10 U.S.C. § 2815 — Military installation resilience projects

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2815 — Military installation resilience projects

**(a) Projects Required.—** The Secretary of Defense shall carry out military construction projects, including unspecified minor military construction projects not otherwise authorized by law, for military installation resilience, in accordance with— (1) [section 2802 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section2802&num=0&edition=prelim) (except as provided in subsection (e)); or (2) [section 2805 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section2805&num=0&edition=prelim). **(b) Congressional Notification.—** (1) When a decision is made to carry out a project under this section, the Secretary of Defense shall notify the congressional defense committees of that decision. (2) The Secretary of Defense shall include in each notification submitted under paragraph (1) the rationale for how the project would— (A) enhance military installation resilience; (B) enhance mission assurance; (C) support mission critical functions; and (D) address known vulnerabilities. **(c) Timing of Projects.—** Except as provided in subsection (e)(2), a project may be carried out under this section only after the end of the 14-day period beginning on the date that notification with respect to that project under subsection (b) is received by the congressional defense committees in an electronic medium pursuant to [section 480 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section480&num=0&edition=prelim). **(d) Location of Projects.—** Projects carried out pursuant to this section may be carried out— (1) on a military installation; (2) on a facility used by the Department of Defense that is owned and operated by a State, the District of Columbia, the Com

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2815

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: ef8e9905b88844b9181f854aa3a81c48d2a5456a3ac7653d21db376438da2736. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_2b053323b0217f7939c9a45c
Source file: Laws/federal/codes/united-states-code/title-10/section-2815-military-installation-resilience-projects--0dd78c0540.md
Pages: Not recorded – Not recorded
Passage SHA-256: 07f417e801d278dc8f4cae4ce6e2b57fbd5cd2c31856afcce82475af01a5df41

Source location: Title 10, Chapter 169, § 2815; chapter-169-military-construction-and-military-family-housing.md

Stored source content

**(a) Projects Required.—** The Secretary of Defense shall carry out military construction projects, including unspecified minor military construction projects not otherwise authorized by law, for military installation resilience, in accordance with— (1) [section 2802 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section2802&num=0&edition=prelim) (except as provided in subsection (e)); or (2) [section 2805 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section2805&num=0&edition=prelim). **(b) Congressional Notification.—** (1) When a decision is made to carry out a project under this section, the Secretary of Defense shall notify the congressional defense committees of that decision. (2) The Secretary of Defense shall include in each notification submitted under paragraph (1) the rationale for how the project would— (A) enhance military installation resilience; (B) enhance mission assurance; (C) support mission critical functions; and (D) address known vulnerabilities. **(c) Timing of Projects.—** Except as provided in subsection (e)(2), a project may be carried out under this section only after the end of the 14-day period beginning on the date that notification with respect to that project under subsection (b) is received by the congressional defense committees in an electronic medium pursuant to [section 480 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section480&num=0&edition=prelim). **(d) Location of Projects.—** Projects carried out pursuant to this section may be carried out— (1) on a military installation; (2) on a facility used by the Department of Defense that is owned and operated by a State, the District of Columbia, the Commonwealth of Puerto Rico, American Samoa, Guam, the Commonwealth of the Northern Mariana Islands, or the Virgin Islands, even if the facility is not under the jurisdiction of the Department of Defense, if the Secretary of Defense determines that the facility is subject to significant use by the armed forces for testing or training; or (3) outside of a military installation or facility described in paragraph (2) if the Secretary concerned determines that the project would preserve or enhance the resilience of— (A) a military installation; (B) a facility described in paragraph (2); or (C) community infrastructure determined by the Secretary concerned to be necessary to maintain, improve, or rapidly reestablish installation mission assurance and mission-essential functions. **(e) Alternative Funding Source.—** (1) In carrying out a project under this section, the Secretary concerned may use amounts available for operation and maintenance for the military department concerned if the Secretary concerned submits a notification to the congressional defense committees of the decision to carry out the project using such amounts and includes in the notification— (A) the current estimate of the cost of the project; (B) the source of funds for the project; and (C) a certification that deferral of the project for inclusion in the next Military Construction Authorization Act would be inconsistent with national security or the protection of health, safety, or environmental quality, as the case may be. (2) A project carried out under this section using amounts under paragraph (1) may be carried out only after the end of the 7-day period beginning on the date on which a copy of the notification described in paragraph (1) is provided in an electronic medium pursuant to [section 480 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section480&num=0&edition=prelim). (3) The maximum aggregate amount that the Secretary concerned may obligate from amounts available to the military department concerned for operation and maintenance in any fiscal year for projects under the authority of this subsection is $125,000,000. **(f) Annual Report.—** Not later than 90 days after the end of each fiscal year until December 31, 2025, the Secretary of Defense shall submit to the congressional defense committees a report on the status of the planned and active projects carried out under this section (including completed projects), and shall include in the report with respect to each such project the following information: (1) The title, location, a brief description of the scope of work, the original project cost estimate, and the current working cost estimate. (2) The information provided under subsection (b)(2). (3) Such other information as the Secretary considers appropriate.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2805 — Unspecified minor construction

**(a) Authority to Carry Out Unspecified Minor Military Construction Projects.—** (1) Within an amount equal to 125 percent of the amount authorized by law for such purpose, the Secretary concerned may carry out unspecified minor military construction projects not otherwise authorized by law. (2) An unspecified minor military construction project is a military construction project, land acquisition, or demolition project that has an approved cost equal to or less than $9,000,000. (3) Notwithstanding the requirements of this section, the Secretary concerned may use amounts authorized pursuant to another law or regulation to carry out a demolition project described in paragraph (2). **(b) Approval and Congressional Notification.—** (1) An unspecified minor military construction project costing more than $750,000 may not be carried out under this section unless approved in advance by the Secretary concerned. This paragraph shall apply even though the project is to be carried out using funds made available to enhance the deployment and mobility of military forces and supplies. (2) When a decision is made to carry out an unspecified minor military construction project to which paragraph (1) is applicable and which costs more than $6,000,000, the Secretary concerned shall submit, in an electronic medium pursuant to [section 480 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section480&num=0&edition=prelim), to the appropriate committees of Congress a notification of that decision not later than 90 days after the date on which the Secretary concerned obligates funds for the project. Such notification shall include a description of the project, a justification for the project, and an estimation of the total cost of the project. **(c)

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2805

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2802 — Military construction projects

**(a)** The Secretary of Defense and the Secretaries of the military departments may carry out such military construction projects, land acquisitions, and defense access road projects (as described under [section 210 of title 23](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title23-section210&num=0&edition=prelim)) as are authorized by law. **(b)** Authority provided by law to carry out a military construction project includes authority for— (1) surveys and site preparation; (2) acquisition, conversion, rehabilitation, and installation of facilities; (3) acquisition and installation of equipment and appurtenances integral to the project; (4) acquisition and installation of supporting facilities (including utilities) and appurtenances incident to the project; (5) planning, supervision, administration, and overhead incident to the project; and (6) personnel and personal services contracts required to carry out paragraphs (1) through (5). **(c)** In determining the scope of a proposed military construction project, the Secretary concerned shall submit to the President such recommendations as the Secretary considers to be appropriate regarding the incorporation and inclusion of life-cycle cost-effective practices as an element in the project documents submitted to Congress in connection with the budget submitted pursuant to [section 1105 of title 31](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section1105&num=0&edition=prelim) for the fiscal year in which a contract is proposed to be awarded for the project. **(d)** Repealed. Pub. L. 114–328, div. B, title XXVIII, § 2811(b), Dec. 23, 2016, 130 Stat. 2716.] **(e)** (1) If a construction project, land acquisition, or defense access road project described in paragraph (2) wil

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2802

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 480 — Reports to Congress: submission in electronic form

**(a) Requirement.—** Whenever the Secretary of Defense or any other official of the Department of Defense submits to Congress (or any committee of either House of Congress) a report that the Secretary (or other official) is required by law to submit, the Secretary (or other official) shall provide to Congress (or such committee) a copy of the report in an electronic medium. **(b) Exception.—** Subsection (a) does not apply to a report submitted in classified form. **(c) Definition.—** In this section, the term “report” includes any certification, notification, or other communication in writing.

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 480

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2815a — Stormwater management, shoreline erosion control, and water resilience projects for installations and defense access roads

**(a) Projects Authorized.—** The Secretary concerned may carry out one or more of the following projects on or related to a military installation: (1) A stormwater management project for the purposes of— (A) improving military installation resilience or the resilience of a defense access road or other essential civilian infrastructure supporting a military installation; and (B) protecting nearby waterways and stormwater-stressed ecosystems. (2) A shoreline erosion control project for the purpose of improving, protecting, or repairing shoreline to protect the infrastructure of a military installation or a defense access road. (3) A project to provide water storage and filtration, flood mitigation, or otherwise support water resilience. **(b) Project Methods and Funding Sources.—** Using such amounts as may be provided in advance in appropriation Acts, the Secretary concerned may carry out a project under this section as, or as part of, any of the following: (1) An authorized military construction project. (2) An unspecified minor military construction project under [section 2805 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section2805&num=0&edition=prelim), including using appropriations available for operation and maintenance subject to the limitation in subsection (c) of such section. (3) A military installation resilience project under [section 2815 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section2815&num=0&edition=prelim), including the use of appropriations available for operations and maintenance subject to the limitation of subsection (e)(3) of such section. (4) A defense community infrastructure resilience project under [section 2391(d) of this title](https://uscode.h

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2815a

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2815 — Military installation resilience projects

Page 2243 TITLE 10—ARMED FORCES § 2815 authorized under subchapter IV of this chapter at Ford Island. (j) INAPPLICABILITY OF CERTAIN PROPERTY MANAGEMENT LAWS.—Except as otherwise pro- vided in this section, transactions under this section shall not be subject to the following: (1) Sections 2667 and 2696 of this title. (2) Section 501 of the McKinney-Vento Homeless Assistance Act (42 U.S.C. 11411). (3) Subchapter II of chapter 5 and sections 541–555 of title 40. (k) SCORING.—Nothing in this section shall be construed to waive the applicability to any lease entered into under this section of the budget scorekeeping guidelines used to measure compli- ance with the Balanced Budget and Emergency Deficit Control Act of 1985. (l) PROPERTY SUPPORT SERVICE DEFINED.—In this section, the term ‘‘property support serv- ice’’ means the following: (1) Any utility service or other service listed in section 2686(a) of this title. (2) Any other service determined by the Sec- retary to be a service that supports the oper- ation and maintenance of real property, per- sonal property, or facilities. (Added Pub. L. 106–65, div. B, title XXVIII, § 2802(a)(1), Oct. 5, 1999, 113 Stat. 845; amended Pub. L. 106–398, § 1 [[div. A], title X, § 1087(a)(16)], Oct. 30, 2000, 114 Stat. 1654, 1654A–291; Pub. L. 107–107, div. A, title X, § 1048(d)(1), Dec. 28, 2001, 115 Stat. 1227; Pub. L. 107–217, § 3(b)(18), Aug. 21, 2002, 116 Stat. 1296; Pub. L. 111–383, div. B, title XXVIII, § 2803(c), Jan. 7, 2011, 124 Stat. 4459; Pub. L. 115–91, div. B, title XXVIII, § 2801(a)(11), Dec. 12, 2017, 131 Stat. 1842.) Editorial Notes REFERENCES IN TEXT The Balanced Budget and Emergency Deficit Control Act of 1985, referred to in subsec. (k), is title II of Pub. L. 99–177, Dec. 12, 1985, 99

Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 2815

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.