Arkansas Legal Resource Navigator

23-3-513. Replacement of navigable water crossing.

Arkansas Code — all titles (historical 2020) · legal_authorities

23-3-513. Replacement of navigable water crossing.

23-3-513. Replacement of navigable water crossing. (a) In each instance where a river crossing proprietor may desire to replace a navigable water crossing, it shall file with the Arkansas Public Service Commission a proper petition pursuant to § 23-3-504. (b)(1) Proceedings upon the petition shall be conducted under §§ 23-3-506, 23-3-507, and 23-3-510, subject to appeal as provided in §§ 23-3-511 and 23-3-512. (2) In such a proceeding, however, the jurisdiction of the commission will be limited to a determination of whether the construction methods to be employed in replacing the navigable water crossing will jeopardize the public safety, and the river crossing proprietor's right to replace a navigable water crossing may be denied only on that ground.

Source: Arkansas Code — historical release 78 (November 6, 2020) · 23-3-513

Stored review status: Historical 2020-11-06 source release; later amendments not reconciled; machine-extracted, not independently legally reviewed; source heading status: text_in_historical_source. A text match is a research starting point; applicability is not established.

Issuing source page ↗

Authority boundary: historical statutory source snapshot not current law.

Open the recorded source website ↗

Record provenance

Stable record: arkansas_code:legal_authorities:23-3-513
Source file: gov.ar.code.title.23.odt
Pages: Not recorded – Not recorded
Passage SHA-256: 7865c1dbf2eb9fb1126c9119dd54840770d9e8526486f88b3cf2105549565067

Source location: content.xml paragraph 2503

Stored source content

23-3-513. Replacement of navigable water crossing. (a) In each instance where a river crossing proprietor may desire to replace a navigable water crossing, it shall file with the Arkansas Public Service Commission a proper petition pursuant to § 23-3-504. (b)(1) Proceedings upon the petition shall be conducted under §§ 23-3-506, 23-3-507, and 23-3-510, subject to appeal as provided in §§ 23-3-511 and 23-3-512. (2) In such a proceeding, however, the jurisdiction of the commission will be limited to a determination of whether the construction methods to be employed in replacing the navigable water crossing will jeopardize the public safety, and the river crossing proprietor's right to replace a navigable water crossing may be denied only on that ground.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Arkansas Code — all titles (historical 2020) · legal_authorities

23-3-504. Petition regarding operation.

23-3-504. Petition regarding operation. Pursuant to the authority granted in this subchapter, the Arkansas Public Service Commission shall require any river crossing proprietor operating or proposing to operate a navigable water crossing to file a verified petition with the commission showing such data and specifications in relation thereto as the commission may reasonably prescribe. The petition may include the following: (1) The name of the river crossing proprietor and the nature of its organization and the nature of its business; (2) The river crossing proprietor's principal office and place of business; (3) A map, based upon a ground survey, showing the location of the public service facility at the point of the existing or proposed navigable water crossing, a drawing showing in some detail the specifications of the proposed crossing, and a profile plat showing, with respect to the mean surface level and the bed of the navigable waterway, the elevations of the existing or proposed public service facility; (4) A general description of the physical nature of the bed underlying the navigable waterway at the point of the existing or proposed navigable water crossing, if the crossing is to be constructed on the underlying bed; (5) A description of materials and the type of construction employed or to be employed in effecting the navigable water crossing; (6) The size, capacity, and purpose of the public service facilities at the point of the navigable water crossing, together with operating conditions and safety factors; (7) A showing of approval or permissive authorization of the existing or proposed navigable water crossing by the United States Secretary of Defense or the United States Secretary of the Army or other federal agency having jurisdiction to

Source: Arkansas Code — historical release 78 (November 6, 2020) · 23-3-504

Stored review status: Historical 2020-11-06 source release; later amendments not reconciled; machine-extracted, not independently legally reviewed; source heading status: text_in_historical_source. The source passage cites 23-3-504. This identifies an authority to review, not proof of applicability.

Arkansas Code — all titles (historical 2020) · legal_authorities

23-3-506. Objections to petition.

23-3-506. Objections to petition. Any person, corporation, company, municipal agency, state agency, or institution whose rights or interests may be affected by such a proposed navigable water crossing may file written objections to the granting of the prayer of the petition.

Source: Arkansas Code — historical release 78 (November 6, 2020) · 23-3-506

Stored review status: Historical 2020-11-06 source release; later amendments not reconciled; machine-extracted, not independently legally reviewed; source heading status: text_in_historical_source. The source passage cites 23-3-506. This identifies an authority to review, not proof of applicability.

Arkansas Code — all titles (historical 2020) · legal_authorities

23-3-507. Grant of petition — Exceptions.

23-3-507. Grant of petition — Exceptions. (a) Upon the hearing, if it appears that the United States Secretary of the Army, or such other federal agency as may have jurisdiction to consent to the construction of erections in navigable waterways, has approved or permissively authorized the proposed navigable water crossings, then the Arkansas Public Service Commission shall grant the prayer of the river crossing proprietor's petition unless the commission enters specific findings, based on a preponderance of the evidence, that: (1) The proposed navigable water crossing, if constructed and operated as proposed, will jeopardize the public safety; or (2) The construction of the proposed navigable water crossing at the point specified in the petition will result in an unlawful interference with some other paramount public or private use of the navigable waterway or its underlying bed at the point of the proposed crossing. (b) In the event the commission finds that the proposed navigable water crossing would jeopardize the public safety if constructed and operated as proposed, it may grant the prayer of the river crossing proprietor's petition subject to such alteration of the proposed plans, specifications, and construction methods as may be in the interest of the public safety.

Source: Arkansas Code — historical release 78 (November 6, 2020) · 23-3-507

Stored review status: Historical 2020-11-06 source release; later amendments not reconciled; machine-extracted, not independently legally reviewed; source heading status: text_in_historical_source. The source passage cites 23-3-507. This identifies an authority to review, not proof of applicability.

Arkansas Code — all titles (historical 2020) · legal_authorities

23-3-510. Costs and expenses of proceedings — Damages.

23-3-510. Costs and expenses of proceedings — Damages. The Arkansas Public Service Commission shall require the applicant to pay all costs and expenses of a proceeding under this subchapter.

Source: Arkansas Code — historical release 78 (November 6, 2020) · 23-3-510

Stored review status: Historical 2020-11-06 source release; later amendments not reconciled; machine-extracted, not independently legally reviewed; source heading status: text_in_historical_source. The source passage cites 23-3-510. This identifies an authority to review, not proof of applicability.