15-58-403. Costs of projects. The costs for each proposed project under the abandoned mine reclamation program shall include: (1) Actual construction costs; (2) Actual operation and maintenance costs of permanent facilities; (3) Planning and engineering costs; (4) Construction inspection costs; and (5) Other necessary administrative expenses.

Source: Arkansas Code — historical release 78 (November 6, 2020) · 15-58-403

Stored review status: Historical 2020-11-06 source release; later amendments not reconciled; machine-extracted, not independently legally reviewed; source heading status: text_in_historical_source. A text match is a research starting point; applicability is not established.

Issuing source page ↗

Authority boundary: historical statutory source snapshot not current law.

Open the recorded source website ↗

Record provenance

Stable record: arkansas_code:legal_authorities:15-58-403
Source file: gov.ar.code.title.15.odt
Pages: Not recorded – Not recorded
Passage SHA-256: 3d9645e9416f2008a823e175dd819f3e2dc8a492f2b0314a0a898a5d04351e21

Source location: content.xml paragraph 22584

Stored source content

15-58-403. Costs of projects. The costs for each proposed project under the abandoned mine reclamation program shall include: (1) Actual construction costs; (2) Actual operation and maintenance costs of permanent facilities; (3) Planning and engineering costs; (4) Construction inspection costs; and (5) Other necessary administrative expenses.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

No explicit source connection was found. This does not mean there are no relevant authorities.