23-18-511. Application for certificate — Contents generally.

23-18-511. Application for certificate — Contents generally. An applicant for a certificate shall file with the Arkansas Public Service Commission a verified application in the form required by the commission and containing the following information: (1) A general description of the location and type of the major utility facility proposed to be built; (2) A general description of any reasonable alternate location or locations considered for the proposed facility; (3) A statement of the need and reasons for construction of the facility, including, if applicable, a reference to any prior commission action in an energy resource declaration-of-need proceeding determining the need for additional energy supply or transmission resources by the public utility; (4) A statement of the estimated costs of the major utility facility and the proposed method of financing the construction of the major utility facility; (5)(A) A general description of any reasonable alternate methods of financing the construction of the major utility facility and a description of the comparative merits and detriments of each alternate financing method considered. (B) If at the time of filing of the application the federal income tax laws and the state laws would permit the issuance of tax-exempt bonds to finance the construction of the proposed major utility facility for the applicant by a state financing agency, the application shall also include a discussion of the merits and detriments of financing the major utility facility with the bonds; (6) An analysis of the projected economic or financial impact on the applicant and the local community in which the major utility facility is to be located as a result of the construction and the operation of the proposed major utility facility; (7

Source: Arkansas Code — historical release 78 (November 6, 2020) · 23-18-511

Stored review status: Historical 2020-11-06 source release; later amendments not reconciled; machine-extracted, not independently legally reviewed; source heading status: text_in_historical_source. A text match is a research starting point; applicability is not established.

Issuing source page ↗

Authority boundary: historical statutory source snapshot not current law.

Open the recorded source website ↗

Record provenance

Stable record: arkansas_code:legal_authorities:23-18-511
Source file: gov.ar.code.title.23.odt
Pages: Not recorded – Not recorded
Passage SHA-256: 735e63cfec6630caf0579fd0e5006446c810cb10597b8f0e7d901c67d86e9290

Source location: content.xml paragraph 14488

Stored source content

23-18-511. Application for certificate — Contents generally. An applicant for a certificate shall file with the Arkansas Public Service Commission a verified application in the form required by the commission and containing the following information: (1) A general description of the location and type of the major utility facility proposed to be built; (2) A general description of any reasonable alternate location or locations considered for the proposed facility; (3) A statement of the need and reasons for construction of the facility, including, if applicable, a reference to any prior commission action in an energy resource declaration-of-need proceeding determining the need for additional energy supply or transmission resources by the public utility; (4) A statement of the estimated costs of the major utility facility and the proposed method of financing the construction of the major utility facility; (5)(A) A general description of any reasonable alternate methods of financing the construction of the major utility facility and a description of the comparative merits and detriments of each alternate financing method considered. (B) If at the time of filing of the application the federal income tax laws and the state laws would permit the issuance of tax-exempt bonds to finance the construction of the proposed major utility facility for the applicant by a state financing agency, the application shall also include a discussion of the merits and detriments of financing the major utility facility with the bonds; (6) An analysis of the projected economic or financial impact on the applicant and the local community in which the major utility facility is to be located as a result of the construction and the operation of the proposed major utility facility; (7) An analysis of the estimated effects on energy costs to the consumer as a result of the construction and operation of the proposed major utility facility; (8)(A) An exhibit containing an environmental impact statement that fully develops the six (6) factors listed in subdivision (8)(B) of this section, treating in reasonable detail such considerations, if applicable, as: (i) The proposed major utility facility's direct and indirect effect on the following in the area in which the major utility facility is to be located: (a) The ecology of the land, air, and water environment; (b) Established park and recreational areas; and (c) Any sites of natural, historic, and scenic values and resources of the area in which the major utility facility is to be located; and (ii) Any other relevant environmental effects. (B) The environmental impact statement shall state: (i) The environmental impact of the proposed action; (ii) Any adverse environmental effects that cannot be avoided; (iii) A description of the comparative merits and detriments of each alternate location considered for the major utility facility; (iv) For generating plants, the energy production process considered; (v) A statement of the reasons why the proposed location and production process were selected for the major utility facility; and (vi) Any irreversible and irretrievable commitments of resources that would be involved in the proposed action should it be implemented; (9) The interstate benefits expected to be achieved by the proposed construction or modification of an electric transmission line and associated facilities, as described in § 23-18-503(6)(B), that is located within a national interest electric transmission corridor; and (10) Such other information of an environmental or economic nature as the applicant may consider relevant or as the commission may by rule or order require.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Arkansas Code — all titles (historical 2020) · legal_authorities

23-18-503. Definitions.

23-18-503. Definitions. As used in this subchapter: (1) “Applicant” means the utility or other person making application to the Arkansas Public Service Commission for a certificate of environmental compatibility and public need; (2)(A) “Commence to construct” means any clearing of land, excavation, or other action that would adversely affect the natural environment of the site or route of a major utility facility. (B) “Commence to construct” does not include: (i) Changes needed for temporary use of sites or routes for nonutility purposes; or (ii) Uses in securing survey or geological data, including necessary borings to ascertain foundation conditions; (3) “Commission” means the Arkansas Public Service Commission; (4) “Energy-efficient” means economical in the use of energy; (5) “Energy resource declaration-of-need proceeding” means a utility-specific proceeding conducted by the Arkansas Public Service Commission under §§ 23-18-106 and 23-18-107 and the rules adopted thereunder to determine the need for additional energy supply and transmission resources by a public utility; (6) “Major utility facility” means: (A) An electric generating plant and associated transportation and storage facilities for fuel and other facilities designed for or capable of operation at a capacity of fifty megawatts (50 MW) or more; (B) For the sole purpose of requiring an environmental impact statement under this subchapter, an electric transmission line and associated facilities including substations of: (i) A design voltage of one hundred kilovolts (100 kV) or more and extending a distance of more than ten (10) miles; or (ii) A design voltage of one hundred seventy kilovolts (170 kV) or more and extending a distance of more than one (1) mile; or (C) For the sole

Source: Arkansas Code — historical release 78 (November 6, 2020) · 23-18-503

Stored review status: Historical 2020-11-06 source release; later amendments not reconciled; machine-extracted, not independently legally reviewed; source heading status: text_in_historical_source. The source passage cites 23-18-503. This identifies an authority to review, not proof of applicability.