The provisions of this chapter shall not be applicable to (1) the Canyon Ferry project and (2), except as provided in [section 837e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section837e&num=0&edition=prelim), downstream power benefits to which Canada is entitled under the treaty between Canada and the United States relating to the cooperative development of the water resources of the Columbia River Basin, signed at Washington, January 17, 1961, nor to energy or capacity disposed of to Canada in any exchange pursuant to paragraph 1 or 2 of article VIII thereof. Nothing in this chapter shall be construed to modify the geographical preference of power users in the State of Montana which is established by the Hungry Horse Dam Act (Act of June 4, 1944, 58 Stat. 270), as amended.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 837h

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: dd21b75f629f0fd6d33016c7be99a4dcf5456edd37216f26eca25b596bcc92fd. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_35583a202315148a179d407a
Source file: Laws/federal/codes/united-states-code/title-16/section-837h-provisions-not-applicable-to-canyon-ferry-project-or-benefits-and-exchan--5022192e98.md
Pages: Not recorded – Not recorded
Passage SHA-256: 700f5c6d7aef1b748cd364a51ab000f3472e421dca60cd02ce3e5d5d42f10854

Source location: Title 16, Chapter 12F, § 837h; chapter-12f-pacific-northwest-consumer-power-preference-reciprocal-priority-in-other-regions.md

Stored source content

The provisions of this chapter shall not be applicable to (1) the Canyon Ferry project and (2), except as provided in [section 837e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section837e&num=0&edition=prelim), downstream power benefits to which Canada is entitled under the treaty between Canada and the United States relating to the cooperative development of the water resources of the Columbia River Basin, signed at Washington, January 17, 1961, nor to energy or capacity disposed of to Canada in any exchange pursuant to paragraph 1 or 2 of article VIII thereof. Nothing in this chapter shall be construed to modify the geographical preference of power users in the State of Montana which is established by the Hungry Horse Dam Act (Act of June 4, 1944, 58 Stat. 270), as amended.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 837e — Transmission lines for other electric energy; rates

Any capacity in Federal transmission lines connecting, either by themselves or with non-Federal lines, a generating plant in the Pacific Northwest or Canada with the other area or with any other area outside the Pacific Northwest, which is not required for the transmission of Federal energy or the energy described in [section 837h of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section837h&num=0&edition=prelim), shall be made available as a carrier for transmission of other electric energy between such areas. The transmission of other electric energy shall be at equitable rates determined by the Secretary, but such rates shall be subject to equitable adjustment at appropriate intervals not less frequently than once in every five years as agreed to by the parties. No contract for the transmission of non-Federal energy on a firm basis shall be affected by any increase, subsequent to the execution of such contract, in the requirements for transmission of Federal energy, the energy described in [section 837h of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section837h&num=0&edition=prelim), or other electric energy.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 837e

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 837h — Provisions not applicable to Canyon

Page 1509 TITLE 16—CONSERVATION § 837h Northwest in equal amounts during the same Pacific Northwest refill period or the succeeding storage drawdown period, (3) any hydroelectric energy which will be returned to the Pacific Northwest in equal amounts during the same Pacific Northwest storage drawdown period, (4) hydroelectric peaking capacity, or (5) surplus peaking capacity for energy. All benefits from such exchanges, including resulting increases of firm power, shall be shared equitably by the areas involved, having regard to the secondary energy and other contributions made by each. (Pub. L. 88–552, § 5, Aug. 31, 1964, 78 Stat. 758.) § 837e. Transmission lines for other electric en- ergy; rates Any capacity in Federal transmission lines connecting, either by themselves or with non- Federal lines, a generating plant in the Pacific Northwest or Canada with the other area or with any other area outside the Pacific North- west, which is not required for the transmission of Federal energy or the energy described in sec- tion 837h of this title, shall be made available as a carrier for transmission of other electric en- ergy between such areas. The transmission of other electric energy shall be at equitable rates determined by the Secretary, but such rates shall be subject to equitable adjustment at ap- propriate intervals not less frequently than once in every five years as agreed to by the parties. No contract for the transmission of non-Federal energy on a firm basis shall be affected by any increase, subsequent to the execution of such contract, in the requirements for transmission of Federal energy, the energy described in sec- tion 837h of this title, or other electric energy. (Pub. L. 88–552, § 6, Aug. 31, 1964, 78 Stat. 758.) § 837f.

Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 837h

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.