Arkansas Legal Resource Navigator

14-249-104. Employment of inspector.

Arkansas Code — all titles (historical 2020) · legal_authorities

14-249-104. Employment of inspector.

14-249-104. Employment of inspector. (a) The board of commissioners of any sewer district may employ an inspector and fix the inspector's compensation, which shall be a portion of each connection fee collected. (b) The inspector shall make an inspection after the party making the connection has excavated down to the sewer main but before the sewer main is tapped, and then the inspector shall make a second inspection after the tap or connection is made to the sewer main but before the section of the sewer main, which is tapped, is backfilled with earth, so that the inspector can see that the connection is properly made and well cemented in place. (c) Where two (2) or more sewer districts embrace an area that is adjacent to or overlapped by the various sewer districts, the boards of the several sewer districts may jointly employ an inspector who shall look after connections on the lines of the different sewer systems by which he is employed, in which case, the permit issued shall show not only the location of the connection to be made, for which the permit was issued, but on the lines of what sewer district the connection is to be made.

Source: Arkansas Code — historical release 78 (November 6, 2020) · 14-249-104

Stored review status: Historical 2020-11-06 source release; later amendments not reconciled; machine-extracted, not independently legally reviewed; source heading status: text_in_historical_source. A text match is a research starting point; applicability is not established.

Issuing source page ↗

Authority boundary: historical statutory source snapshot not current law.

Open the recorded source website ↗

Record provenance

Stable record: arkansas_code:legal_authorities:14-249-104
Source file: gov.ar.code.title.14.odt
Pages: Not recorded – Not recorded
Passage SHA-256: 4c7fad91f6f1af44afbdeb7e78c0c17fef86fccd1f466905b30d26aaade792fb

Source location: content.xml paragraph 50549

Stored source content

14-249-104. Employment of inspector. (a) The board of commissioners of any sewer district may employ an inspector and fix the inspector's compensation, which shall be a portion of each connection fee collected. (b) The inspector shall make an inspection after the party making the connection has excavated down to the sewer main but before the sewer main is tapped, and then the inspector shall make a second inspection after the tap or connection is made to the sewer main but before the section of the sewer main, which is tapped, is backfilled with earth, so that the inspector can see that the connection is properly made and well cemented in place. (c) Where two (2) or more sewer districts embrace an area that is adjacent to or overlapped by the various sewer districts, the boards of the several sewer districts may jointly employ an inspector who shall look after connections on the lines of the different sewer systems by which he is employed, in which case, the permit issued shall show not only the location of the connection to be made, for which the permit was issued, but on the lines of what sewer district the connection is to be made.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

No explicit source connection was found. This does not mean there are no relevant authorities.