, 1991, supplement data needed in support of this subchapter and correct any factual errors in data from which affected Phase II units’ baselines or actual 1985 emission rates have been calculated. Corrected data shall be used for purposes of issuing allowances under the 22 So in original. Probably should be “this”. subchapter. Such corrections shall not be subject to judicial review, nor shall the failure of the Administrator to correct an alleged factual error in such reports be subject to judicial review.
(5) The term “capacity factor” means the ratio between the actual electric output from a unit and the potential electric output from that unit.
(6) The term “compliance plan” means, for purposes of the requirements of this subchapter, either—
(A) a statement that the source will comply with all applicable requirements under this subchapter, or
(B) where applicable, a schedule and description of the method or methods for compliance and certification by the owner or operator that the source is in compliance with the requirements of this subchapter.
(7) The term “continuous emission monitoring system” (CEMS) means the equipment as required by [section 7651k of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651k&num=0&edition=prelim), used to sample, analyze, measure, and provide on a continuous basis a permanent record of emissions and flow (expressed in pounds per million British thermal units (lbs/mmBtu), pounds per hour (lbs/hr) or such other form as the Administrator may prescribe by regulations under [section 7651k of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651k&num=0&edition=prelim)).
(8) The term “existing unit” means a unit (including units subject to [section 7411 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7411&num=0&edition=prelim)) that commenced commercial operation before November 15, 1990. Any unit that commenced commercial operation before November 15, 1990, which is modified, reconstructed, or repowered after November 15, 1990, shall continue to be an existing unit for the purposes of this subchapter. For the purposes of this subchapter, existing units shall not include simple combustion turbines, or units which serve a generator with a nameplate capacity of 25MWe or less.
(9) The term “generator” means a device that produces electricity and which is reported as a generating unit pursuant to Department of Energy Form 860.
(10) The term “new unit” means a unit that commences commercial operation on or after November 15, 1990.
(11) The term “permitting authority” means the Administrator, or the State or local air pollution control agency, with an approved permitting program under part B 33 See References in Text note below. of title III of the Act.
(12) The term “repowering” means replacement of an existing coal-fired boiler with one of the following clean coal technologies: atmospheric or pressurized fluidized bed combustion, integrated gasification combined cycle, magnetohydrodynamics, direct and indirect coal-fired turbines, integrated gasification fuel cells, or as determined by the Administrator, in consultation with the Secretary of Energy, a derivative of one or more of these technologies, and any other technology capable of controlling multiple combustion emissions simultaneously with improved boiler or generation efficiency and with significantly greater waste reduction relative to the performance of technology in widespread commercial use as of November 15, 1990. Notwithstanding the provisions of [section 7651h(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651h/a&num=0&edition=prelim), for the purpose of this subchapter, the term “repowering” shall also include any oil and/or gas-fired unit which has been awarded clean coal technology demonstration funding as of January 1, 1991, by the Department of Energy.
(13) The term “reserve” means any bank of allowances established by the Administrator under this subchapter.
(14) The term “State” means one of the 48 contiguous States and the District of Columbia.
(15) The term “unit” means a fossil fuel-fired combustion device.
(16) The term “actual 1985 emission rate”, for electric utility units means the annual sulfur dioxide or nitrogen oxides emission rate in pounds per million Btu as reported in the NAPAP Emissions Inventory, Version 2, National Utility Reference File. For nonutility units, the term “actual 1985 emission rate” means the annual sulfur dioxide or nitrogen oxides emission rate in pounds per million Btu as reported in the NAPAP Emission Inventory, Version 2.
(17)
(A) The term “utility unit” means—
(i) a unit that serves a generator in any State that produces electricity for sale, or
(ii) a unit that, during 1985, served a generator in any State that produced electricity for sale.
(B) Notwithstanding subparagraph (A), a unit described in subparagraph (A) that—
(i) was in commercial operation during 1985, but
(ii) did not, during 1985, serve a generator in any State that produced electricity for sale shall not be a utility unit for purposes of this subchapter.
(C) A unit that cogenerates steam and electricity is not a “utility unit” for purposes of this subchapter unless the unit is constructed for the purpose of supplying, or commences construction after November 15, 1990, and supplies, more than one-third of its potential electric output capacity and more than 25 megawatts electrical output to any utility power distribution system for sale.
(18) The term “allowable 1985 emissions rate” means a federally enforceable emissions limitation for sulfur dioxide or oxides of nitrogen, applicable to the unit in 1985 or the limitation applicable in such other subsequent year as determined by the Administrator if such a limitation for 1985 does not exist. Where the emissions limitation for a unit is not expressed in pounds of emissions per million Btu, or the averaging period of that emissions limitation is not expressed on an annual basis, the Administrator shall calculate the annual equivalent of that emissions limitation in pounds per million Btu to establish the allowable 1985 emissions rate.
(19) The term “qualifying phase I technology” means a technological system of continuous emission reduction which achieves a 90 percent reduction in emissions of sulfur dioxide from the emissions that would have resulted from the use of fuels which were not subject to treatment prior to combustion.
(20) The term “alternative method of compliance” means a method of compliance in accordance with one or more of the following authorities:
(A) a substitution plan submitted and approved in accordance with subsections 44 So in original. Probably should be “section”. 7651c(b) and (c) of this title;
(B) a Phase I extension plan approved by the Administrator under [section 7651c(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651c/d&num=0&edition=prelim), using qualifying phase I technology as determined by the Administrator in accordance with that section; or
(C) repowering with a qualifying clean coal technology under [section 7651h of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651h&num=0&edition=prelim).
(21) The term “commenced” as applied to construction of any new electric utility unit means that an owner or operator has undertaken a continuous program of construction or that an owner or operator has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.
(22) The term “commenced commercial operation” means to have begun to generate electricity for sale.
(23) The term “construction” means fabrication, erection, or installation of an affected unit.
(24) The term “industrial source” means a unit that does not serve a generator that produces electricity, a “nonutility unit” as defined in this section, or a process source as defined in section 7651i(e) 55 So in original. Probably should be section “7651i(d)”. of this title.
(25) The term “nonutility unit” means a unit other than a utility unit.
(26) The term “designated representative” means a responsible person or official authorized by the owner or operator of a unit to represent the owner or operator in matters pertaining to the holding, transfer, or disposition of allowances allocated to a unit, and the submission of and compliance with permits, permit applications, and compliance plans for the unit.
(27) The term “life-of-the-unit, firm power contractual arrangement” means a unit participation power sales agreement under which a utility or industrial customer reserves, or is entitled to receive, a specified amount or percentage of capacity and associated energy generated by a specified generating unit (or units) and pays its proportional amount of such unit’s total costs, pursuant to a contract either—
(A) for the life of the unit;
(B) for a cumulative term of no less than 30 years, including contracts that permit an election for early termination; or
(C) for a period equal to or greater than 25 years or 70 percent of the economic useful life of the unit determined as of the time the unit was built, with option rights to purchase or re-lease some portion of the capacity and associated energy generated by the unit (or units) at the end of the period.
(28) The term “basic Phase II allowance allocations” means:
(A) For calendar years 2000 through 2009 inclusive, allocations of allowances made by the Administrator pursuant to [section 7651b of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651b&num=0&edition=prelim) and subsections (b)(1), (3), and (4); (c)(1), (2), (3), and (5); (d)(1), (2), (4), and (5); (e); (f); (g)(1), (2), (3), (4), and (5); (h)(1); (i) and (j) of [section 7651d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651d&num=0&edition=prelim).
(B) For each calendar year beginning in 2010, allocations of allowances made by the Administrator pursuant to [section 7651b of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651b&num=0&edition=prelim) and subsections (b)(1), (3), and (4); (c)(1), (2), (3), and (5); (d)(1), (2), (4) and (5); (e); (f); (g)(1), (2), (3), (4), and (5); (h)(1) and (3); (i) and (j) of [section 7651d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651d&num=0&edition=prelim).
(29) The term “Phase II bonus allowance allocations” means, for calendar year 2000 through 2009, inclusive, and only for such years, allocations made by the Administrator pursuant to [section 7651b of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651b&num=0&edition=prelim), subsections (a)(2), (b)(2), (c)(4), (d)(3) (except as otherwise provided therein), and (h)(2) of [section 7651d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651d&num=0&edition=prelim), and [section 7651e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651e&num=0&edition=prelim).
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Applicability** The owner and operator of any source subject to this subchapter shall be required to install and operate CEMS on each affected unit at the source, and to quality assure the data for sulfur dioxide, nitrogen oxides, opacity and volumetric flow at each such unit. The Administrator shall, by regulations issued not later than eighteen months after November 15, 1990, specify the requirements for CEMS, for any alternative monitoring system that is demonstrated as providing information with the same precision, reliability, accessibility, and timeliness as that provided by CEMS, and for recordkeeping and reporting of information from such systems. Such regulations may include limitations or the use of alternative compliance methods by units equipped with an alternative monitoring system as may be necessary to preserve the orderly functioning of the allowance system, and which will ensure the emissions reductions contemplated by this subchapter. Where 2 or more units utilize a single stack, a separate CEMS shall not be required for each unit, and for such units the regulations shall require that the owner or operator collect sufficient information to permit reliable compliance determinations for each such unit.
**(b) First phase requirements** Not later than thirty-six months after November 15, 1990, the owner or operator of each affected unit under [section 7651c of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651c&num=0&edition=prelim), including, but not limited to, units that become affected units pursuant to subsections (b) and (c) and eligible units under subsection (d), shall install and operate CEMS, quality assure the data, and keep records and reports in accordance with the regulations issued under subs
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7651k
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Definitions** For purposes of this section:
(1) The term “standard of performance” means a standard for emissions of air pollutants which reflects the degree of emission limitation achievable through the application of the best system of emission reduction which (taking into account the cost of achieving such reduction and any nonair quality health and environmental impact and energy requirements) the Administrator determines has been adequately demonstrated.
(2) The term “new source” means any stationary source, the construction or modification of which is commenced after the publication of regulations (or, if earlier, proposed regulations) prescribing a standard of performance under this section which will be applicable to such source.
(3) The term “stationary source” means any building, structure, facility, or installation which emits or may emit any air pollutant. Nothing in subchapter II of this chapter relating to nonroad engines shall be construed to apply to stationary internal combustion engines.
(4) The term “modification” means any physical change in, or change in the method of operation of, a stationary source which increases the amount of any air pollutant emitted by such source or which results in the emission of any air pollutant not previously emitted.
(5) The term “owner or operator” means any person who owns, leases, operates, controls, or supervises a stationary source.
(6) The term “existing source” means any stationary source other than a new source.
(7) The term “technological system of continuous emission reduction” means—
(A) a technological process for production or operation by any source which is inherently low-polluting or nonpolluting, or
(B) a technological system for continuous reduction of the pollution generated by a s
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7411
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Election of Governor** In addition to basic Phase II allowance allocations, upon the election of the Governor of any State, with a 1985 state-wide annual sulfur dioxide emissions rate equal to or less than, 0.80 lbs/mmBtu, averaged over all fossil fuel-fired utility steam generating units, beginning January 1, 2000, and for each calendar year thereafter until and including 2009, the Administrator shall allocate, in lieu of other Phase II bonus allowance allocations, allowances from the reserve created pursuant to [section 7651d(a)(2) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651d/a/2&num=0&edition=prelim) to all such units in the State in an amount equal to 125,000 multiplied by the unit’s pro rata share of electricity generated in calendar year 1985 at fossil fuel-fired utility steam units in all States eligible for the election.
**(b) Notification of Administrator** Pursuant to [section 7651b(a)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651b/a/1&num=0&edition=prelim), each Governor of a State eligible to make an election under paragraph 11 So in original. Probably should be “subsection”. (a) shall notify the Administrator of such election. In the event that the Governor of any such State fails to notify the Administrator of the Governor’s elections, the Administrator shall allocate allowances pursuant to [section 7651d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651d&num=0&edition=prelim).
**(c) Allowances after January 1, 2010** After January 1, 2010, the Administrator shall allocate allowances to units subject to the provisions of this section pursuant to [section 7651d of this title](https://uscode.house.gov/
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7651e
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Availability** Not later than December 31, 1997, the owner or operator of an existing unit subject to the emissions limitation requirements of section 7651d(b) and (c) of this title may demonstrate to the permitting authority that one or more units will be repowered with a qualifying clean coal technology to comply with the requirements under [section 7651d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651d&num=0&edition=prelim). The owner or operator shall, as part of any such demonstration, provide, not later than January 1, 2000, satisfactory documentation of a preliminary design and engineering effort for such repowering and an executed and binding contract for the majority of the equipment to repower such unit and such other information as the Administrator may require by regulation. The replacement of an existing utility unit with a new utility unit using a repowering technology referred to in section 7651a(2) 11 So in original. Probably should be section “7651a(12)”. of this title which is located at a different site, shall be treated as repowering of the existing unit for purposes of this subchapter, if—
(1) the replacement unit is designated by the owner or operator to replace such existing unit, and
(2) the existing unit is retired from service on or before the date on which the designated replacement unit enters commercial operation.
**(b) Extension**
(1) An owner or operator satisfying the requirements of subsection (a) shall be granted an extension of the emission limitation requirement compliance date for that unit from January 1, 2000, to December 31, 2003. The extension shall be specified in the permit issued to the source under [section 7651g of this title](https://uscode.house.gov/view.xhtml?req=g
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7651h
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Allocations of annual allowances for existing and new units**
(1) 11 So in original. No pars. (2) and (3) have been enacted. For the emission limitation programs under this subchapter, the Administrator shall allocate annual allowances for the unit, to be held or distributed by the designated representative of the owner or operator of each affected unit at an affected source in accordance with this subchapter, in an amount equal to the annual tonnage emission limitation calculated under section 7651c, 7651d, 7651e, 7651h, or 7651i of this title except as otherwise specifically provided elsewhere in this subchapter. Except as provided in sections 7651d(a)(2), 7651d(a)(3), 7651h and 7651i of this title, beginning January 1, 2000, the Administrator shall not allocate annual allowances to emit sulfur dioxide pursuant to [section 7651d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651d&num=0&edition=prelim) in such an amount as would result in total annual emissions of sulfur dioxide from utility units in excess of 8.90 million tons except that the Administrator shall not take into account unused allowances carried forward by owners and operators of affected units or by other persons holding such allowances, following the year for which they were allocated. If necessary to meeting the restrictions imposed in the preceding sentence, the Administrator shall reduce, pro rata, the basic Phase II allowance allocations for each unit subject to the requirements of [section 7651d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651d&num=0&edition=prelim). Subject to the provisions of section 7651o of this title, the Administrator shall allocate allowances for each affected unit at an affe
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7651b
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Applicability**
(1) After January 1, 2000, each existing utility unit as provided below is subject to the limitations or requirements of this section. Each utility unit subject to an annual sulfur dioxide tonnage emission limitation under this section is an affected unit under this subchapter. Each source that includes one or more affected units is an affected source. In the case of an existing unit that was not in operation during calendar year 1985, the emission rate for a calendar year after 1985, as determined by the Administrator, shall be used in lieu of the 1985 rate. The owner or operator of any unit operated in violation of this section shall be fully liable under this chapter for fulfilling the obligations specified in [section 7651j of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651j&num=0&edition=prelim).
(2) In addition to basic Phase II allowance allocations, in each year beginning in calendar year 2000 and ending in calendar year 2009, inclusive, the Administrator shall allocate up to 530,000 Phase II bonus allowances pursuant to subsections (b)(2), (c)(4), (d)(3)(A) and (B), and (h)(2) of this section and [section 7651e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651e&num=0&edition=prelim). Not later than June 1, 1998, the Administrator shall calculate, for each unit granted an extension pursuant to [section 7651h of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651h&num=0&edition=prelim) the difference between (A) the number of allowances allocated for the unit in calendar year 2000, and (B) the product of the unit’s baseline multiplied by 1.20 lbs/mmBtu, divided by 2000, and sum the computations. In each year,
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7651d
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Office of Noise Abatement and Control** The Administrator shall establish within the Environmental Protection Agency an Office of Noise Abatement and Control, and shall carry out through such Office a full and complete investigation and study of noise and its effect on the public health and welfare in order to (1) identify and classify causes and sources of noise, and (2) determine—
(A) effects at various levels;
(B) projected growth of noise levels in urban areas through the year 2000;
(C) the psychological and physiological effect on humans;
(D) effects of sporadic extreme noise (such as jet noise near airports) as compared with constant noise;
(E) effect on wildlife and property (including values);
(F) effect of sonic booms on property (including values); and
(G) such other matters as may be of interest in the public welfare.
**(b) Investigation techniques; report and recommendations** In conducting such investigation, the Administrator shall hold public hearings, conduct research, experiments, demonstrations, and studies. The Administrator shall report the results of such investigation and study, together with his recommendations for legislation or other action, to the President and the Congress not later than one year after December 31, 1970.
**(c) Abatement of noise from Federal activities** In any case where any Federal department or agency is carrying out or sponsoring any activity resulting in noise which the Administrator determines amounts to a public nuisance or is otherwise objectionable, such department or agency shall consult with the Administrator to determine possible means of abating such noise.
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7641
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Permit program** The provisions of this subchapter shall be implemented, subject to [section 7651b of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651b&num=0&edition=prelim), by permits issued to units subject to this subchapter (and enforced) in accordance with the provisions of subchapter V, as modified by this subchapter. Any such permit issued by the Administrator, or by a State with an approved permit program, shall prohibit—
(1) annual emissions of sulfur dioxide in excess of the number of allowances to emit sulfur dioxide the owner or operator, or the designated representative of the owners or operators, of the unit hold for the unit,
(2) exceedances of applicable emissions rates,
(3) the use of any allowance prior to the year for which it was allocated, and
(4) contravention of any other provision of the permit.
Permits issued to implement this subchapter shall be issued for a period of 5 years, notwithstanding subchapter V. No permit shall be issued that is inconsistent with the requirements of this subchapter, and subchapter V as applicable.
**(b) Compliance plan** Each initial permit application shall be accompanied by a compliance plan for the source to comply with its requirements under this subchapter. Where an affected source consists of more than one affected unit, such plan shall cover all such units, and for purposes of [section 7661a(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7661a/c&num=0&edition=prelim), such source shall be considered a “facility”. Nothing in this section regarding compliance plans or in subchapter V shall be construed as affecting allowances. Except as provided under subsection (c)(1)(B), submission of a statement by the owner
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7651g
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 7413
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7651a
tions in annual emissions of sulfur dioxide of ten
million tons from 1980 emission levels, and, in
combination with other provisions of this chap-
ter, of nitrogen oxides emissions of approxi-
mately two million tons from 1980 emission lev-
els, in the forty-eight contiguous States and the
District of Columbia. It is the intent of this sub-
chapter to effectuate such reductions by requir-
ing compliance by affected sources with pre-
scribed emission limitations by specified dead-
lines, which limitations may be met through al-
ternative methods of compliance provided by an
emission allocation and transfer system. It is
also the purpose of this subchapter to encourage
energy conservation, use of renewable and clean
alternative technologies, and pollution preven-
tion as a long-range strategy, consistent with
the provisions of this subchapter, for reducing
air pollution and other adverse impacts of en-
ergy production and use.
(July 14, 1955, ch. 360, title IV, § 401, as added
Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104
Stat. 2584.)
Editorial Notes
CODIFICATION
Another section 401 of act July 14, 1955, as added by
Pub. L. 91–604, § 14, Dec. 31, 1970, 84 Stat. 1709, is set out
as a Short Title note under section 7401 of this title.
Statutory Notes and Related Subsidiaries
ACID DEPOSITION STANDARDS
Pub. L. 101–549, title IV, § 404, Nov. 15, 1990, 104 Stat.
2632, directed Administrator of Environmental Protec-
tion Agency, not later than 36 months after Nov. 15,
1990, to transmit to Congress a report on the feasibility
and effectiveness of an acid deposition standard or
standards to protect sensitive and critically sensitive
aquatic and terrestrial resources.
INDUSTRIAL SO2 EMISSIONS
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 7651a
Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.