22-9-212. Public improvements generally — Trench or excavation safety systems. (a) Whenever any agency of this state or of any county, municipality, or school district, or other local taxing unit or improvement district, enters into a contract covered by the provisions of §§ 22-9-202 — 22-9-204 for the making of repairs or alterations or the erection of buildings or for the making of any other improvements, or for the construction or improvement of highways, roads, streets, sidewalks, curbs, gutters, drainage or sewer projects, or for any other construction project in which the public work or public improvement construction project involves any trench or excavation which equals or exceeds five feet (5') in depth, the agency, county, municipality, school district, local taxing unit, or improvement district shall require: (1) That the current edition of Occupational Safety and Health Administration Standard for Excavation and Trenches Safety System, 29 C.F.R. Part 1926, Subpart P, be specifically incorporated into the specifications for the project; and (2) That the contract bid form include a separate pay item for trench or excavation safety systems to be included in the base bid. (b) In the event a contractor fails to complete a separate pay item in accordance with the applicable provisions of subsection (a) of this section, the agency, county, municipality, school district, local taxing unit, or improvement district shall declare that the bid fails to comply fully with the provisions of the specifications and bid documents and will be considered invalid as a nonresponsive bid. The owners of the above-stated project shall notify the Safety Division of the Division of Labor of the award of a contract covered by this section.

Source: Arkansas Code — historical release 78 (November 6, 2020) · 22-9-212

Stored review status: Historical 2020-11-06 source release; later amendments not reconciled; machine-extracted, not independently legally reviewed; source heading status: text_in_historical_source. A text match is a research starting point; applicability is not established.

Issuing source page ↗

Authority boundary: historical statutory source snapshot not current law.

Open the recorded source website ↗

Record provenance

Stable record: arkansas_code:legal_authorities:22-9-212
Source file: gov.ar.code.title.22.odt
Pages: Not recorded – Not recorded
Passage SHA-256: b102b3a5626d6c48b24d98e1dfeebc0c3086340a38df5c69f8330cf51868d524

Source location: content.xml paragraph 6853

Stored source content

22-9-212. Public improvements generally — Trench or excavation safety systems. (a) Whenever any agency of this state or of any county, municipality, or school district, or other local taxing unit or improvement district, enters into a contract covered by the provisions of §§ 22-9-202 — 22-9-204 for the making of repairs or alterations or the erection of buildings or for the making of any other improvements, or for the construction or improvement of highways, roads, streets, sidewalks, curbs, gutters, drainage or sewer projects, or for any other construction project in which the public work or public improvement construction project involves any trench or excavation which equals or exceeds five feet (5') in depth, the agency, county, municipality, school district, local taxing unit, or improvement district shall require: (1) That the current edition of Occupational Safety and Health Administration Standard for Excavation and Trenches Safety System, 29 C.F.R. Part 1926, Subpart P, be specifically incorporated into the specifications for the project; and (2) That the contract bid form include a separate pay item for trench or excavation safety systems to be included in the base bid. (b) In the event a contractor fails to complete a separate pay item in accordance with the applicable provisions of subsection (a) of this section, the agency, county, municipality, school district, local taxing unit, or improvement district shall declare that the bid fails to comply fully with the provisions of the specifications and bid documents and will be considered invalid as a nonresponsive bid. The owners of the above-stated project shall notify the Safety Division of the Division of Labor of the award of a contract covered by this section.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Arkansas Code — all titles (historical 2020) · legal_authorities

22-9-202. Construction of this section and §§ 22-9-203 and 22-9-204.

22-9-202. Construction of this section and §§ 22-9-203 and 22-9-204. (a) It is the intent of this section and §§ 22-9-203 and 22-9-204 to provide a uniform procedure that a taxing unit shall follow when work is done under formal contract. (b)(1) This section and §§ 22-9-203 and 22-9-204 do not: (A) Prevent a taxing unit from performing any of the work or making any of the improvements referred to in this section and §§ 22-9-203 and 22-9-204 by the use of its own employees; or (B) Require that bids must be received from a contractor as a condition precedent to the right to use the taxing unit's own employees. (2) This section and §§ 22-9-203 and 22-9-204 do not prevent a county government from separately procuring: (A) Commodities in accordance with § 14-22-101 et seq.; (B) Professional services in accordance with § 19-11-801 et seq.; or (C) Construction work from one (1) or more separate contractors under separate contract or invoice so that the work is not included in calculating the bid requirement threshold of thirty-five thousand dollars ($35,000). (c) This section and §§ 22-9-203 and 22-9-204 do not amend or repeal any law that requires the publication of notice in those instances in which the estimated amount of the cost of the proposed improvements within the scope of the contract is more than thirty-five thousand dollars ($35,000).

Source: Arkansas Code — historical release 78 (November 6, 2020) · 22-9-202

Stored review status: Historical 2020-11-06 source release; later amendments not reconciled; machine-extracted, not independently legally reviewed; source heading status: text_in_historical_source. The source passage cites 22-9-202. This identifies an authority to review, not proof of applicability.

Arkansas Code — all titles (historical 2020) · legal_authorities

22-9-204. Subcontractors exceeding $50,000 — Penalty.

22-9-204. Subcontractors exceeding $50,000 — Penalty. (a) As a condition to performing construction work for and in the State of Arkansas, all prime contractors shall use no other subcontractors when the subcontractors' portion of the project is fifty thousand dollars ($50,000) or more, except those licensed by the Contractors Licensing Board and qualified in: (1) Mechanical, indicative of heating, air conditioning, ventilation, and refrigeration; (2) Plumbing; (3) Electrical; and (4) Roofing. (b)(1) In the event the prime contractor is qualified and licensed by the board, he or she may use his or her own forces to perform those tasks listed in this section as subcontractors in one (1) or more of the trades listed. (2)(A) A subcontractor, including the situation stated in subdivision (b)(1) of this section, may subcontract a portion of the listed work. (B) However, a subcontractor is prohibited from subcontracting the work in its entirety. (c)(1) When the prime contractor makes a definite decision regarding the subcontractors he or she intends to use, he or she shall place the name of each subcontractor in a blank space provided on the form of proposal of his or her bid. (2) In the event that one (1) or more of the subcontractors named by the prime contractor in his or her successful bid thereafter refuses to perform his or her contract or offered contract, the prime contractor may substitute another subcontractor licensed by the board after having obtained prior approval from the architect or engineer and the owner. Additional approval must be obtained from the Building Authority Division for capital improvement projects under its jurisdiction. (d) The prime contractor shall submit written evidence that the substituted contractor is costing the sa

Source: Arkansas Code — historical release 78 (November 6, 2020) · 22-9-204

Stored review status: Historical 2020-11-06 source release; later amendments not reconciled; machine-extracted, not independently legally reviewed; source heading status: text_in_historical_source. The source passage cites 22-9-204. This identifies an authority to review, not proof of applicability.