Arkansas Legal Resource Navigator

42 U.S.C. § 8422 — Compliance report

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 8422 — Compliance report

**(a) Generally** Any person owning, operating, or proposing to operate one or more existing electric powerplants required to come into compliance with the prohibitions of this chapter shall on or before January 1, 1980, and annually thereafter, submit to the Secretary a report identifying all such existing electric powerplants owned or operated by such person. Such report shall— (1) set forth the anticipated schedule for compliance with the applicable requirements and prohibitions by each such electric powerplant; (2) indicate proposed or existing contracts or other commitments or good faith negotiations for such contracts or commitments for coal or another alternate fuel, equipment, or combinations thereof, which would enable such powerplant to comply with such prohibitions; and (3) identify those electric powerplants, if any, for which application for temporary or permanent exemption from the prohibitions of this chapter may be filed. **(b) Report on implementation of section 8484 plan** Any electric utility required to submit a conservation plan under [section 8484 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8484&num=0&edition=prelim) shall annually submit to the Secretary a report identifying the steps taken during the preceding year to implement such plan.

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 8422

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 93ea3e80ae22b2a8d0be8342ce940283359f27cb8bf42e354d5d417b097bd8d0. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_324bfe8d2961992cf1e2b97f
Source file: Laws/federal/codes/united-states-code/title-42/section-8422-compliance-report--0b71860d7b.md
Pages: Not recorded – Not recorded
Passage SHA-256: 13c9ef005fed4245c4f57becfb72138f38e6e43d9aa4a3b3a2daf6996e4909f1

Source location: Title 42, Chapter 92, § 8422; chapter-092-powerplant-and-industrial-fuel-use.md

Stored source content

**(a) Generally** Any person owning, operating, or proposing to operate one or more existing electric powerplants required to come into compliance with the prohibitions of this chapter shall on or before January 1, 1980, and annually thereafter, submit to the Secretary a report identifying all such existing electric powerplants owned or operated by such person. Such report shall— (1) set forth the anticipated schedule for compliance with the applicable requirements and prohibitions by each such electric powerplant; (2) indicate proposed or existing contracts or other commitments or good faith negotiations for such contracts or commitments for coal or another alternate fuel, equipment, or combinations thereof, which would enable such powerplant to comply with such prohibitions; and (3) identify those electric powerplants, if any, for which application for temporary or permanent exemption from the prohibitions of this chapter may be filed. **(b) Report on implementation of section 8484 plan** Any electric utility required to submit a conservation plan under [section 8484 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8484&num=0&edition=prelim) shall annually submit to the Secretary a report identifying the steps taken during the preceding year to implement such plan.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 8301 — Findings; statement of purposes

**(a) Findings** The Congress finds that— (1) the protection of public health and welfare, the preservation of national security, and the regulation of interstate commerce require the establishment of a program for the expended 11 So in original. Probably should be “expanded”. use, consistent with applicable environmental requirements, of coal and other alternate fuels as primary energy sources for existing and new electric powerplants; and (2) the purposes of this chapter are furthered in cases in which coal or other alternate fuels are used by electric powerplants, consistent with applicable environmental requirements, as primary energy sources in lieu of natural gas or petroleum. **(b) Statement of purposes** The purpose 22 So in original. Probably should be “purposes”. of this chapter, which shall be carried out in a manner consistent with applicable environmental requirements, are— (1) to reduce the importation of petroleum and increase the Nation’s capability to use indigenous energy resources of the United States to the extent such reduction and use further the goal of national energy self-sufficiency and otherwise are in the best interests of the United States; (2) to encourage and foster the greater use of coal and other alternate fuels, in lieu of natural gas and petroleum, as a primary energy source; (3) to the extent permitted by this chapter, to encourage the use of synthetic gas derived from coal or other alternate fuels; (4) to encourage the rehabilitation and upgrading of railroad service and equipment necessary to transport coal to regions or States which can use coal in greater quantities; (5) to encourage the modernization or replacement of existing and new electric powerplants which utilize natural gas or petroleum as a primary energy source

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 8301

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 6240 — Repealed. Pub. L. 106–469, title I, § 103(8)–(11), Nov. 9, 2000, 114 Stat. 2030

### Statutory Notes Section 6235, Pub. L. 94–163, title I, § 155, Dec. 22, 1975, 89 Stat. 884; Pub. L. 95–619, title VI, § 691(b)(2), Nov. 9, 1978, 92 Stat. 3288, related to the Early Storage Reserve. Section 6236, Pub. L. 94–163, title I, § 156, Dec. 22, 1975, 89 Stat. 885; Pub. L. 95–619, title VI, § 691(b)(2), Nov. 9, 1978, 92 Stat. 3288, related to the Industrial Petroleum Reserve. Section 6237, Pub. L. 94–163, title I, § 157, Dec. 22, 1975, 89 Stat. 885; Pub. L. 95–619, title VI, § 691(b)(2), Nov. 9, 1978, 92 Stat. 3288; Pub. L. 102–486, title XIV, § 1405, Oct. 24, 1992, 106 Stat. 2995, related to the Regional Petroleum Reserve. Section 6238, Pub. L. 94–163, title I, § 158, Dec. 22, 1975, 89 Stat. 886; Pub. L. 95–619, title VI, § 691(b)(2), Nov. 9, 1978, 92 Stat. 3288, related to a report on the establishment of Utility Reserves, Coal Reserves, Remote Crude Oil and Natural Gas Reserves.

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 6240

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 8484 — Electric utility conservation plan

**(a) Applicability** An electric utility is subject to this subsection 11 So in original. Probably should be “section”. if— (1) the utility owns or operates any existing electric powerplant in which natural gas was used as a primary energy source at any time during the 1-year period ending on August 13, 1981, and (2) the utility plans to use natural gas as a primary energy source in any electric powerplant. **(b) Submission and approval of plan** The Secretary shall require each electric utility subject to this section to— (1) submit, within 1 year after August 13, 1981, and have approved by the Secretary, a conservation plan which meets the requirements of subsection (c); and (2) implement such plan during the 5-year period beginning on the date of the initial approval of such plan. **(c) Contents of plan** (1) Any conservation plan under this section shall set forth means determined by the utility to achieve conservation of electric energy not later than the 5th year after its initial approval at a level, measured on an annual basis, at least equal to 10 percent of the electric energy output of that utility during the most recent 4 calendar quarters ending prior to August 13, 1981, which is attributable to natural gas. (2) The conservation plan shall include— (A) all activities required for such utility by part 1 of title II of the National Energy Conservation Policy Act [[42 U.S.C. 8211](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8211&num=0&edition=prelim) et seq.]; (B) an effective public information program for conservation; and (C) such other measures as the utility may consider appropriate. (3) Any such plan may set forth a program for the use of renewable energy sources (other than hydroelectric power). (4) An

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 8484

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 8422 — Compliance report

Page 7607 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 8422 (c) Judicial review (1) Any person aggrieved by any final rule or order referred to in subsection (a) or in section 8374 of this title, or by the denial of a petition for an order granting an exemption (or permit) referred to in subsection (b), may at any time before the 60th day after the date such rule, order, or denial is published under subsection (a) or (b), file a petition with the United States court of appeals for the circuit wherein such person resides, or has his principal place of busi- ness, for judicial review thereof. A copy of the petition shall be forthwith transmitted by the clerk of the court to the Secretary. The Sec- retary thereupon shall file in the court the writ- ten submissions to, and transcript of, the writ- ten or oral proceedings on which the rule or order was based as provided in section 2112 of title 28. (2) Upon the filing of the petition referred to in paragraph (1), the court shall have jurisdic- tion to review the rule, order, or denial in ac- cordance with chapter 7 of title 5, and to grant appropriate relief as provided in such chapter. No rule or order (or denial thereof) may be af- firmed unless supported by substantial evidence. (3) The judgment of the court affirming or set- ting aside, in whole or in part, any such rule, order, or denial shall be final, subject to review by the Supreme Court of the United States upon certiorari or certification as provided in section 1254 of title 28. (4) Subject to the direction and control of the Attorney General, as provided in section 519 of title 28, attorneys appointed by the Secretary may appear for and represent the Secretary in any proceeding instituted under this section in accordance with section 7192

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 8422

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.