15-57-404. Notification of intent to quarry.

Arkansas Code — all titles (historical 2020) · legal_authorities

15-57-404. Notification of intent to quarry.

15-57-404. Notification of intent to quarry. (a)(1) Except for operators of quarries excluded by § 15-57-403(b), any operator desiring to engage in quarrying shall complete a notification of intent to quarry which when submitted to the Division of Environmental Quality by certified mail will entitle said operator to conduct quarry operations. (2)(A) For all active quarries, as of January 1, 1998, a notification of intent must be on file or in process at the division. (B) For all new quarries to be opened after January 1, 1998, a notification of intent must be on file or in process at the division before the operator may begin quarry operations. (3) The notification shall be accompanied by the payment of a fee of two hundred fifty dollars ($250). (4) The submittal shall be an agreement between the operator and the division. (5) The operator shall pay an annual fee to the division in the amount of twenty-five dollars ($25.00) per acre of affected land, not to exceed one thousand dollars ($1,000) per quarry. (6) The notification of intent shall include one (1) copy of the following: (A) The company name, officers, majority of ownership, on-site superintendents, addresses, name of quarry, phone numbers, anticipated start up and shut down dates; (B) The following right to quarry, signed and notarized: “I, the operator of [quarry name] located at [legal description in county], have the legal right by deeds, leases, or other instruments to conduct quarry operations for commercial and other purposes at this location. I will comply with all state and federal laws, rules, and regulations in this operation. Company Name President Secretary”; Click to view form. (C) A location map which contains the following: (i) A seven-and-a-half-foot topographic qua

Source: Arkansas Code — historical release 78 (November 6, 2020) · 15-57-404

Stored review status: Historical 2020-11-06 source release; later amendments not reconciled; machine-extracted, not independently legally reviewed; source heading status: text_in_historical_source. A text match is a research starting point; applicability is not established.

Issuing source page ↗

Authority boundary: historical statutory source snapshot not current law.

Open the recorded source website ↗

Record provenance

Stable record: arkansas_code:legal_authorities:15-57-404
Source file: gov.ar.code.title.15.odt
Pages: Not recorded – Not recorded
Passage SHA-256: 6c0df2347ecc06860af39021ef77e14121358ed756104defef97bd35c6fd7b39

Source location: content.xml paragraph 21792

Stored source content

15-57-404. Notification of intent to quarry. (a)(1) Except for operators of quarries excluded by § 15-57-403(b), any operator desiring to engage in quarrying shall complete a notification of intent to quarry which when submitted to the Division of Environmental Quality by certified mail will entitle said operator to conduct quarry operations. (2)(A) For all active quarries, as of January 1, 1998, a notification of intent must be on file or in process at the division. (B) For all new quarries to be opened after January 1, 1998, a notification of intent must be on file or in process at the division before the operator may begin quarry operations. (3) The notification shall be accompanied by the payment of a fee of two hundred fifty dollars ($250). (4) The submittal shall be an agreement between the operator and the division. (5) The operator shall pay an annual fee to the division in the amount of twenty-five dollars ($25.00) per acre of affected land, not to exceed one thousand dollars ($1,000) per quarry. (6) The notification of intent shall include one (1) copy of the following: (A) The company name, officers, majority of ownership, on-site superintendents, addresses, name of quarry, phone numbers, anticipated start up and shut down dates; (B) The following right to quarry, signed and notarized: “I, the operator of [quarry name] located at [legal description in county], have the legal right by deeds, leases, or other instruments to conduct quarry operations for commercial and other purposes at this location. I will comply with all state and federal laws, rules, and regulations in this operation. Company Name President Secretary”; Click to view form. (C) A location map which contains the following: (i) A seven-and-a-half-foot topographic quad map as prepared by the United States Geological Survey; (ii) Clearly marked legal boundaries of area to be quarried; (iii) Clearly defined entrances onto public roads; (iv) Present use of the property; and (v) A legal description; (D) A five-year quarry operation map which contains the following: (i) Scaled dimensions, that is, one to two hundred (1:200); (ii) Approximate property boundaries; (iii) The location and identification of all affected lands to the nearest acre, anticipated for up to five (5) years; (iv) All pertinent manmade and natural structures including the plant location and the location of safeguarding items as required by § 15-57-410; (v) Location of topsoil and spoil stockpiles; (vi) Entrances onto public roads; and (vii) Areas of natural rock exposure (no topsoil or spoil); and (E) Notification of intent to reclaim quarry: “I, operator of [quarry name] located at [legal description in County], agree to reclaim said described quarry in conformance with the Arkansas Quarry Operation, Reclamation, and Safe Closure Act, when the quarry is exhausted. President Company Name Secretary”. Click to view form. (b) The operator's financial plan for reclamation will include: (1) An estimate of reclamation cost; and (2) An acceptable bond or substitute security. (c) All operators will have sixty (60) days to correct any errors or omissions to a notification of intent if notified by the division that a notification of intent is incomplete. (d) A fine of not more than one hundred dollars ($100) per day, per citation, may be levied against an operator whose notification of intent is not completed and on file in the division within sixty (60) days after receipt of notice by the division of errors and omissions in the first filing. The maximum fine is five thousand dollars ($5,000). (e) A fine of not more than one hundred dollars ($100) per day, per citation, may be levied against operators which are found to be out of compliance with these requirements. The maximum fine is five thousand dollars ($5,000).

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Arkansas Code — all titles (historical 2020) · legal_authorities

15-57-403. Notification — Filing — Public notice and response.

15-57-403. Notification — Filing — Public notice and response. (a) It shall be unlawful for any operator to engage in a quarrying operation without first submitting to the Division of Environmental Quality a notification of intent to quarry or a notification of reactivated quarry in accordance with this subchapter. The submittal, with returned receipt, shall enable the operator to begin or continue quarrying as long as the required reclamation bond is in force and proof of public notification is included. An operator shall be deemed to be quarrying from the time he or she begins start-up until reclamation is completed at the exhausted quarry. (b) Only new quarries or any land purchased or leased for a quarry after January 1, 1997, will be subject to this subchapter. (c) There will be no requirements for a notification of intent to be filed with the division for temporarily closed or exhausted quarries in existence prior to January 1, 1998. These quarries will be exempt from the requirements of this subchapter unless reactivated. (d) A new notification of intent to quarry shall be required if a change in the majority ownership of an operator occurs. (e) Representatives of the division may make regular site visits to quarry operations, as necessary, to determine compliance with the requirements of the operator's notification. On these visits the operator will make his or her quarry operation accessible to the division. (f) Upon receipt of notifications of intent, the division will have ninety (90) days to respond to the operator by certified mail to errors or omissions, or both, in the notifications. (g) On completion of a notification, the division will issue the operator a notice which will be posted on quarry premises at all times when the quarry is in op

Source: Arkansas Code — historical release 78 (November 6, 2020) · 15-57-403

Stored review status: Historical 2020-11-06 source release; later amendments not reconciled; machine-extracted, not independently legally reviewed; source heading status: text_in_historical_source. The source passage cites 15-57-403. This identifies an authority to review, not proof of applicability.

Arkansas Code — all titles (historical 2020) · legal_authorities

15-57-410. Site safety.

15-57-410. Site safety. The quarry operator will take the following measures to safeguard the operations for the benefit of neighbors and other citizens and to restrain trespassers from entering onto the quarry or plant site: (1) One (1) or a combination of the following will be installed around the quarry and plant site to complement natural barriers to trespassing as required: (A) A minimum four-foot high, four-strand barbed wire fence boundary attached to steel posts; (B) A five-foot high earth berm or rock berm, or both, with slopes steeper than one and five-tenths to one (1.5:1) and a minimum top width of five feet (5'); and (C) A protective barrier of boulders, concrete, or other objects capable of discouraging pedestrian or vehicular traffic; (2) Brightly colored warning signs (blaze orange is recommended) will be installed every three hundred feet (300') in clear view; (3) Barriers or lockable gates capable of withstanding normal vandalism are to be installed at all quarry site entrances. During temporary closure and after full reclamation of an exhausted quarry, barriers of rock or securely locked gates will be installed at all entrances on safety benches and haul roads so that no traffic or dumping can occur on the affected lands or in the quarry itself; (4) After January 1, 1998, no active quarry wall will be closer than fifty feet (50') to a public road right-of-way where the quarry's adjacent floor elevation is at or above the elevation of the right-of-way of the public road at the property line. Where active quarry floors are below said right-of-way, quarrying will be permitted only after a vegetated berm a minimum of ten feet (10') high, eight feet (8') wide at the crest, and with one-and-five-tenths-to-one slopes is installed for public sa

Source: Arkansas Code — historical release 78 (November 6, 2020) · 15-57-410

Stored review status: Historical 2020-11-06 source release; later amendments not reconciled; machine-extracted, not independently legally reviewed; source heading status: text_in_historical_source. The source passage cites 15-57-410. This identifies an authority to review, not proof of applicability.