Arkansas Legal Resource Navigator

43 U.S.C. § 618j — Effect of refusal to modify existing contracts

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 618j — Effect of refusal to modify existing contracts

Any contractor for energy from the project failing or refusing to execute a contract modifying its existing contract to conform to this subchapter shall continue to pay the rates and charges provided for in its existing contract, subject to such periodic readjustments as are therein provided, in all respects as if this subchapter had not been passed, and so far as necessary to support such existing contract all of the provisions of the Project Act [[43 U.S.C. 617](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617&num=0&edition=prelim) et seq.] shall remain in effect, anything in this subchapter inconsistent therewith notwithstanding.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 618j

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 29db9f04a3c4af62964db2a4330bc17250c93dba706e61ec5dd8cd6935c74f54. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_22317ebeff186601332f20cf
Source file: Laws/federal/codes/united-states-code/title-43/section-618j-effect-of-refusal-to-modify-existing-contracts--6641de0189.md
Pages: Not recorded – Not recorded
Passage SHA-256: eb81a06686b1276f2f35a0e0682a93c093b931803e84f63424bbac4f05fa7d72

Source location: Title 43, Chapter 12A, § 618j; chapter-12a-boulder-canyon-project.md

Stored source content

Any contractor for energy from the project failing or refusing to execute a contract modifying its existing contract to conform to this subchapter shall continue to pay the rates and charges provided for in its existing contract, subject to such periodic readjustments as are therein provided, in all respects as if this subchapter had not been passed, and so far as necessary to support such existing contract all of the provisions of the Project Act [[43 U.S.C. 617](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617&num=0&edition=prelim) et seq.] shall remain in effect, anything in this subchapter inconsistent therewith notwithstanding.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 618k — Definitions

The following terms wherever used in this subchapter shall have the following respective meanings:

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 618k

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 617 — Colorado River Basin; protection and development; dam, reservoir, and incidental works; water, water power, and electrical energy; eminent domain

For the purpose of controlling the floods, improving navigation, and regulating the flow of the Colorado River, providing for storage and for the delivery of the stored waters thereof for reclamation of public lands and other beneficial uses exclusively within the United States, and for the generation of electrical energy as a means of making the project herein authorized a self-supporting and financially solvent undertaking, the Secretary of the Interior subject to the terms of the Colorado River compact hereinafter mentioned in this chapter, is authorized to construct, operate, and maintain a dam and incidental works in the main stream of the Colorado River at Black Canyon or Boulder Canyon adequate to create a storage reservoir of a capacity of not less than twenty million acre-feet of water and a main canal and appurtenant structures located entirely within the United States connecting the Laguna Dam, or other suitable diversion dam, which the Secretary of the Interior is authorized to construct if deemed necessary or advisable by him upon engineering or economic considerations, with the Imperial and Coachella Valleys in California, the expenditures for said main canal and appurtenant structures to be reimbursable, as provided in the reclamation law, and shall not be paid out of revenues derived from the sale or disposal of water power or electric energy at the dam authorized to be constructed at said Black Canyon or Boulder Canyon, or for water for potable purposes outside of the Imperial and Coachella Valleys: Provided, however, That no charge shall be made for water for the use, storage, or delivery of water for irrigation or water for potable purposes in the Imperial or Coachella Valleys; also to construct and equip, operate, and maintain at or near said dam, or

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 617

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 617 — Colorado River Basin; protection and de-

Page 209 TITLE 43—PUBLIC LANDS § 617 Sec. 618i. Effective date. 618j. Effect of refusal to modify existing contracts. 618k. Definitions. 618l. Repealed. 618m. Effect on existing laws and States’ rights. 618n. Wages of employees. 618o. Short title. 618p. Omitted. SUBCHAPTER III—HOOVER DAM CONTRACTS AND FACILITIES 619. Increase in capacity of existing generating equipment at Hoover Powerplant; construc- tion of Colorado River bridge crossing. 619a. Renewal contracts for power. 619b. Reimbursement of funds advanced by non- Federal purchasers; uprating program; re- payment requirement; visitor facilities pro- gram. Statutory Notes and Related Subsidiaries CONSOLIDATION OF CERTAIN PROJECTS; EFFECT ON THIS CHAPTER Act May 28, 1954, ch. 241, 68 Stat. 143, provided that: ‘‘For the purposes of effecting economies and in- creased efficiency in the construction, operation, and maintenance thereof and of accounting for the return of reimbursable costs, the Secretary of the Interior is authorized and directed to consolidate and administer as a single project to be known as the Parker-Davis project, Arizona-California-Nevada, the projects known as the Parker Dam power project, Arizona-California, and the Davis Dam project, Arizona-Nevada: Provided, That nothing in this Act shall be construed to alter or affect in any way the Boulder Canyon Project Act (45 Stat. 1057) [subchapter I of this chapter], the Boulder Canyon Project Adjustment Act (54 Stat. 774) [sub- chapter II of this chapter], or the treaty between the United States of America and the United Mexican States, signed at Washington on February 3, 1944, relat- ing to the utilization of the waters of the Colorado and Tijuana Rivers and of the Rio Grande from Fort Quitman, Texas, to th

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 617

Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 617. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 618j — Effect of refusal to modify existing con-

Page 221 TITLE 43—PUBLIC LANDS § 618j to any allottee made by any rule or regulation heretofore promulgated shall be modified or changed without the consent of such allottee. (July 19, 1940, ch. 643, § 8, 54 Stat. 777.) Editorial Notes REFERENCES IN TEXT The Project Act, referred to in text, is defined in sec- tion 618k of this title. § 618h. Termination of existing lease of Hoover Power Plant; lessees as agents of United States; termination of agency The Secretary is authorized to negotiate for and enter into a contract for the termination of the existing lease of the Hoover Power Plant made pursuant to the Project Act [43 U.S.C. 617 et seq.], and in the event of such termination the operation and maintenance, and the making of replacements, however necessitated, of the Hoover Power Plant by the United States, di- rectly or through such agent or agents as the Secretary may designate, is authorized. The powers, duties, and rights of such agent or agents shall be provided by contract, which may include provision that questions relating to the interpretation or performance thereof may be determined, to the extent provided therein, by arbitration or court proceedings. The Secretary in consideration of such termination of such ex- isting lease is authorized to agree (a) that the lessees therein named shall be designated as the agents of the United States for the operation of said power plant; (b) that (except by mutual consent or in accordance with such provisions for termination for default as may be specified therein) such agency contract shall not be rev- ocable or terminable; and (c) that suits or pro- ceedings to restrain the termination of any such agency contract, otherwise than as therein pro- vided, or for other appropriate equitable

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 618j

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.