Browse Arkansas Code titles and sections
42 U.S.C. § 2297f–1 — Licensing of other technologies
Federal law — U.S. Code and appendices · legal_authorities
**(a) In general** Corporation facilities using alternative technologies for uranium enrichment, including AVLIS, shall be licensed under sections 2073, 2093, and 2243 of this title.
**(b) Costs for decontamination and decommissioning** The Corporation shall provide for the costs of decontamination and decommissioning of any Corporation facilities described in subsection (a) in accordance with the requirements of the amendments made by section 5 of the Solar, Wind, Waste, and Geothermal Power Production Act of 1990.
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 2297f–1
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 7e9469f38b0d6dd95a7e526c5d5c29a4aa360b47809df7cfcac481168c2767ba. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Record provenance
Stable record: federal_law:legal_authorities:record_usc_04bff5a8aa0bf8ac66764c41
Source file: Laws/federal/codes/united-states-code/title-42/section-2297f1-licensing-of-other-technologies--15bcec33dd.md
Pages: Not recorded – Not recorded
Passage SHA-256: f3d65d7fca107064b73cd40906caa3a2d82d142e5507b90dd56ed405a8febc7b
Source location: Title 42, Chapter 23, § 2297f–1; chapter-023-development-and-control-of-atomic-energy.md
Stored source content
**(a) In general** Corporation facilities using alternative technologies for uranium enrichment, including AVLIS, shall be licensed under sections 2073, 2093, and 2243 of this title.
**(b) Costs for decontamination and decommissioning** The Corporation shall provide for the costs of decontamination and decommissioning of any Corporation facilities described in subsection (a) in accordance with the requirements of the amendments made by section 5 of the Solar, Wind, Waste, and Geothermal Power Production Act of 1990.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Environmental impact statement**
(1) **Major Federal action** — The issuance of a license under sections 2073 and 2093 of this title for the construction and operation of any uranium enrichment facility shall be considered a major Federal action significantly affecting the quality of the human environment for purposes of the National Environmental Policy Act of 1969 ([42 U.S.C. 4321](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section4321&num=0&edition=prelim) et seq.).
(2) **Timing** — An environmental impact statement prepared under paragraph (1) shall be prepared before the hearing on the issuance of a license for the construction and operation of a uranium enrichment facility is completed.
**(b) Adjudicatory hearing**
(1) **In general** — The Commission shall conduct a single adjudicatory hearing on the record with regard to the licensing of the construction and operation of a uranium enrichment facility under sections 2073 and 2093 of this title.
(2) **Timing** — Such hearing shall be completed and a decision issued before the issuance of a license for such construction and operation.
(3) **Single proceeding** — No further Commission licensing action shall be required to authorize operation.
**(c) Inspection and operation** Prior to commencement of operation of a uranium enrichment facility licensed hereunder, the Commission shall verify through inspection that the facility has been constructed in accordance with the requirements of the license for construction and operation. The Commission shall publish notice of the inspection results in the Federal Register.
**(d) Insurance and decommissioning**
(1) The Commission shall require, as a condition of the issuance of a license under sections 2073 and 2093 of this title for a ur
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 2243
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.