Arkansas Legal Resource Navigator

43 U.S.C. § 3004 — National goal for renewable energy production on Federal land

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 3004 — National goal for renewable energy production on Federal land

**(a) In general** Not later than September 1, 2022, the Secretary shall, in consultation with the Secretary of Agriculture and other heads of relevant Federal agencies, establish national goals for renewable energy production on Federal land. **(b) Minimum production goal** The Secretary shall seek to issue permits that, in total, authorize production of not less than 25 gigawatts of electricity from wind, solar, and geothermal energy projects by not later than 2025, through management of public lands and administration of Federal laws.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 3004

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 6a39cd724fa295490228807a9028749b9198cff01704bceb5a8a50ff7627c7eb. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_35238572db167468090b8936
Source file: Laws/federal/codes/united-states-code/title-43/section-3004-national-goal-for-renewable-energy-production-on-federal-land--d6610f1a1f.md
Pages: Not recorded – Not recorded
Passage SHA-256: 53f89b41e9b327df5d2de4c575a0721496a1656c6c7a64219fe64a9b00dbbfc9

Source location: Title 43, Chapter 48, § 3004; chapter-048-renewable-energy-production-on-federal-land.md

Stored source content

**(a) In general** Not later than September 1, 2022, the Secretary shall, in consultation with the Secretary of Agriculture and other heads of relevant Federal agencies, establish national goals for renewable energy production on Federal land. **(b) Minimum production goal** The Secretary shall seek to issue permits that, in total, authorize production of not less than 25 gigawatts of electricity from wind, solar, and geothermal energy projects by not later than 2025, through management of public lands and administration of Federal laws.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 371 — Definitions

When used in sections 371, 376, 377, 412, 417, 433, 462, 466, 478, 493, 494, 500, 501, and 526 of this title— **(a)** The word “Secretary” means the Secretary of the Interior. **(b)** The words “reclamation law” mean the Act of June 17, 1902 (32 Stat. 388), and all Acts amendatory thereof or supplementary thereto. **(c)** The words “reclamation fund” mean the fund provided by the reclamation law. **(d)** The word “project” means a Federal irrigation project authorized by the reclamation law. **(e)** The words “division of a project” mean a substantial irrigable area of a project designated as a division by order of the Secretary.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 371

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 3004 — National goal for renewable energy pro-

Page 662 TITLE 43—PUBLIC LANDS § 3003 any programs administered by the offices in ac- cordance with the multiple use mandate of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.). (e) Transfer of funds To facilitate the coordination and processing of eligible project permits on Federal land under the Renewable Energy Coordination Offices, the Secretary may authorize the expenditure or transfer of any funds that are necessary to— (1) the United States Fish and Wildlife Serv- ice; (2) the Bureau of Indian Affairs; (3) the Forest Service; (4) the Corps of Engineers; (5) the National Park Service; (6) the Environmental Protection Agency; or (7) the Department of Defense. (f) Report to Congress (1) In general Not later than February 1 of the first fiscal year beginning after December 27, 2020, and each February 1 thereafter, the Secretary shall submit to the Committee on Energy and Natural Resources and the Committee on En- vironment and Public Works of the Senate and the Committee on Natural Resources of the House of Representatives a report describing the progress made under the program estab- lished under subsection (a) during the pre- ceding year. (2) Inclusions Each report under this subsection shall in- clude— (A) projections for renewable energy pro- duction and capacity installations; and (B) a description of any problems relating to leasing, permitting, siting, or production. (Pub. L. 116–260, div. Z, title III, § 3102, Dec. 27, 2020, 134 Stat. 2514.) Editorial Notes REFERENCES IN TEXT The Clean Air Act, referred to in subsec. (c)(1)(C), is act July 14, 1955, ch. 360, 69 Stat. 322, which is classified generally to chapter 85 (§ 7401 et seq.) of Title 42, The Public Health and Welfare. For complete classific

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 3004

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.