20-23-307. New boilers and unfired pressure vessels — Permit required.
Arkansas Code — all titles (historical 2020) · legal_authorities
20-23-307. New boilers and unfired pressure vessels — Permit required.
(a) Every manufacturer, contractor, jobber, owner, or user of a boiler or unfired pressure vessel or pressure piping system shall obtain a permit from the Boiler Inspection Division before any boiler or unfired pressure vessel or pressure piping system may be installed or moved and installed in the State of Arkansas.
(b) When new boilers or unfired pressure vessels are to be installed, the manufacturer's data report for each boiler and unfired pressure vessel shall be submitted with the application for installation.
(c) No boiler or unfired pressure vessel or pressure piping may be installed without approval from the division.
Source: Arkansas Code — historical release 78 (November 6, 2020) · 20-23-307
Stored review status: Historical 2020-11-06 source release; later amendments not reconciled; machine-extracted, not independently legally reviewed; source heading status: text_in_historical_source. A text match is a research starting point; applicability is not established.
Issuing source page ↗
Authority boundary: historical statutory source snapshot not current law.
Open the recorded source website ↗
Record provenance
Stable record: arkansas_code:legal_authorities:20-23-307
Source file: gov.ar.code.title.20.odt
Pages: Not recorded – Not recorded
Passage SHA-256: f5c73e635aecf4245dcaa9432d0ea5b2804a88539e7a36fc3a0b411f980d86ec
Source location: content.xml paragraph 21288
Stored source content
20-23-307. New boilers and unfired pressure vessels — Permit required.
(a) Every manufacturer, contractor, jobber, owner, or user of a boiler or unfired pressure vessel or pressure piping system shall obtain a permit from the Boiler Inspection Division before any boiler or unfired pressure vessel or pressure piping system may be installed or moved and installed in the State of Arkansas.
(b) When new boilers or unfired pressure vessels are to be installed, the manufacturer's data report for each boiler and unfired pressure vessel shall be submitted with the application for installation.
(c) No boiler or unfired pressure vessel or pressure piping may be installed without approval from the division.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
No explicit source connection was found. This does not mean there are no relevant authorities.