**(a) Construction and operation; Hayden-Rhodes Aqueduct and pumping plants; Orme Dam and Reservoir; Buttes Dam and Reservoir; Hooker Dam and Reservoir; Charleston Dam and Reservoir; Tucson aqueducts and pumping plants; Fannin-McFarland Aqueduct; related and appurtenant works** For the purposes of furnishing irrigation water and municipal water supplies to the water-deficient areas of Arizona and western New Mexico through direct diversion or exchange of water, control of floods, conservation and development of fish and wildlife resources, enhancement of recreation opportunities, and for other purposes, the Secretary shall construct, operate, and maintain the Central Arizona Project, consisting of the following principal works: (1) a system of main conduits and canals, including a main canal and pumping plants (Hayden-Rhodes Aqueduct and pumping plants), for diverting and carrying water from Lake Havasu to Orme Dam or suitable alternative, which system may have a capacity of 3,000 cubic feet per second or whatever lesser capacity is found to be feasible: Provided, That any capacity in the Hayden-Rhodes Aqueduct in excess of 2,500 cubic feet per second shall be utilized for the conveyance of Colorado River water only when Lake Powell is full or releases of water are made from Lake Powell to prevent the reservoir from exceeding elevation 3,700 feet above mean sea level or when releases are made pursuant to the proviso in [section 1552(a)(3) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1552/a/3&num=0&edition=prelim): Provided further, That the costs of providing any capacity in excess of 2,500 cubic feet per second shall be repaid by those funds available to Arizona pursuant to the provision of [section 1543(f) of this title](h

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1521

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: dc0cad31cf7c081e9f36190b8f79d140259c713147d4004958490c07508ccf53. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_096fd80af1e3a9a068985c17
Source file: Laws/federal/codes/united-states-code/title-43/section-1521-central-arizona-project--5a0e574526.md
Pages: Not recorded – Not recorded
Passage SHA-256: 420194bef143af4c07f3e66d656ac1e99f0a5cecc4817713e3fc001f0a2d2dc9

Source location: Title 43, Chapter 32, § 1521; chapter-032-colorado-river-basin-project.md

Stored source content

**(a) Construction and operation; Hayden-Rhodes Aqueduct and pumping plants; Orme Dam and Reservoir; Buttes Dam and Reservoir; Hooker Dam and Reservoir; Charleston Dam and Reservoir; Tucson aqueducts and pumping plants; Fannin-McFarland Aqueduct; related and appurtenant works** For the purposes of furnishing irrigation water and municipal water supplies to the water-deficient areas of Arizona and western New Mexico through direct diversion or exchange of water, control of floods, conservation and development of fish and wildlife resources, enhancement of recreation opportunities, and for other purposes, the Secretary shall construct, operate, and maintain the Central Arizona Project, consisting of the following principal works: (1) a system of main conduits and canals, including a main canal and pumping plants (Hayden-Rhodes Aqueduct and pumping plants), for diverting and carrying water from Lake Havasu to Orme Dam or suitable alternative, which system may have a capacity of 3,000 cubic feet per second or whatever lesser capacity is found to be feasible: Provided, That any capacity in the Hayden-Rhodes Aqueduct in excess of 2,500 cubic feet per second shall be utilized for the conveyance of Colorado River water only when Lake Powell is full or releases of water are made from Lake Powell to prevent the reservoir from exceeding elevation 3,700 feet above mean sea level or when releases are made pursuant to the proviso in [section 1552(a)(3) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1552/a/3&num=0&edition=prelim): Provided further, That the costs of providing any capacity in excess of 2,500 cubic feet per second shall be repaid by those funds available to Arizona pursuant to the provision of [section 1543(f) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1543/f&num=0&edition=prelim), or by funds from sources other than the development fund; (2) Orme Dam and Reservoir and power pumping plant or suitable alternative; (3) Buttes Dam and Reservoir, which shall be so operated as not to prejudice the rights of any user in and to the waters of the Gila River as those rights are set forth in the decree entered by the United States District Court for the District of Arizona on June 29, 1935, in United States against Gila Valley Irrigation District and others (Globe Equity Numbered 59); (4) Hooker Dam and Reservoir or suitable alternative, which shall be constructed in such a manner as to give effect to the provisions of subsection (f) of [section 1524 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1524&num=0&edition=prelim); (5) Charleston Dam and Reservoir; (6) Tucson aqueducts and pumping plants; (7) Fannin-McFarland Aqueduct; (8) related canals, regulating facilities, hydroelectric powerplants, and electric transmission facilities required for the operation of said principal works; (9) related water distribution and drainage works; and (10) appurtenant works. **(b) Limitation on water diversions in years of insufficient main stream Colorado River water** Article II(B)(3) of the decree of the Supreme Court of the United States in Arizona against California (376 U.S. 340) shall be so administered that in any year in which, as determined by the Secretary, there is insufficient main stream Colorado River water available for release to satisfy annual consumptive use of seven million five hundred thousand acre-feet in Arizona, California, and Nevada, diversions from the main stream for the Central Arizona Project shall be so limited as to assure the availability of water in quantities sufficient to provide for the aggregate annual consumptive use by holders of present perfected rights, by other users in the State of California served under existing contracts with the United States by diversion works heretofore constructed, and by other existing Federal reservations in that State, of four million four hundred thousand acre-feet of mainstream water, and by users of the same character in Arizona and Nevada. Water users in the State of Nevada shall not be required to bear shortages in any proportion greater than would have been imposed in the absence of this subsection. This subsection shall not affect the relative priorities, among themselves, of water users in Arizona, Nevada, and California which are senior to diversions for the Central Arizona Project, or amend any provisions of said decree. **(c) Augmentation of water supply of Colorado River system** The limitation stated in subsection (b) of this section shall not apply so long as the Secretary shall determine and proclaim that means are available and in operation which augment the water supply of the Colorado River system in such quantity as to make sufficient mainstream water available for release to satisfy annual consumptive use of seven million five hundred thousand acre-feet in Arizona, California, and Nevada.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1524 — Water furnished from Central Arizona Project

**(a) Restriction on use of water for irrigation** Unless and until otherwise provided by Congress, water from the Central Arizona Project shall not be made available directly or indirectly for the irrigation of lands not having a recent irrigation history as determined by the Secretary, except in the case of Indian lands, national wildlife refuges, and, with the approval of the Secretary, State-administered wildlife management areas. **(b) Contracts with municipal and industrial users** (1) Irrigation and municipal and industrial water supply under the Central Arizona Project within the State of Arizona may, in the event the Secretary determines that it is necessary to effect repayment, be pursuant to master contracts with organizations which have power to levy assessments against all taxable real property within their boundaries. The terms and conditions of contracts or other arrangements whereby each such organization makes water from the Central Arizona Project available to users within its boundaries shall be subject to the Secretary’s approval, and the United States shall, if the Secretary determines such action is desirable to facilitate carrying out the provisions of this chapter, have the right to require that it be a party to such contracts or that contracts subsidiary to the master contracts be entered into between the United States and any user. The provisions of this clause (1) shall not apply to the supplying of water to an Indian tribe for use within the boundaries of an Indian reservation. (2) Any obligation assumed pursuant to [section 485h(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section485h/d&num=0&edition=prelim) with respect to any project contract unit or irrigation block shall be repaid over a basic

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1524

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 390rr — Central Arizona Project

Lands receiving irrigation water pursuant to a contract with the Secretary as authorized under title III of the Colorado River Basin Project Act (82 Stat. 887; [43 U.S.C. 1521](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1521&num=0&edition=prelim) et seq.) which are placed under recordable contract shall be eligible to receive irrigation water upon terms and conditions related to pricing established by the Secretary pursuant to Federal reclamation law in effect immediately prior to October 12, 1982, for a period of time not to exceed ten years from the date such lands are capable of being served with irrigation water, as determined by the Secretary.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 390rr

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1521 — Central Arizona Project

Page 400 TITLE 43—PUBLIC LANDS § 1512 sources of the western United States authorized by the Colorado River Basin Project Act [43 U.S.C. 1501 et seq.]. (Pub. L. 91–611, title II, § 203, Dec. 31, 1970, 84 Stat. 1828.) Editorial Notes REFERENCES IN TEXT The Colorado River Basin Project Act, referred to in text, is Pub. L. 90–537, Sept. 30, 1968, 82 Stat. 885, which is classified principally to this chapter. For complete classification of this Act to the Code, see Short Title note set out under section 1501 of this title and Tables. CODIFICATION Section was not enacted as part of the Colorado River Basin Project Act which comprises this chapter. § 1512. Mexican Water Treaty The Congress declares that the satisfaction of the requirements of the Mexican Water Treaty from the Colorado River constitutes a national obligation which shall be the first obligation of any water augmentation project planned pursu- ant to section 1511 of this title and authorized by the Congress. Accordingly, the States of the Upper Division (Colorado, New Mexico, Utah, and Wyoming) and the States of the Lower Divi- sion (Arizona, California, and Nevada) shall be relieved from all obligations which may have been imposed upon them by article III(c) of the Colorado River Compact so long as the Sec- retary shall determine and proclaim that means are available and in operation which augment the water supply of the Colorado River system in such quantity as to satisfy the requirements of the Mexican Water Treaty together with any losses of water associated with the performance of that treaty: Provided, That the satisfaction of the requirements of the Mexican Water Treaty (Treaty Series 994, 59 Stat. 1219), shall be from the waters of the Colorado River pursuant to the tre

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 1521

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.